{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,29]],"date-time":"2026-03-29T10:11:57Z","timestamp":1774779117721,"version":"3.50.1"},"reference-count":22,"publisher":"Springer Science and Business Media LLC","issue":"3","license":[{"start":{"date-parts":[[2009,1,29]],"date-time":"2009-01-29T00:00:00Z","timestamp":1233187200000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Comput Optim Appl"],"published-print":{"date-parts":[[2010,11]]},"DOI":"10.1007\/s10589-009-9235-8","type":"journal-article","created":{"date-parts":[[2009,1,28]],"date-time":"2009-01-28T17:43:33Z","timestamp":1233164613000},"page":"529-552","source":"Crossref","is-referenced-by-count":36,"title":["Multiple machine continuous setup lotsizing with\u00a0sequence-dependent setups"],"prefix":"10.1007","volume":"47","author":[{"given":"Bernardo","family":"Almada-Lobo","sequence":"first","affiliation":[]},{"given":"Diego","family":"Klabjan","sequence":"additional","affiliation":[]},{"given":"Maria Ant\u00f3nia","family":"Carravilla","sequence":"additional","affiliation":[]},{"given":"Jos\u00e9 F.","family":"Oliveira","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2009,1,29]]},"reference":[{"key":"9235_CR1","volume-title":"Network Flows: Theory, Algorithms, and Applications","author":"R.K. Ahuja","year":"1993","unstructured":"Ahuja, R.K., Magnanti, T.L., Orlin, J.B.: Network Flows: Theory, Algorithms, and Applications. Prentice-Hall, Englewood Cliffs (1993)"},{"key":"9235_CR2","doi-asserted-by":"crossref","first-page":"363","DOI":"10.1016\/j.ijpe.2007.02.052","volume":"114","author":"B. Almada-Lobo","year":"2008","unstructured":"Almada-Lobo, B., Oliveira, J.F., Carravilla, M.A.: Production planning and scheduling in the glass container industry: A VNS approach. Int. J. Prod. Econ. 114, 363\u2013375 (2008)","journal-title":"Int. J. Prod. Econ."},{"key":"9235_CR3","doi-asserted-by":"crossref","first-page":"4873","DOI":"10.1080\/00207540601094465","volume":"45","author":"B. Almada-Lobo","year":"2007","unstructured":"Almada-Lobo, B., Klabjan, D., Carravilla, M.A., Oliveira, J.F.: Single machine multi-product capacitated lotsizing with sequence-dependent setups. Int. J. Prod. Res. 45, 4873\u20134894 (2007)","journal-title":"Int. J. Prod. Res."},{"key":"9235_CR4","volume-title":"Network Optimization: Continuous and Discrete Models","author":"D.P. Bertsekas","year":"1998","unstructured":"Bertsekas, D.P.: Network Optimization: Continuous and Discrete Models. Athena Scientific, Belmont (1998)"},{"key":"9235_CR5","doi-asserted-by":"crossref","first-page":"75","DOI":"10.1023\/A:1018963805173","volume":"96","author":"M. Constantino","year":"2000","unstructured":"Constantino, M.: A polyhedral approach to a production planning problem. Ann. Oper. Res. 96, 75\u201395 (2000)","journal-title":"Ann. Oper. Res."},{"key":"9235_CR6","doi-asserted-by":"crossref","first-page":"492","DOI":"10.1287\/opre.42.3.492","volume":"42","author":"R. Dematta","year":"1994","unstructured":"Dematta, R., Guignard, M.: Dynamic production scheduling for a process industry. Oper. Res. 42, 492\u2013503 (1994)","journal-title":"Oper. Res."},{"key":"9235_CR7","doi-asserted-by":"crossref","first-page":"62","DOI":"10.1016\/0377-2217(94)90330-1","volume":"72","author":"R. Dematta","year":"1994","unstructured":"Dematta, R., Guignard, M.: Studying the effects of production loss due to setup in dynamic production scheduling. Eur. J. Oper. Res. 72, 62\u201373 (1994)","journal-title":"Eur. J. Oper. Res."},{"key":"9235_CR8","doi-asserted-by":"crossref","first-page":"564","DOI":"10.1080\/07408179508936772","volume":"27","author":"R. Dematta","year":"1995","unstructured":"Dematta, R., Guignard, M.: The performance of rolling production schedules in a process industry. IIE Trans. 27, 564\u2013573 (1995)","journal-title":"IIE Trans."},{"key":"9235_CR9","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1016\/S0377-2217(97)00030-1","volume":"99","author":"A. Drexl","year":"1997","unstructured":"Drexl, A., Kimms, A.: Lot sizing and scheduling\u2014Survey and extensions. Eur. J. Oper. Res. 99, 221\u2013235 (1997)","journal-title":"Eur. J. Oper. Res."},{"key":"9235_CR10","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1016\/0377-2217(94)90083-3","volume":"75","author":"B. Fleischmann","year":"1994","unstructured":"Fleischmann, B.: The discrete lot-sizing and scheduling problem with sequence-dependent setup costs. Eur. J. Oper. Res. 75, 395\u2013404 (1994)","journal-title":"Eur. J. Oper. Res."},{"key":"9235_CR11","doi-asserted-by":"crossref","first-page":"82","DOI":"10.1007\/BFb0120690","volume":"2","author":"A.M. Geoffrion","year":"1974","unstructured":"Geoffrion, A.M.: Lagrangian relaxation for integer programming. Math. Program. Study 2, 82\u2013114 (1974)","journal-title":"Math. Program. Study"},{"key":"9235_CR12","doi-asserted-by":"crossref","first-page":"62","DOI":"10.1007\/BF01580223","volume":"6","author":"M. Held","year":"1974","unstructured":"Held, M., Wolfe, P., Crowder, H.P.: Validation of subgradient optimization. Math. Program. 6, 62\u201388 (1974)","journal-title":"Math. Program."},{"key":"9235_CR13","doi-asserted-by":"crossref","first-page":"701","DOI":"10.1016\/0360-8352(95)00027-X","volume":"28","author":"K.S. Hindi","year":"1995","unstructured":"Hindi, K.S.: Solving the single-item, capacitated dynamic lot-sizing problem with startup and reservation costs by tabu search. Comput. Ind. Eng. 28, 701\u2013707 (1995)","journal-title":"Comput. Ind. Eng."},{"key":"9235_CR14","doi-asserted-by":"crossref","first-page":"47","DOI":"10.1080\/07408170490247296","volume":"36","author":"R. Jans","year":"2004","unstructured":"Jans, R., Degraeve, Z.: An industrial extension of the discrete lot-sizing and scheduling problem. IIE Trans. 36, 47\u201358 (2004)","journal-title":"IIE Trans."},{"key":"9235_CR15","doi-asserted-by":"crossref","first-page":"1855","DOI":"10.1016\/j.ejor.2005.12.008","volume":"177","author":"R. Jans","year":"2007","unstructured":"Jans, R., Degraeve, Z.: Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches. Eur. J. Oper. Res. 177, 1855\u20131875 (2007)","journal-title":"Eur. J. Oper. Res."},{"key":"9235_CR16","doi-asserted-by":"crossref","first-page":"389","DOI":"10.1287\/opre.35.3.389","volume":"35","author":"U.S. Karmarkar","year":"1987","unstructured":"Karmarkar, U.S., Kekre, S., Kekre, S.: The dynamic lot-sizing problem with startup and reservation costs. Oper. Res. 35, 389\u2013398 (1987)","journal-title":"Oper. Res."},{"key":"9235_CR17","doi-asserted-by":"crossref","first-page":"326","DOI":"10.1287\/opre.33.2.326","volume":"33","author":"U.S. Karmarkar","year":"1985","unstructured":"Karmarkar, U.S., Schrage, L.: The deterministic dynamic product cycling problem. Oper. Res. 33, 326\u2013345 (1985)","journal-title":"Oper. Res."},{"key":"9235_CR18","volume-title":"Production Planning by Mixed Integer Programming","author":"Y. Pochet","year":"2006","unstructured":"Pochet, Y., Wolsey, L.A.: Production Planning by Mixed Integer Programming. Springer, New York (2006)"},{"key":"9235_CR19","doi-asserted-by":"crossref","first-page":"494","DOI":"10.1016\/S0377-2217(96)00020-3","volume":"100","author":"M. Salomon","year":"1997","unstructured":"Salomon, M., Solomon, M.M., Van Wassenhove, L.N., Dumas, Y., Dauzere-Peres, S.: Solving the discrete lotsizing and scheduling problem with sequence dependent set-up costs and set-up times using the Travelling Salesman Problem with time windows. Eur. J. Oper. Res. 100, 494\u2013513 (1997)","journal-title":"Eur. J. Oper. Res."},{"key":"9235_CR20","doi-asserted-by":"crossref","first-page":"897","DOI":"10.1016\/0305-0548(95)00050-X","volume":"23","author":"R.A. Sandbothe","year":"1996","unstructured":"Sandbothe, R.A.: A user interactive heuristic procedure for solving the multiple product cycling problem. Comput. Oper. Res. 23, 897\u2013907 (1996)","journal-title":"Comput. Oper. Res."},{"key":"9235_CR21","doi-asserted-by":"crossref","first-page":"1409","DOI":"10.1287\/mnsc.44.10.1409","volume":"44","author":"F. Vanderbeck","year":"1998","unstructured":"Vanderbeck, F.: Lot-sizing with start-up times. Manag. Sci. 44, 1409\u20131425 (1998)","journal-title":"Manag. Sci."},{"key":"9235_CR22","doi-asserted-by":"crossref","first-page":"154","DOI":"10.1016\/S0377-2217(97)89646-4","volume":"99","author":"L.A. Wolsey","year":"1997","unstructured":"Wolsey, L.A.: MIP modelling of changeovers in production planning and scheduling problems. Eur. J. Oper. Res. 99, 154\u2013165 (1997)","journal-title":"Eur. J. Oper. Res."}],"container-title":["Computational Optimization and Applications"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10589-009-9235-8.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10589-009-9235-8\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10589-009-9235-8","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,31]],"date-time":"2019-05-31T11:36:36Z","timestamp":1559302596000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10589-009-9235-8"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2009,1,29]]},"references-count":22,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2010,11]]}},"alternative-id":["9235"],"URL":"https:\/\/doi.org\/10.1007\/s10589-009-9235-8","relation":{},"ISSN":["0926-6003","1573-2894"],"issn-type":[{"value":"0926-6003","type":"print"},{"value":"1573-2894","type":"electronic"}],"subject":[],"published":{"date-parts":[[2009,1,29]]}}}