{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T14:45:18Z","timestamp":1740149118677,"version":"3.37.3"},"reference-count":26,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2017,5,30]],"date-time":"2017-05-30T00:00:00Z","timestamp":1496102400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Oper Res Int J"],"published-print":{"date-parts":[[2020,3]]},"DOI":"10.1007\/s12351-017-0326-5","type":"journal-article","created":{"date-parts":[[2017,5,30]],"date-time":"2017-05-30T03:28:19Z","timestamp":1496114899000},"page":"319-348","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":2,"title":["A stochastic model and algorithms for determining efficient time\u2013cost tradeoffs for a project activity"],"prefix":"10.1007","volume":"20","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-2247-7101","authenticated-orcid":false,"given":"Pedro","family":"Godinho","sequence":"first","affiliation":[]},{"given":"Jo\u00e3o Paulo","family":"Costa","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,5,30]]},"reference":[{"issue":"3","key":"326_CR1","doi-asserted-by":"publisher","first-page":"1186","DOI":"10.1016\/j.ejor.2006.05.014","volume":"180","author":"A Azaron","year":"2007","unstructured":"Azaron A, Tavakkoli-Moghaddam R (2007) Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach. Eur J Oper Res 180(3):1186\u20131200","journal-title":"Eur J Oper Res"},{"issue":"1","key":"326_CR2","doi-asserted-by":"publisher","first-page":"47","DOI":"10.1007\/s10479-006-0149-x","volume":"150","author":"A Azaron","year":"2007","unstructured":"Azaron A, Katagiri H, Sakawa M (2007) Time-cost trade-off via optimal control theory in Markov PERT networks. Ann Oper Res 150(1):47\u201364","journal-title":"Ann Oper Res"},{"issue":"2","key":"326_CR3","doi-asserted-by":"publisher","first-page":"175","DOI":"10.1002\/net.20153","volume":"49","author":"I Cohen","year":"2007","unstructured":"Cohen I, Golany B, Shtub A (2007) The stochastic time-cost tradeoff problem: a robust optimization approach. Networks 49(2):175\u2013188","journal-title":"Networks"},{"issue":"1","key":"326_CR4","doi-asserted-by":"publisher","first-page":"22","DOI":"10.3846\/13928619.2011.553988","volume":"17","author":"X Diao","year":"2011","unstructured":"Diao X, Li H, Zeng S, Tam V, Guo H (2011) A pareto multi-objective optimization approach for solving time-cost-quality tradeoff problems. Technol Econ Dev Econ 17(1):22\u201341","journal-title":"Technol Econ Dev Econ"},{"key":"326_CR5","first-page":"56","volume":"54","author":"G Friedl","year":"2002","unstructured":"Friedl G (2002) Sequential investment and time to build. Schmalenbach Bus Rev 54:56\u201379","journal-title":"Schmalenbach Bus Rev"},{"issue":"3","key":"326_CR6","doi-asserted-by":"publisher","first-page":"553","DOI":"10.1016\/j.ejor.2011.08.010","volume":"216","author":"P Godinho","year":"2012","unstructured":"Godinho P, Branco FG (2012) Adaptive policies for multi-mode project scheduling under uncertainty. Eur J Oper Res 216(3):553\u2013562","journal-title":"Eur J Oper Res"},{"issue":"2","key":"326_CR7","doi-asserted-by":"publisher","first-page":"311","DOI":"10.1007\/s00291-006-0037-4","volume":"29","author":"P Godinho","year":"2007","unstructured":"Godinho P, Costa JP (2007) A stochastic multimode model for time-cost tradeoffs under management flexibility. OR Spectr 29(2):311\u2013334","journal-title":"OR Spectr"},{"issue":"2","key":"326_CR8","doi-asserted-by":"publisher","first-page":"149","DOI":"10.1016\/S0925-5273(98)00044-9","volume":"55","author":"D Golenko-Ginzburg","year":"1998","unstructured":"Golenko-Ginzburg D, Gonik A (1998) A heuristic for network project scheduling with random activity durations depending on the resource allocation. Int J Prod Econ 55(2):149\u2013162","journal-title":"Int J Prod Econ"},{"issue":"2","key":"326_CR9","doi-asserted-by":"publisher","first-page":"421","DOI":"10.1016\/j.ejor.2015.05.004","volume":"246","author":"WJ Gutjahr","year":"2015","unstructured":"Gutjahr WJ (2015) Bi-objective multi-mode project scheduling under risk aversion. Eur J Oper Res 246(2):421\u2013434","journal-title":"Eur J Oper Res"},{"issue":"2","key":"326_CR10","doi-asserted-by":"publisher","first-page":"125","DOI":"10.1287\/ijoc.12.2.125.11894","volume":"12","author":"WJ Gutjahr","year":"2000","unstructured":"Gutjahr WJ, Strauss C, Wagner E (2000) A stochastic branch-and-bound approach to activity crashing in project management. INFORMS J Comput 12(2):125\u2013135","journal-title":"INFORMS J Comput"},{"key":"326_CR11","doi-asserted-by":"crossref","unstructured":"Hannan AM, Hajiagha SHR, Pourjam R (2011) A grey mathematical programming model to time-cost trade-offs in project management under uncertainty. In: Proceedings of 2011 IEEE international conference on grey systems and intelligent services, pp 698\u2013704","DOI":"10.1109\/GSIS.2011.6044123"},{"issue":"3","key":"326_CR12","doi-asserted-by":"publisher","first-page":"335","DOI":"10.1007\/PL00013354","volume":"23","author":"R Heilmann","year":"2001","unstructured":"Heilmann R (2001) Resource-constrained project scheduling: a heuristic for the multi\u2013mode case. OR Spectr 23(3):335\u2013357","journal-title":"OR Spectr"},{"issue":"2","key":"326_CR13","doi-asserted-by":"publisher","first-page":"239","DOI":"10.1016\/S0377-2217(99)00484-1","volume":"127","author":"T J\u00f8rgensen","year":"2000","unstructured":"J\u00f8rgensen T, Wallace SW (2000) Improving project cost estimation by taking into account managerial flexibility. Eur J Oper Res 127(2):239\u2013251","journal-title":"Eur J Oper Res"},{"key":"326_CR14","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.cor.2015.04.021","volume":"63","author":"C Kang","year":"2015","unstructured":"Kang C, Choi BC (2015) An adaptive crashing policy for stochastic time-cost tradeoff problems. Comput Oper Res 63:1\u20136","journal-title":"Comput Oper Res"},{"issue":"2","key":"326_CR15","doi-asserted-by":"publisher","first-page":"219","DOI":"10.1007\/s10700-010-9076-z","volume":"9","author":"H Ke","year":"2010","unstructured":"Ke H, Ma W, Gao X, Xu W (2010) New fuzzy models for time-cost trade-off problem. Fuzzy Optim Decis Mak 9(2):219\u2013231","journal-title":"Fuzzy Optim Decis Mak"},{"issue":"1","key":"326_CR16","doi-asserted-by":"publisher","first-page":"202","DOI":"10.1016\/j.ijpe.2006.08.027","volume":"112","author":"M Kili\u00e7","year":"2008","unstructured":"Kili\u00e7 M, Ulusoy G, \u015eerifo\u011flu FS (2008) A bi-objective genetic algorithm approach to risk mitigation in project scheduling. Int J Prod Econ 112(1):202\u2013216","journal-title":"Int J Prod Econ"},{"issue":"12","key":"326_CR17","doi-asserted-by":"publisher","first-page":"2131","DOI":"10.1016\/j.cor.2010.03.002","volume":"37","author":"E Klerides","year":"2010","unstructured":"Klerides E, Hadjiconstantinou E (2010) A decomposition-based stochastic programming approach for the project scheduling problem under time\/cost trade-off settings and uncertain durations. Comput Oper Res 37(12):2131\u20132140","journal-title":"Comput Oper Res"},{"key":"326_CR18","doi-asserted-by":"publisher","first-page":"365","DOI":"10.1016\/S0360-8352(02)00214-0","volume":"44","author":"Z Laslo","year":"2003","unstructured":"Laslo Z (2003) Activity time-cost tradeoffs under time and cost chance constraints. Comput Ind Eng 44:365\u2013384","journal-title":"Comput Ind Eng"},{"key":"326_CR19","doi-asserted-by":"publisher","first-page":"7","DOI":"10.1016\/0304-405X(87)90059-6","volume":"18","author":"S Majd","year":"1987","unstructured":"Majd S, Pindyck R (1987) Time to build, option value and investment decisions. J Financ Econ 18:7\u201327","journal-title":"J Financ Econ"},{"issue":"5\u20138","key":"326_CR20","doi-asserted-by":"publisher","first-page":"811","DOI":"10.1007\/s00170-010-2543-4","volume":"50","author":"H Mokhtari","year":"2010","unstructured":"Mokhtari H, Aghaie A, Rahimi J, Mozdgir A (2010) Project time-cost trade-off scheduling: a hybrid optimization approach. Int J Adv Manuf Technol 50(5\u20138):811\u2013822","journal-title":"Int J Adv Manuf Technol"},{"issue":"1","key":"326_CR21","doi-asserted-by":"publisher","first-page":"36","DOI":"10.1109\/TEM.2010.2058859","volume":"58","author":"H Mokhtari","year":"2011","unstructured":"Mokhtari H, Kazemzadeh RB, Salmasnia A (2011) Time-cost tradeoff analysis in project management: an ant system approach. IEEE Trans Eng Manag 58(1):36\u201343","journal-title":"IEEE Trans Eng Manag"},{"key":"326_CR22","doi-asserted-by":"publisher","first-page":"53","DOI":"10.1016\/0304-405X(93)90040-I","volume":"3","author":"R Pindyck","year":"1993","unstructured":"Pindyck R (1993) Investments of uncertain cost. J Financ Econ 3:53\u201376","journal-title":"J Financ Econ"},{"key":"326_CR23","volume-title":"Practice standard for earned value management","author":"Project Management Institute","year":"2005","unstructured":"Project Management Institute (2005) Practice standard for earned value management. PMI, Newtown Square"},{"issue":"5\u20138","key":"326_CR24","doi-asserted-by":"publisher","first-page":"631","DOI":"10.1007\/s00170-011-3627-5","volume":"60","author":"A Salmasnia","year":"2012","unstructured":"Salmasnia A, Mokhtari H, Abadi INK (2012) A robust scheduling of projects with time, cost, and quality considerations. Int J Adv Manuf Technol 60(5\u20138):631\u2013642","journal-title":"Int J Adv Manuf Technol"},{"issue":"1","key":"326_CR25","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/j.ijpe.2003.09.005","volume":"92","author":"A Tereso","year":"2004","unstructured":"Tereso A, Ara\u00fajo M, Elmaghraby S (2004) Adaptive resource allocation in multimodal activity networks. Int J Prod Econ 92(1):1\u201310","journal-title":"Int J Prod Econ"},{"key":"326_CR26","doi-asserted-by":"publisher","first-page":"837","DOI":"10.1007\/s00170-005-2621-1","volume":"29","author":"L Zhongtu","year":"2006","unstructured":"Zhongtu L, Qifu W, Liping C (2006) A knowledge-based approach for the task implementation in mechanical product design. Int J Adv Manuf Technol 29:837\u2013845","journal-title":"Int J Adv Manuf Technol"}],"container-title":["Operational Research"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-017-0326-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s12351-017-0326-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s12351-017-0326-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2020,2,12]],"date-time":"2020-02-12T15:02:57Z","timestamp":1581519777000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s12351-017-0326-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,5,30]]},"references-count":26,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2020,3]]}},"alternative-id":["326"],"URL":"https:\/\/doi.org\/10.1007\/s12351-017-0326-5","relation":{},"ISSN":["1109-2858","1866-1505"],"issn-type":[{"type":"print","value":"1109-2858"},{"type":"electronic","value":"1866-1505"}],"subject":[],"published":{"date-parts":[[2017,5,30]]},"assertion":[{"value":"10 December 2015","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"14 March 2017","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"22 May 2017","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"30 May 2017","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}}]}}