{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,19]],"date-time":"2026-04-19T13:06:40Z","timestamp":1776604000322,"version":"3.51.2"},"reference-count":29,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2018,7,3]],"date-time":"2018-07-03T00:00:00Z","timestamp":1530576000000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Glob Optim"],"published-print":{"date-parts":[[2019,8]]},"DOI":"10.1007\/s10898-018-0681-7","type":"journal-article","created":{"date-parts":[[2018,7,3]],"date-time":"2018-07-03T05:37:03Z","timestamp":1530596223000},"page":"879-908","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":92,"title":["Joint production and transportation scheduling in flexible manufacturing systems"],"prefix":"10.1007","volume":"74","author":[{"given":"Dalila B. M.\u00a0M.","family":"Fontes","sequence":"first","affiliation":[]},{"given":"Seyed Mahdi","family":"Homayouni","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2018,7,3]]},"reference":[{"issue":"2","key":"681_CR1","doi-asserted-by":"publisher","first-page":"267","DOI":"10.1080\/0020754032000123579","volume":"42","author":"TF Abdelmaguid","year":"2004","unstructured":"Abdelmaguid, T.F., Nassef, A.O., Kamal, B.A., Hassan, M.F.: A hybrid ga\/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles. Int. J. Prod. Res. 42(2), 267\u2013281 (2004)","journal-title":"Int. J. Prod. Res."},{"key":"681_CR2","doi-asserted-by":"publisher","first-page":"120","DOI":"10.1016\/j.jmsy.2014.11.009","volume":"35","author":"OT Baruwa","year":"2015","unstructured":"Baruwa, O.T., Piera, M.A.: Identifying fms repetitive patterns for efficient search-based scheduling algorithm: a colored petri net approach. J. Manuf. Syst. 35, 120\u2013135 (2015)","journal-title":"J. Manuf. Syst."},{"issue":"16","key":"681_CR3","doi-asserted-by":"publisher","first-page":"4773","DOI":"10.1080\/00207543.2015.1087656","volume":"54","author":"OT Baruwa","year":"2016","unstructured":"Baruwa, O.T., Piera, M.A.: A coloured petri net-based hybrid heuristic search approach to simultaneous scheduling of machines and automated guided vehicles. Int. J. Prod. Res. 54(16), 4773\u20134792 (2016)","journal-title":"Int. J. Prod. Res."},{"issue":"6","key":"681_CR4","doi-asserted-by":"publisher","first-page":"1058","DOI":"10.1287\/opre.43.6.1058","volume":"43","author":"\u00dc Bilge","year":"1995","unstructured":"Bilge, \u00dc., Ulusoy, G.: A time window approach to simultaneous scheduling of machines and material handling system in an fms. Oper. Res. 43(6), 1058\u20131070 (1995)","journal-title":"Oper. Res."},{"issue":"1","key":"681_CR5","doi-asserted-by":"publisher","first-page":"5","DOI":"10.1007\/BF01325094","volume":"4","author":"J Blazewicz","year":"1991","unstructured":"Blazewicz, J., Eiselt, H.A., Finke, G., Laporte, G., Weglarz, J.: Scheduling tasks and vehicles in a flexible manufacturing system. Int. J. Flex. Manuf. Syst. 4(1), 5\u201316 (1991)","journal-title":"Int. J. Flex. Manuf. Syst."},{"issue":"13\u201314","key":"681_CR6","doi-asserted-by":"publisher","first-page":"1924","DOI":"10.1016\/j.dam.2012.04.001","volume":"160","author":"P Brucker","year":"2012","unstructured":"Brucker, P., Burke, E.K., Groenemeyer, S.: A mixed integer programming model for the cyclic job-shop problem with transportation. Discrete Appl. Math. 160(13\u201314), 1924\u20131935 (2012)","journal-title":"Discrete Appl. Math."},{"issue":"8","key":"681_CR7","doi-asserted-by":"publisher","first-page":"2143","DOI":"10.1080\/00207540600818286","volume":"46","author":"L Deroussi","year":"2008","unstructured":"Deroussi, L., Gourgand, M., Tchernev, N.: A simple metaheuristic approach to the simultaneous scheduling of machines and automated guided vehicles. Int. J. Prod. Res. 46(8), 2143\u20132164 (2008)","journal-title":"Int. J. Prod. Res."},{"issue":"3","key":"681_CR8","doi-asserted-by":"publisher","first-page":"1818","DOI":"10.1016\/j.ejor.2005.02.077","volume":"175","author":"G Khayat El","year":"2006","unstructured":"El Khayat, G., Langevin, A., Riopel, D.: Integrated production and material handling scheduling using mathematical programming and constraint programming. Eur. J. Oper. Res. 175(3), 1818\u20131832 (2006)","journal-title":"Eur. J. Oper. Res."},{"issue":"16","key":"681_CR9","doi-asserted-by":"publisher","first-page":"4683","DOI":"10.1080\/00207540903049407","volume":"48","author":"A Gnanavel Babu","year":"2010","unstructured":"Gnanavel Babu, A., Jerald, J., Noorul Haq, A., Muthu Luxmi, V., Vigneswaralu, T.P.: Scheduling of machines and automated guided vehicles in fms using differential evolution. Int. J. Prod. Res. 48(16), 4683\u20134699 (2010)","journal-title":"Int. J. Prod. Res."},{"key":"681_CR10","unstructured":"I\u00a0Gurobi\u00a0Optimization: Gurobi optimizer reference manual [internet] (2017)"},{"issue":"1","key":"681_CR11","doi-asserted-by":"publisher","first-page":"99","DOI":"10.1016\/j.ejor.2003.10.034","volume":"162","author":"J Hurink","year":"2005","unstructured":"Hurink, J., Knust, S.: Tabu search algorithms for job-shop problems with a single transport robot. Eur. J. Oper. Res. 162(1), 99\u2013111 (2005)","journal-title":"Eur. J. Oper. Res."},{"issue":"3","key":"681_CR12","doi-asserted-by":"publisher","first-page":"241","DOI":"10.1007\/BF02289588","volume":"32","author":"SC Johnson","year":"1967","unstructured":"Johnson, S.C.: Hierarchical clustering schemes. Psychometrika 32(3), 241\u2013254 (1967)","journal-title":"Psychometrika"},{"issue":"1","key":"681_CR13","doi-asserted-by":"publisher","first-page":"51","DOI":"10.1016\/j.ejor.2010.10.002","volume":"209","author":"V Kats","year":"2011","unstructured":"Kats, V., Levner, E.: A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times. Eur. J. Oper. Res. 209(1), 51\u201356 (2011)","journal-title":"Eur. J. Oper. Res."},{"issue":"1","key":"681_CR14","doi-asserted-by":"publisher","first-page":"339","DOI":"10.1007\/s00170-010-2820-2","volume":"53","author":"MVS Kumar","year":"2011","unstructured":"Kumar, M.V.S., Janardhana, R., Rao, C.S.P.: Simultaneous scheduling of machines and vehicles in an fms environment with alternative routing. Int. J. Adv. Manuf. Technol. 53(1), 339\u2013351 (2011)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"1","key":"681_CR15","doi-asserted-by":"publisher","first-page":"24","DOI":"10.1016\/j.ijpe.2010.07.012","volume":"143","author":"P Lacomme","year":"2013","unstructured":"Lacomme, P., Larabi, M., Tchernev, N.: Job-shop based framework for simultaneous scheduling of machines and automated guided vehicles. Int. J. Prod. Econ. 143(1), 24\u201334 (2013)","journal-title":"Int. J. Prod. Econ."},{"issue":"1","key":"681_CR16","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ejor.2005.01.036","volume":"171","author":"T Le-Anh","year":"2006","unstructured":"Le-Anh, T., De Koster, M.B.M.: A review of design and control of automated guided vehicle systems. Eur. J. Oper. Res. 171(1), 1\u201323 (2006)","journal-title":"Eur. J. Oper. Res."},{"key":"681_CR17","doi-asserted-by":"publisher","first-page":"121","DOI":"10.1016\/S0167-5060(08)70821-5","volume":"4","author":"JK Lenstra","year":"1979","unstructured":"Lenstra, J.K., Kan, A.H.G.R.: Computational complexity of discrete optimization problems. Ann. Discrete Math. 4, 121\u2013140 (1979)","journal-title":"Ann. Discrete Math."},{"issue":"2","key":"681_CR18","doi-asserted-by":"publisher","first-page":"221","DOI":"10.1002\/net.3230110211","volume":"11","author":"JK Lenstra","year":"1981","unstructured":"Lenstra, J.K., Kan, A.H.G.: Complexity of vehicle routing and scheduling problems. Networks 11(2), 221\u2013227 (1981)","journal-title":"Networks"},{"issue":"5","key":"681_CR19","doi-asserted-by":"publisher","first-page":"704","DOI":"10.1080\/0305215X.2013.795560","volume":"46","author":"X Li","year":"2014","unstructured":"Li, X., Fung, R.Y.K.: A mixed integer linear programming solution for single hoist multi-degree cyclic scheduling with reentrance. Eng. Optim. 46(5), 704\u2013723 (2014)","journal-title":"Eng. Optim."},{"key":"681_CR20","volume-title":"Principles of Artificial Intelligence","author":"NJ Nilsson","year":"1980","unstructured":"Nilsson, N.J.: Principles of Artificial Intelligence. Morgan Kaufmann, Burlington (1980)"},{"issue":"3","key":"681_CR21","doi-asserted-by":"publisher","first-page":"808","DOI":"10.1007\/s10489-016-0786-y","volume":"45","author":"HE Nouri","year":"2016","unstructured":"Nouri, H.E., Driss, O.B., Gh\u00e9dira, K.: Hybrid metaheuristics for scheduling of machines and transport robots in job shop environment. Appl. Intell. 45(3), 808\u2013828 (2016)","journal-title":"Appl. Intell."},{"key":"681_CR22","doi-asserted-by":"publisher","first-page":"488","DOI":"10.1016\/j.cie.2016.02.024","volume":"102","author":"HE Nouri","year":"2016","unstructured":"Nouri, H.E., Driss, O.B., Gh\u00e9dira, K.: Simultaneous scheduling of machines and transport robots in flexible job shop environment using hybrid metaheuristics based on clustered holonic multiagent model. Comput. Ind. Eng. 102, 488\u2013501 (2016)","journal-title":"Comput. Ind. Eng."},{"issue":"5","key":"681_CR23","doi-asserted-by":"publisher","first-page":"602","DOI":"10.1007\/s00170-005-0223-6","volume":"31","author":"BSP Reddy","year":"2006","unstructured":"Reddy, B.S.P., Rao, C.S.P.: A hybrid multi-objective ga for simultaneous scheduling of machines and agvs in fms. Int. J. Adv. Manuf. Technol. 31(5), 602\u2013613 (2006)","journal-title":"Int. J. Adv. Manuf. Technol."},{"issue":"4","key":"681_CR24","doi-asserted-by":"publisher","first-page":"335","DOI":"10.1016\/S0305-0548(96)00061-5","volume":"24","author":"G Ulusoy","year":"1997","unstructured":"Ulusoy, G., Sivrikaya-Serifoglu, F., Bilge, U.: A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles. Comput. Oper. Res. 24(4), 335\u2013351 (1997)","journal-title":"Comput. Oper. Res."},{"issue":"3","key":"681_CR25","doi-asserted-by":"publisher","first-page":"677","DOI":"10.1016\/j.ejor.2004.09.020","volume":"170","author":"IFA Vis","year":"2006","unstructured":"Vis, I.F.A.: Survey of research in the design and control of automated guided vehicle systems. Eur. J. Oper. Res. 170(3), 677\u2013709 (2006)","journal-title":"Eur. J. Oper. Res."},{"issue":"21","key":"681_CR26","doi-asserted-by":"publisher","first-page":"6461","DOI":"10.1080\/00207540903225205","volume":"48","author":"P Yan","year":"2010","unstructured":"Yan, P., Chu, C., Yang, N., Che, A.: A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows. Int. J. Prod. Res. 48(21), 6461\u20136480 (2010)","journal-title":"Int. J. Prod. Res."},{"issue":"7","key":"681_CR27","doi-asserted-by":"publisher","first-page":"1713","DOI":"10.1016\/j.cor.2011.10.007","volume":"39","author":"Q Zhang","year":"2012","unstructured":"Zhang, Q., Manier, H., Manier, M.-A.: A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times. Comput. Oper. Res. 39(7), 1713\u20131723 (2012)","journal-title":"Comput. Oper. Res."},{"issue":"19","key":"681_CR28","doi-asserted-by":"publisher","first-page":"5748","DOI":"10.1080\/00207543.2014.910628","volume":"52","author":"Y Zheng","year":"2014","unstructured":"Zheng, Y., Xiao, Y., Seo, Y.: A tabu search algorithm for simultaneous machine\/agv scheduling problem. Int. J. Prod. Res. 52(19), 5748\u20135763 (2014)","journal-title":"Int. J. Prod. Res."},{"issue":"4\u20135","key":"681_CR29","doi-asserted-by":"publisher","first-page":"385","DOI":"10.1016\/j.artint.2005.12.002","volume":"170","author":"R Zhou","year":"2006","unstructured":"Zhou, R., Hansen, E.A.: Breadth-first heuristic search. Artif. Intell. 170(4\u20135), 385\u2013408 (2006)","journal-title":"Artif. Intell."}],"container-title":["Journal of Global Optimization"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10898-018-0681-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s10898-018-0681-7\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s10898-018-0681-7.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,8,12]],"date-time":"2019-08-12T03:21:12Z","timestamp":1565580072000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s10898-018-0681-7"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,7,3]]},"references-count":29,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2019,8]]}},"alternative-id":["681"],"URL":"https:\/\/doi.org\/10.1007\/s10898-018-0681-7","relation":{},"ISSN":["0925-5001","1573-2916"],"issn-type":[{"value":"0925-5001","type":"print"},{"value":"1573-2916","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,7,3]]},"assertion":[{"value":"20 July 2017","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"23 June 2018","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"3 July 2018","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}