{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,21]],"date-time":"2026-04-21T10:42:27Z","timestamp":1776768147437,"version":"3.51.2"},"reference-count":41,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2018,11,9]],"date-time":"2018-11-09T00:00:00Z","timestamp":1541721600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["OR Spectrum"],"published-print":{"date-parts":[[2019,3]]},"DOI":"10.1007\/s00291-018-0536-0","type":"journal-article","created":{"date-parts":[[2018,11,9]],"date-time":"2018-11-09T10:10:22Z","timestamp":1541758222000},"page":"1-43","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":25,"title":["Simultaneous lotsizing and scheduling considering secondary resources: a general model, literature review and classification"],"prefix":"10.1007","volume":"41","author":[{"given":"Martin","family":"W\u00f6rbelauer","sequence":"first","affiliation":[]},{"given":"Herbert","family":"Meyr","sequence":"additional","affiliation":[]},{"given":"Bernardo","family":"Almada-Lobo","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2018,11,9]]},"reference":[{"issue":"3","key":"536_CR1","doi-asserted-by":"publisher","first-page":"529","DOI":"10.1007\/s10589-009-9235-8","volume":"47","author":"B Almada-Lobo","year":"2010","unstructured":"Almada-Lobo B, Klabjan D, Carravilla MA, Oliveira JF (2010) Multiple machine continuous setup lotsizing with sequence-dependent setups. Comput Optim Appl 47(3):529\u2013552","journal-title":"Comput Optim Appl"},{"issue":"24","key":"536_CR2","doi-asserted-by":"publisher","first-page":"7315","DOI":"10.1080\/00207543.2010.535570","volume":"49","author":"C Almeder","year":"2011","unstructured":"Almeder C, Almada-Lobo B (2011) Synchronisation of scarce resources for a parallel machine lotsizing problem. Int J Prod Res 49(24):7315\u20137335","journal-title":"Int J Prod Res"},{"key":"536_CR3","volume-title":"Managing business process flows","author":"R Anupindi","year":"2014","unstructured":"Anupindi R, Chopra S, Deshmukh SD, Van Mieghem JA, Zemel E (2014) Managing business process flows, 3rd edn. Pearson Education Limited, London","edition":"3"},{"issue":"2","key":"536_CR4","doi-asserted-by":"publisher","first-page":"166","DOI":"10.1287\/msom.2.2.166.12349","volume":"2","author":"A Balakrishnan","year":"2000","unstructured":"Balakrishnan A, Geunes J (2000) Requirements planning with substitutions: exploiting bill-of-materials flexibility in production planning. Manuf Serv Oper Manag 2(2):166\u2013185","journal-title":"Manuf Serv Oper Manag"},{"key":"536_CR5","doi-asserted-by":"publisher","first-page":"1613","DOI":"10.1057\/jors.2011.159","volume":"63","author":"VCB Camargo","year":"2012","unstructured":"Camargo VCB, Toledo FMB, Almada-Lobo B (2012) Three time-based scale formulations for the two stage lot sizing and scheduling in process industries. J Oper Res Soc 63:1613\u20131630","journal-title":"J Oper Res Soc"},{"issue":"1","key":"536_CR6","doi-asserted-by":"publisher","first-page":"266","DOI":"10.1016\/j.ejor.2013.10.017","volume":"234","author":"VCB Camargo","year":"2014","unstructured":"Camargo VCB, Toledo FMB, Almada-Lobo B (2014) HOPS\u2014hamming-oriented partition search for production planning in the spinning industry. Eur J Oper Res 234(1):266\u2013277","journal-title":"Eur J Oper Res"},{"key":"536_CR7","volume-title":"Capacitated lot-sizing and scheduling with scarce setup resources","author":"K Copil","year":"2016","unstructured":"Copil K (2016) Capacitated lot-sizing and scheduling with scarce setup resources. Books on Demand, Norderstedt"},{"issue":"1","key":"536_CR8","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/s00291-015-0429-4","volume":"39","author":"K Copil","year":"2017","unstructured":"Copil K, W\u00f6rbelauer M, Meyr H, Tempelmeier H (2017) Simultaneous lotsizing and scheduling problems: a classification and review of models. OR Spectr 39(1):1\u201364","journal-title":"OR Spectr"},{"issue":"11","key":"536_CR9","doi-asserted-by":"publisher","first-page":"2987","DOI":"10.1016\/j.cor.2004.04.012","volume":"32","author":"SG Dastidar","year":"2005","unstructured":"Dastidar SG, Nagi R (2005) Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs. Comput Oper Res 32(11):2987\u20133005","journal-title":"Comput Oper Res"},{"issue":"1","key":"536_CR10","doi-asserted-by":"publisher","first-page":"73","DOI":"10.1016\/0925-5273(95)00040-U","volume":"40","author":"A Drexl","year":"1995","unstructured":"Drexl A, Haase K (1995) Proportional lotsizing and scheduling. Int J Prod Econ 40(1):73\u201387","journal-title":"Int J Prod Econ"},{"issue":"6","key":"536_CR11","doi-asserted-by":"publisher","first-page":"832","DOI":"10.1287\/opre.35.6.832","volume":"35","author":"GD Eppen","year":"1987","unstructured":"Eppen GD, Martin RK (1987) Solving multi-item capacitated lot-sizing problems using variable redefinition. Oper Res 35(6):832\u2013848","journal-title":"Oper Res"},{"issue":"2","key":"536_CR12","doi-asserted-by":"publisher","first-page":"697","DOI":"10.1016\/j.ejor.2008.03.035","volume":"196","author":"D Ferreira","year":"2009","unstructured":"Ferreira D, Morabito Neto R, Rangel S (2009) Solution approaches for the soft drink integrated production lot sizing and scheduling problem. Eur J Oper Res 196(2):697\u2013706","journal-title":"Eur J Oper Res"},{"issue":"4","key":"536_CR13","doi-asserted-by":"publisher","first-page":"684","DOI":"10.1016\/j.cor.2009.06.007","volume":"37","author":"D Ferreira","year":"2010","unstructured":"Ferreira D, Morabito Neto R, Rangel S (2010) Relax and fix heuristics to solve one-stage one-machine lot-scheduling models for small-scale soft drink plants. Comput Oper Res 37(4):684\u2013691","journal-title":"Comput Oper Res"},{"issue":"2","key":"536_CR14","doi-asserted-by":"publisher","first-page":"255","DOI":"10.1016\/j.ijpe.2011.11.028","volume":"136","author":"D Ferreira","year":"2012","unstructured":"Ferreira D, Clark AR, Almada-Lobo B, Morabito Neto R (2012) Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production. Int J Prod Econ 136(2):255\u2013265","journal-title":"Int J Prod Econ"},{"issue":"7","key":"536_CR15","doi-asserted-by":"publisher","first-page":"1804","DOI":"10.1016\/j.cor.2013.01.015","volume":"40","author":"G Figueira","year":"2013","unstructured":"Figueira G, Santos MO, Almada-Lobo B (2013) A hybrid VNS approach for the short-term production planning and scheduling: a case study in the pulp and paper industry. Comput Oper Res 40(7):1804\u20131818","journal-title":"Comput Oper Res"},{"issue":"3","key":"536_CR16","doi-asserted-by":"publisher","first-page":"337","DOI":"10.1016\/0377-2217(90)90245-7","volume":"44","author":"B Fleischmann","year":"1990","unstructured":"Fleischmann B (1990) The discrete lot-sizing and scheduling problem. Eur J Oper Res 44(3):337\u2013348","journal-title":"Eur J Oper Res"},{"issue":"1","key":"536_CR17","doi-asserted-by":"publisher","first-page":"11","DOI":"10.1007\/BF01539800","volume":"19","author":"B Fleischmann","year":"1997","unstructured":"Fleischmann B, Meyr H (1997) The general lotsizing and scheduling problem. OR Spectr 19(1):11\u201321","journal-title":"OR Spectr"},{"key":"536_CR18","doi-asserted-by":"publisher","first-page":"33","DOI":"10.1016\/j.cor.2014.12.008","volume":"59","author":"MM Furlan","year":"2015","unstructured":"Furlan MM, Almada-Lobo B, Santos MO, Morabito Neto R (2015) Unequal individual genetic algorithm with intelligent diversification for the lot-scheduling problem in integrated mills using multiple-paper machines. Comput Oper Res 59:33\u201350","journal-title":"Comput Oper Res"},{"issue":"3","key":"536_CR19","doi-asserted-by":"publisher","first-page":"475","DOI":"10.1016\/S0360-8352(02)00232-2","volume":"44","author":"J Geunes","year":"2003","unstructured":"Geunes J (2003) Solving large-scale requirements planning problems with component substitution options. Comput Ind Eng 44(3):475\u2013491","journal-title":"Comput Ind Eng"},{"issue":"3","key":"536_CR20","doi-asserted-by":"publisher","first-page":"255","DOI":"10.1016\/S0925-5273(00)00162-6","volume":"78","author":"M G\u00f6the-Lundgren","year":"2002","unstructured":"G\u00f6the-Lundgren M, Lundgren JT, Persson JA (2002) An optimization model for refinery production scheduling. Int J Prod Econ 78(3):255\u2013270","journal-title":"Int J Prod Econ"},{"issue":"1","key":"536_CR21","doi-asserted-by":"publisher","first-page":"51","DOI":"10.1007\/BF01539882","volume":"18","author":"K Haase","year":"1996","unstructured":"Haase K (1996) Capacitated lot-sizing with sequence dependent setup costs. OR Spectr 18(1):51\u201359","journal-title":"OR Spectr"},{"issue":"1","key":"536_CR22","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2009.11.005","volume":"207","author":"S Hartmann","year":"2010","unstructured":"Hartmann S, Briskorn D (2010) A survey of variants and extensions of the resource-constrained project scheduling problem. Eur J Oper Res 207(1):1\u201314","journal-title":"Eur J Oper Res"},{"issue":"1","key":"536_CR23","doi-asserted-by":"publisher","first-page":"47","DOI":"10.1080\/07408170490247296","volume":"36","author":"R Jans","year":"2004","unstructured":"Jans R, Degraeve Z (2004) An industrial extension of the discrete lot-sizing and scheduling problem. IIE Trans 36(1):47\u201358","journal-title":"IIE Trans"},{"issue":"2","key":"536_CR24","doi-asserted-by":"publisher","first-page":"326","DOI":"10.1287\/opre.33.2.326","volume":"33","author":"US Karmarkar","year":"1985","unstructured":"Karmarkar US, Schrage L (1985) The deterministic dynamic product cycling problem. Oper Res 33(2):326\u2013345","journal-title":"Oper Res"},{"issue":"2","key":"536_CR25","doi-asserted-by":"publisher","first-page":"85","DOI":"10.1002\/(SICI)1097-0037(199809)32:2<85::AID-NET2>3.0.CO;2-E","volume":"32","author":"A Kimms","year":"1998","unstructured":"Kimms A, Drexl A (1998) Proportional lot sizing and scheduling: some extensions. Networks 32(2):85\u2013101","journal-title":"Networks"},{"issue":"1","key":"536_CR26","doi-asserted-by":"publisher","first-page":"145","DOI":"10.1007\/s00291-004-0181-7","volume":"27","author":"A Ko\u00e7lar","year":"2005","unstructured":"Ko\u00e7lar A, S\u00fcral H (2005) A note on \u201cThe general lot sizing and scheduling problem\u201d. OR Spectr 27(1):145\u2013146","journal-title":"OR Spectr"},{"issue":"4","key":"536_CR27","doi-asserted-by":"publisher","first-page":"946","DOI":"10.1287\/opre.19.4.946","volume":"19","author":"L Lasdon","year":"1971","unstructured":"Lasdon L, Terjung RC (1971) An efficient algorithm for multi-item scheduling. Oper Res 19(4):946\u2013969","journal-title":"Oper Res"},{"key":"536_CR28","unstructured":"Mac\u00a0Cawley AF (2014) The international wine supply chain: challenges from bottling to the glass. Ph.D. thesis, Georgia Institute of Technology"},{"issue":"4","key":"536_CR29","doi-asserted-by":"publisher","first-page":"631","DOI":"10.1016\/S1665-6423(14)70080-X","volume":"12","author":"M Maldonado","year":"2014","unstructured":"Maldonado M, Rangel S, Ferreira D (2014) A study of different subsequence elimination strategies for the soft drink production planning. J Appl Res Technol 12(4):631\u2013641","journal-title":"J Appl Res Technol"},{"issue":"2","key":"536_CR30","doi-asserted-by":"publisher","first-page":"277","DOI":"10.1016\/S0377-2217(01)00373-3","volume":"139","author":"H Meyr","year":"2002","unstructured":"Meyr H (2002) Simultaneous lotsizing and scheduling on parallel machines. Eur J Oper Res 139(2):277\u2013292","journal-title":"Eur J Oper Res"},{"issue":"6","key":"536_CR31","first-page":"585","volume":"74","author":"H Meyr","year":"2004","unstructured":"Meyr H (2004) Simultane Losgr\u00f6\u00dfen- und Reihenfolgeplanung bei mehrstufiger kontinuierlicher Fertigung. Zeitschrift f\u00fcr Betriebswirtschaft 74(6):585\u2013610","journal-title":"Zeitschrift f\u00fcr Betriebswirtschaft"},{"issue":"3","key":"536_CR32","doi-asserted-by":"publisher","first-page":"718","DOI":"10.1016\/j.ejor.2013.03.036","volume":"229","author":"H Meyr","year":"2013","unstructured":"Meyr H, Mann M (2013) A decomposition approach for the general lotsizing and scheduling problem for parallel production lines. Eur J Oper Res 229(3):718\u2013731","journal-title":"Eur J Oper Res"},{"issue":"3","key":"536_CR33","doi-asserted-by":"publisher","first-page":"445","DOI":"10.1080\/00207540310001613656","volume":"42","author":"JA Persson","year":"2004","unstructured":"Persson JA, G\u00f6the-Lundgren M, Lundgren JT, Gendron B (2004) A tabu search heuristic for scheduling the production processes at an oil refinery. Int J Prod Res 42(3):445\u2013471","journal-title":"Int J Prod Res"},{"issue":"1","key":"536_CR34","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.cie.2012.01.008","volume":"63","author":"MO Santos","year":"2012","unstructured":"Santos MO, Almada-Lobo B (2012) Integrated pulp and paper mill planning and scheduling. Comput Ind Eng 63(1):1\u201312","journal-title":"Comput Ind Eng"},{"key":"536_CR35","series-title":"Produktion und Logistik","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-658-02089-7","volume-title":"Multi-stage simultaneous lot-sizing and scheduling\u2014planning of flow lines with shifting bottlenecks","author":"F Seeanner","year":"2013","unstructured":"Seeanner F (2013) Multi-stage simultaneous lot-sizing and scheduling\u2014planning of flow lines with shifting bottlenecks. Produktion und Logistik. Springer Gabler, Wiesbaden"},{"issue":"1","key":"536_CR36","doi-asserted-by":"publisher","first-page":"33","DOI":"10.1007\/s00291-012-0296-1","volume":"35","author":"F Seeanner","year":"2013","unstructured":"Seeanner F, Meyr H (2013) Multi-stage simultaneous lot-sizing and scheduling for flow line production. OR Spectr 35(1):33\u201373","journal-title":"OR Spectr"},{"issue":"1","key":"536_CR37","doi-asserted-by":"publisher","first-page":"303","DOI":"10.1016\/j.cor.2012.07.002","volume":"40","author":"F Seeanner","year":"2013","unstructured":"Seeanner F, Almada-Lobo B, Meyr H (2013) Combining the principles of variable neighborhood decomposition search and the fix & optimize heuristic to solve multi-level lot-sizing and scheduling problems. Comput Oper Res 40(1):303\u2013317","journal-title":"Comput Oper Res"},{"key":"536_CR38","series-title":"Lecture notes in economics and mathematical systems","volume-title":"Time continuity in discrete time models: new approaches for production planning in process industries","author":"C Suerie","year":"2005","unstructured":"Suerie C (2005) Time continuity in discrete time models: new approaches for production planning in process industries. Lecture notes in economics and mathematical systems. Springer, Berlin"},{"issue":"1","key":"536_CR39","doi-asserted-by":"publisher","first-page":"401","DOI":"10.1016\/j.ijpe.2007.10.001","volume":"113","author":"H Tempelmeier","year":"2008","unstructured":"Tempelmeier H, Buschk\u00fchl L (2008) Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource. Int J Prod Econ 113(1):401\u2013412","journal-title":"Int J Prod Econ"},{"issue":"4","key":"536_CR40","doi-asserted-by":"publisher","first-page":"819","DOI":"10.1007\/s00291-015-0410-2","volume":"38","author":"H Tempelmeier","year":"2016","unstructured":"Tempelmeier H, Copil K (2016) Capacitated lot sizing with parallel machines, sequence-dependent setups and a common setup operator. OR Spectr 38(4):819\u2013847","journal-title":"OR Spectr"},{"issue":"3","key":"536_CR41","doi-asserted-by":"publisher","first-page":"1352","DOI":"10.1016\/j.asoc.2012.03.074","volume":"13","author":"CFM Toledo","year":"2013","unstructured":"Toledo CFM, Arantes MdS, de Oliveira RRR, Almada-Lobo B (2013) Glass container production scheduling through hybrid multi-population based evolutionary algorithm. Appl Soft Comput 13(3):1352\u20131364","journal-title":"Appl Soft Comput"}],"container-title":["OR Spectrum"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-018-0536-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s00291-018-0536-0\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s00291-018-0536-0.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,12,23]],"date-time":"2019-12-23T09:30:06Z","timestamp":1577093406000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s00291-018-0536-0"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,11,9]]},"references-count":41,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2019,3]]}},"alternative-id":["536"],"URL":"https:\/\/doi.org\/10.1007\/s00291-018-0536-0","relation":{},"ISSN":["0171-6468","1436-6304"],"issn-type":[{"value":"0171-6468","type":"print"},{"value":"1436-6304","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,11,9]]},"assertion":[{"value":"31 March 2017","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"17 October 2018","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"9 November 2018","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}