{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,16]],"date-time":"2025-10-16T10:03:03Z","timestamp":1760608983999,"version":"3.37.3"},"reference-count":35,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2017,2,17]],"date-time":"2017-02-17T00:00:00Z","timestamp":1487289600000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100002322","name":"CAPES","doi-asserted-by":"crossref","award":["248907\/2013-1"],"award-info":[{"award-number":["248907\/2013-1"]}],"id":[{"id":"10.13039\/501100002322","id-type":"DOI","asserted-by":"crossref"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Control Autom Electr Syst"],"published-print":{"date-parts":[[2017,4]]},"DOI":"10.1007\/s40313-016-0296-5","type":"journal-article","created":{"date-parts":[[2017,2,17]],"date-time":"2017-02-17T13:57:55Z","timestamp":1487339875000},"page":"247-258","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":5,"title":["Mitigation in the Very Short-term of Risk from Wind Ramps with Unforeseen Severity"],"prefix":"10.1007","volume":"28","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-3740-7819","authenticated-orcid":false,"given":"Mauro","family":"Pinto","sequence":"first","affiliation":[]},{"given":"Vladimiro","family":"Miranda","sequence":"additional","affiliation":[]},{"given":"Osvaldo","family":"Saavedra","sequence":"additional","affiliation":[]},{"given":"Leonel","family":"Carvalho","sequence":"additional","affiliation":[]},{"given":"Jean","family":"Sumaili","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2017,2,17]]},"reference":[{"key":"296_CR1","doi-asserted-by":"publisher","unstructured":"Barth, R., Brand, H., Meibom, P., & Weber, C. (2006). A stochastic unit-commitment model for the evaluation of the impacts of integration of large amounts of intermittent wind power. In 9th International conference on probabilistic methods applied to power systems, PMAPS. doi: 10.1109\/PMAPS.2006.360195 .","DOI":"10.1109\/PMAPS.2006.360195"},{"key":"296_CR2","doi-asserted-by":"publisher","unstructured":"Bessa, R. J., Mendes, J., Miranda, V., Botterud, a, Wang, J., & Zhou, Z. (2011). Quantile-copula density forecast for wind power uncertainty modeling. In IEEE PES Trondheim PowerTech: The Power of Technology for a Sustainable Society POWERTECH (pp. 1\u20138). doi: 10.1109\/PTC.2011.6019180 .","DOI":"10.1109\/PTC.2011.6019180"},{"key":"296_CR3","doi-asserted-by":"crossref","DOI":"10.1007\/978-81-322-0987-4","volume-title":"Reliability and risk evaluation of wind integrated power systems","author":"R Billinton","year":"2013","unstructured":"Billinton, R., Karki, R., & Verma, A. K. (2013). Reliability and risk evaluation of wind integrated power systems. New York: Springer."},{"key":"296_CR4","unstructured":"Botterud, A., Zhou, Z., & Wang, J. (2011). Wind power forecasting, unit commitment, and electricity market operations. In PES. http:\/\/ieeexplore.ieee.org\/xpls\/abs_all.jsp?arnumber=6039192 ."},{"issue":"1","key":"296_CR5","doi-asserted-by":"publisher","first-page":"250","DOI":"10.1109\/TSTE.2012.2215631","volume":"4","author":"A Botterud","year":"2013","unstructured":"Botterud, A., Zhou, Z., Wang, J., Sumaili, J., Keko, H., Mendes, J., et al. (2013). Demand dispatch and probabilistic wind power forecasting in unit commitment and economic dispatch: A case study of Illinois. IEEE Transactions on Sustainable Energy, 4(1), 250\u2013261. doi: 10.1109\/TSTE.2012.2215631 .","journal-title":"IEEE Transactions on Sustainable Energy"},{"key":"296_CR6","doi-asserted-by":"publisher","unstructured":"Botterud, A., Zhou, Z., Wang, J., Valenzuela, J., Sumaili, J., Bessa, R. J., et al. (2011). Unit commitment and operating reserves with probabilistic wind power forecasts. In IEEE PES Trondheim PowerTech: The Power of Technology for a Sustainable Society POWERTECH (pp. 1\u20137). doi: 10.1109\/PTC.2011.6019263 .","DOI":"10.1109\/PTC.2011.6019263"},{"issue":"2","key":"296_CR7","doi-asserted-by":"crossref","first-page":"306","DOI":"10.1109\/TPWRS.2008.919318","volume":"23","author":"F Bouffard","year":"2008","unstructured":"Bouffard, F., & Galiana, F. D. (2008). Stochastic security for operations planning with significant wind power generation. IEEE Transactions on Power Systems, 23(2), 306\u2013316.","journal-title":"IEEE Transactions on Power Systems"},{"key":"296_CR8","unstructured":"Canadian, I., Of, C., & Engineering, E. (2013). Extension of area risk concepts to incorporate wind power in unit commitment risk evaluation. In S. Thapa, R. Karki, R. Billinton & H. Kile $${\\dagger }$$ \u2020 Norwegian University of Science and Technology-NTNU. Trondheim, 3, (pp. 0\u20133)"},{"key":"296_CR9","unstructured":"Christie, R. (n.d.). Power systems test case archive. https:\/\/www.ee.washington.edu\/research\/pstca\/pf30\/pg_tca30bus.htm . Accessed Aug 7 2015."},{"key":"296_CR10","doi-asserted-by":"crossref","DOI":"10.2172\/1008309","volume-title":"A survey on wind power ramp forecasting","author":"C Ferreira","year":"2011","unstructured":"Ferreira, C., Gama, J., Matias, L., Botterud, A., & Wang, J. (2011). A survey on wind power ramp forecasting. Lemont: Argonne National Laboratory (ANL)."},{"key":"296_CR11","doi-asserted-by":"crossref","unstructured":"Ferreira, C., Gama, J., Miranda, V., & Botterud, A. (2013). Probabilistic ramp detection and forecasting for wind power prediction. In Reliability and risk evaluation of wind integrated power systems (pp. 29\u201344). Springer India.","DOI":"10.1007\/978-81-322-0987-4_3"},{"key":"296_CR12","volume-title":"Analysis of West Texas wind plant ramp-up and ramp-down events","author":"J Freedman","year":"2008","unstructured":"Freedman, J., Markus, M., & Penc, R. (2008). Analysis of West Texas wind plant ramp-up and ramp-down events. Albany: AWS Truewind, LLC."},{"key":"296_CR13","doi-asserted-by":"publisher","first-page":"392","DOI":"10.1016\/j.enbuild.2013.07.062","volume":"67","author":"B Garl\u00edk","year":"2013","unstructured":"Garl\u00edk, B., & K\u0159ivan, M. (2013). Renewable energy unit commitment, with different acceptance of balanced power, solved by simulated annealing. Energy and Buildings, 67, 392\u2013402. doi: 10.1016\/j.enbuild.2013.07.062 .","journal-title":"Energy and Buildings"},{"issue":"4","key":"296_CR14","doi-asserted-by":"crossref","first-page":"309","DOI":"10.1260\/030952409789685681","volume":"33","author":"B Greaves","year":"2009","unstructured":"Greaves, B., Collins, J., Parkes, J., & Tindal, A. (2009). Temporal forecast uncertainty for ramp events. Wind Engineering, 33(4), 309\u2013319.","journal-title":"Wind Engineering"},{"key":"296_CR15","doi-asserted-by":"publisher","first-page":"427","DOI":"10.1016\/j.epsr.2014.07.010","volume":"116","author":"Y Huang","year":"2014","unstructured":"Huang, Y., Zheng, Q. P., & Wang, J. (2014). Two-stage stochastic unit commitment model including non-generation resources with conditional value-at-risk constraints. Electric Power Systems Research, 116, 427\u2013438. doi: 10.1016\/j.epsr.2014.07.010 .","journal-title":"Electric Power Systems Research"},{"key":"296_CR16","doi-asserted-by":"crossref","unstructured":"Kamath, C. (2010). Understanding wind ramp events through analysis of historical data. In IEEE PES transmission and distribution conference and exposition (pp. 1\u20136).","DOI":"10.1109\/TDC.2010.5484508"},{"key":"296_CR17","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-540-72377-6_6","volume-title":"Advances in evolutionary computing for system design","author":"V Miranda","year":"2007","unstructured":"Miranda, V., Keko, H., & Jaramillo, A. (2007). Advances in evolutionary computing for system design. New York: Springer. doi: 10.1007\/978-3-540-72377-6_6 ."},{"issue":"1","key":"296_CR18","doi-asserted-by":"publisher","first-page":"1080","DOI":"10.1109\/CEC.2002.1004393","volume":"1","author":"V Miranda","year":"2002","unstructured":"Miranda, V., & Fonseca, N. (2002). EPSO-best-of-two-worlds meta-heuristic applied to power system problems. IEEE Computer Society, 1(1), 1080\u20131085. doi: 10.1109\/CEC.2002.1004393 .","journal-title":"IEEE Computer Society"},{"issue":"2","key":"296_CR19","doi-asserted-by":"publisher","first-page":"105","DOI":"10.5019\/j.ijcir.2008.130","volume":"4","author":"V Miranda","year":"2008","unstructured":"Miranda, V., Hrvoje, H., & Jaramillo Duque, \u00c1. (2008). Stochastic star communication topology in evolutionary particle swarms (EPSO). International Journal of Computational Intelligence Research, 4(2), 105\u2013116. doi: 10.5019\/j.ijcir.2008.130 .","journal-title":"International Journal of Computational Intelligence Research"},{"key":"296_CR20","doi-asserted-by":"crossref","unstructured":"Miranda, V., & Proenca, L. M. (n.d.-a). Why risk analysis outperforms probabilistic choice as the effective decision support paradigm for power system planning. IEEE Transactions on Power Systems, 13(2), 643\u2013648. http:\/\/cat.inist.fr\/?aModele=afficheN&cpsidt=2274492 . Accessed Aug 7 2015.","DOI":"10.1109\/59.667394"},{"key":"296_CR21","doi-asserted-by":"crossref","unstructured":"Miranda, V., & Proenca, L. M. (n.d.-b). Probabilistic choice vs. risk analysis?: Conflicts and synthesis in power system planning. IEEE Transactions on Power Systems, 13(3), 1038\u20131043. http:\/\/cat.inist.fr\/?aModele=afficheN&cpsidt=2340596 . Accessed Aug 7 2015.","DOI":"10.1109\/59.709095"},{"key":"296_CR22","unstructured":"Monteiro, C., Bessa, R., Miranda, V., Botterud, A., Wang, J., & Conzelmann, G. (2009). Wind power forecasting: State-of-the-art 2009. Argonne National Laboratory Rep. ANL\/DIS-10-1, 216 pp. Available online at http:\/\/www.dis.anl.gov\/pubs\/65613.pdf ."},{"key":"296_CR23","doi-asserted-by":"publisher","unstructured":"Ortega-Vazquez, M. A., & Kirschen, D. S. (2009). Should the spinning reserve procurement in systems with wind power generation be deterministic or probabilistic? In International conference on sustainable power generation and supply, 2009. SUPERGEN \u201909 (pp. 1\u20139). doi: 10.1109\/SUPERGEN.2009.5348164 .","DOI":"10.1109\/SUPERGEN.2009.5348164"},{"key":"296_CR24","doi-asserted-by":"publisher","first-page":"12","DOI":"10.1016\/j.apenergy.2011.11.004","volume":"96","author":"P Pinson","year":"2012","unstructured":"Pinson, P., & Girard, R. (2012). Evaluating the quality of scenarios of short-term wind power generation. Applied Energy, 96, 12\u201320. doi: 10.1016\/j.apenergy.2011.11.004 .","journal-title":"Applied Energy"},{"key":"296_CR25","doi-asserted-by":"publisher","first-page":"550","DOI":"10.1016\/j.renene.2016.05.037","volume":"97","author":"MSS Pinto","year":"2016","unstructured":"Pinto, M. S. S., Miranda, V., & Saavedra, O. R. (2016). Risk and unit commitment decisions in scenarios of wind power uncertainty. Renewable Energy, 97, 550\u2013558. doi: 10.1016\/j.renene.2016.05.037 .","journal-title":"Renewable Energy"},{"key":"296_CR26","doi-asserted-by":"crossref","unstructured":"Potter, C. W., Grimit, E., & Nijssen, B. (2009). Potential benefits of a dedicated probabilistic rapid ramp event forecast tool. In Power systems conference and exposition, 2009. PSCE\u201909. IEEE\/PES (pp. 1\u20135). IEEE.","DOI":"10.1109\/PSCE.2009.4840109"},{"key":"296_CR27","doi-asserted-by":"publisher","unstructured":"Ruiz, P. A., Philbrick, C. R., & Sauer, P. W. (2009a). Wind power day-ahead uncertainty management through stochastic unit commitment policies. In IEEE\/PES power systems conference and exposition PSCE (pp. 1\u20139). doi: 10.1109\/PSCE.2009.4840133 .","DOI":"10.1109\/PSCE.2009.4840133"},{"key":"296_CR28","doi-asserted-by":"publisher","unstructured":"Ruiz, P. A., Philbrick, C. R., Zak, E., Cheung, K. W., & Sauer, P. W. (2009b). Uncertainty management in the unit commitment problem. IEEE Transactions on Power Systems, 24(2), 642\u2013651. doi: 10.1109\/TPWRS.2008.2012180 .","DOI":"10.1109\/TPWRS.2008.2012180"},{"key":"296_CR29","doi-asserted-by":"publisher","unstructured":"Sumaili, J., Keko, H., Miranda, V., Zhou, Z., Botterud, A., & Wang, J. (2011). Finding representative wind power scenarios and their probabilities for stochastic models. In 16th International conference on intelligent system applications to power systems, ISAP. doi: 10.1109\/ISAP.2011.6082195 .","DOI":"10.1109\/ISAP.2011.6082195"},{"issue":"2","key":"296_CR30","doi-asserted-by":"publisher","first-page":"592","DOI":"10.1109\/TPWRS.2009.2016470","volume":"24","author":"A Tuohy","year":"2009","unstructured":"Tuohy, A., Meibom, P., Denny, E., & O\u2019Malley, M. (2009). Unit commitment for systems with significant wind penetration. IEEE Transactions on Power Systems, 24(2), 592\u2013601. doi: 10.1109\/TPWRS.2009.2016470 .","journal-title":"IEEE Transactions on Power Systems"},{"key":"296_CR31","unstructured":"Vira, C., & Haimes, Y. Y. (1983). Multiobjective decision making: theory and methodology. North Holland Series in System Science and Engineering, 1(8), 422. http:\/\/bases.bireme.br\/cgi-bin\/wxislind.exe\/iah\/online\/?IsisScript=iah\/iah.xis&src=google&base=REPIDISCA&lang=p&nextAction=lnk&exprSearch=132053&indexSearch=ID ."},{"key":"296_CR32","unstructured":"Wang, J., Botterud, A., Miranda, V., Monteiro, C., & Sheble, G. (2009). Impact of wind power forecasting on unit commitment and dispatch. Electrical Engineering. http:\/\/www.dis.anl.gov\/pubs\/65610.pdf ."},{"issue":"3","key":"296_CR33","doi-asserted-by":"publisher","first-page":"1319","DOI":"10.1109\/TPWRS.2008.926719","volume":"23","author":"J Wang","year":"2008","unstructured":"Wang, J., Shahidehpour, M., & Li, Z. (2008). Security-constrained unit commitment with volatile wind power generation. IEEE Transactions on Power Systems, 23(3), 1319\u20131327. doi: 10.1109\/TPWRS.2008.926719 .","journal-title":"IEEE Transactions on Power Systems"},{"issue":"3","key":"296_CR34","doi-asserted-by":"publisher","first-page":"1364","DOI":"10.1109\/TPWRS.2008.922231","volume":"23","author":"L Wu","year":"2008","unstructured":"Wu, L., Shahidehpour, M., & Li, T. (2008). Cost of reliability analysis based on stochastic unit commitment. IEEE Transactions on Power Systems, 23(3), 1364\u20131374. doi: 10.1109\/TPWRS.2008.922231 .","journal-title":"IEEE Transactions on Power Systems"},{"issue":"4","key":"296_CR35","doi-asserted-by":"crossref","first-page":"1913","DOI":"10.1109\/TPWRS.2014.2355204","volume":"30","author":"QP Zheng","year":"2015","unstructured":"Zheng, Q. P., Wang, J., Member, S., & Liu, A. L. (2015). Stochastic optimization for unit commitment\u2014a review. IEEE Transactions on Power Systems, 30(4), 1913\u20131924.","journal-title":"IEEE Transactions on Power Systems"}],"container-title":["Journal of Control, Automation and Electrical Systems"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s40313-016-0296-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s40313-016-0296-5\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s40313-016-0296-5.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,9,18]],"date-time":"2019-09-18T16:57:28Z","timestamp":1568825848000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s40313-016-0296-5"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,2,17]]},"references-count":35,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2017,4]]}},"alternative-id":["296"],"URL":"https:\/\/doi.org\/10.1007\/s40313-016-0296-5","relation":{},"ISSN":["2195-3880","2195-3899"],"issn-type":[{"type":"print","value":"2195-3880"},{"type":"electronic","value":"2195-3899"}],"subject":[],"published":{"date-parts":[[2017,2,17]]}}}