{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,3,30]],"date-time":"2022-03-30T08:41:43Z","timestamp":1648629703864},"reference-count":17,"publisher":"Springer Science and Business Media LLC","issue":"4","license":[{"start":{"date-parts":[[2012,1,3]],"date-time":"2012-01-03T00:00:00Z","timestamp":1325548800000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Int. J. Mach. Learn. &amp; Cyber."],"published-print":{"date-parts":[[2012,12]]},"DOI":"10.1007\/s13042-011-0067-3","type":"journal-article","created":{"date-parts":[[2012,1,2]],"date-time":"2012-01-02T05:01:19Z","timestamp":1325480479000},"page":"327-333","source":"Crossref","is-referenced-by-count":4,"title":["Hybrid heuristics for the single machine scheduling problem with quadratic earliness and tardiness costs"],"prefix":"10.1007","volume":"3","author":[{"given":"Alok","family":"Singh","sequence":"first","affiliation":[]},{"given":"Jorge M. S.","family":"Valente","sequence":"additional","affiliation":[]},{"given":"Maria R. A.","family":"Moreira","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2012,1,3]]},"reference":[{"key":"67_CR1","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1057\/jors.1988.26","volume":"39","author":"TS Abdul-Razaq","year":"1988","unstructured":"Abdul-Razaq TS, Potts CN (1988) Dynamic programming state-space relaxation for single-machine scheduling. J Oper Res Soc 39:141\u2013142","journal-title":"J Oper Res Soc"},{"key":"67_CR2","doi-asserted-by":"crossref","first-page":"739","DOI":"10.1002\/1520-6750(198710)34:5<739::AID-NAV3220340513>3.0.CO;2-3","volume":"34","author":"U Bagchi","year":"1987","unstructured":"Bagchi U, Chang Y, Sullivan R (1987) Minimizing absolute and squared deviations of completion times with different earliness and tardiness penalties and a common due date. Nav Res Logist 34:739\u2013751","journal-title":"Nav Res Logist"},{"key":"67_CR3","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1287\/opre.38.1.22","volume":"38","author":"KR Baker","year":"1990","unstructured":"Baker KR, Scudder GD (1990) Sequencing with earliness and tardiness penalties: a review. Oper Res 38:22\u201336","journal-title":"Oper Res"},{"key":"67_CR4","doi-asserted-by":"crossref","first-page":"154","DOI":"10.1287\/ijoc.6.2.154","volume":"6","author":"JC Bean","year":"1994","unstructured":"Bean JC (1994) Genetic algorithms and random keys for sequencing and optimization. ORSA J Comput 6:154\u2013160","journal-title":"ORSA J Comput"},{"key":"67_CR5","first-page":"394","volume":"94","author":"JE Beasley","year":"1996","unstructured":"Beasley JE, Chu PC (1996) A genetic algorithm for the set covering problem. Eur J Oper Res 94:394\u2013404","journal-title":"Eur J Oper Res"},{"key":"67_CR6","doi-asserted-by":"crossref","first-page":"433","DOI":"10.1057\/jors.1984.84","volume":"35","author":"TCE Cheng","year":"1984","unstructured":"Cheng TCE (1984) Optimal due date determination and sequencing of n jobs on a single machine. J Oper Res Soc 35:433\u2013437","journal-title":"J Oper Res Soc"},{"key":"67_CR7","volume-title":"Handbook of genetic algorithms","author":"L Davis","year":"1991","unstructured":"Davis L (1991) Handbook of genetic algorithms. Van Nostrand Reinhold, New York"},{"key":"67_CR8","doi-asserted-by":"crossref","first-page":"181","DOI":"10.1016\/0167-188X(83)90012-5","volume":"7","author":"SK Gupta","year":"1983","unstructured":"Gupta SK, Sen T (1983) Minimizing a quadratic function of job lateness on a single machine. Eng Costs Prod Econ 7:181\u2013194","journal-title":"Eng Costs Prod Econ"},{"key":"67_CR9","unstructured":"Korman K (1994) A pressing matter. Video, pp 46\u201350"},{"key":"67_CR10","unstructured":"Landis K (1993) Group technology and cellular manufacturing in the Westvaco Los Angeles VH Department. Project Report in IOM 581, School of Business, University of Southern California"},{"key":"67_CR11","doi-asserted-by":"crossref","first-page":"546","DOI":"10.1016\/S0377-2217(96)00062-8","volume":"96","author":"G Li","year":"1997","unstructured":"Li G (1997) Single machine earliness and tardiness scheduling. Eur J Oper Res 96:546\u2013558","journal-title":"Eur J Oper Res"},{"key":"67_CR12","doi-asserted-by":"crossref","first-page":"679","DOI":"10.1016\/S0305-0548(98)00081-1","volume":"26","author":"CF Liaw","year":"1999","unstructured":"Liaw CF (1999) A branch-and-bound algorithm for the single machine earliness and tardiness scheduling problem. Comput Oper Res 26:679\u2013693","journal-title":"Comput Oper Res"},{"key":"67_CR13","unstructured":"Valente JMS (2007) An exact approach for single machine scheduling problem with quadratic earliness and tardiness penalties. Working Paper 238, Faculdade de Economia, Universidade do Porto, Portugal"},{"key":"67_CR14","doi-asserted-by":"crossref","first-page":"3696","DOI":"10.1016\/j.cor.2007.04.006","volume":"35","author":"JMS Valente","year":"2008","unstructured":"Valente JMS, Alves RAFS (2008) Heuristics for the single machine scheduling problem with quadratic earliness and tardiness penalties. Comput Oper Res 35:3696\u20133713","journal-title":"Comput Oper Res"},{"key":"67_CR15","doi-asserted-by":"crossref","first-page":"620","DOI":"10.1057\/jors.2008.191","volume":"61","author":"JMS Valente","year":"2010","unstructured":"Valente JMS (2010) Beam search heuristics for quadratic earliness and tardiness scheduling. J Oper Res Soc 61:620\u2013631","journal-title":"J Oper Res Soc"},{"key":"67_CR16","doi-asserted-by":"crossref","first-page":"251","DOI":"10.1007\/s00170-010-2921-y","volume":"54","author":"JMS Valente","year":"2011","unstructured":"Valente JMS, Moreira MRA, Singh A, Alves RAFS (2011) Genetic algorithms for single machine scheduling with quadratic earliness and tardiness costs. Int J Adv Manuf Technol 54:251\u2013265","journal-title":"Int J Adv Manuf Technol"},{"key":"67_CR17","doi-asserted-by":"crossref","first-page":"317","DOI":"10.1111\/j.1540-5915.2002.tb01647.x","volume":"33","author":"BJ Wagner","year":"2002","unstructured":"Wagner BJ, Davis DJ, Kher H (2002) The production of several items in a single facility with linearly changing demand rates. Decis Sci 33:317\u2013346","journal-title":"Decis Sci"}],"container-title":["International Journal of Machine Learning and Cybernetics"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13042-011-0067-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s13042-011-0067-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s13042-011-0067-3","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,6,2]],"date-time":"2019-06-02T14:31:09Z","timestamp":1559485869000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s13042-011-0067-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2012,1,3]]},"references-count":17,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2012,12]]}},"alternative-id":["67"],"URL":"https:\/\/doi.org\/10.1007\/s13042-011-0067-3","relation":{},"ISSN":["1868-8071","1868-808X"],"issn-type":[{"value":"1868-8071","type":"print"},{"value":"1868-808X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,1,3]]}}}