{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,17]],"date-time":"2026-02-17T13:38:23Z","timestamp":1771335503628,"version":"3.50.1"},"reference-count":29,"publisher":"Springer Science and Business Media LLC","issue":"2","license":[{"start":{"date-parts":[[2016,11,9]],"date-time":"2016-11-09T00:00:00Z","timestamp":1478649600000},"content-version":"unspecified","delay-in-days":0,"URL":"http:\/\/www.springer.com\/tdm"}],"funder":[{"DOI":"10.13039\/501100001871","name":"Funda\u00e7\u00e3o para a Ci\u00eancia e a Tecnologia","doi-asserted-by":"publisher","award":["SFRH\/BD\/33785\/2009"],"award-info":[{"award-number":["SFRH\/BD\/33785\/2009"]}],"id":[{"id":"10.13039\/501100001871","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100001871","name":"Funda\u00e7\u00e3o para a Ci\u00eancia e a Tecnologia","doi-asserted-by":"publisher","award":["PTDC\/SEN-TRA\/112975\/2009"],"award-info":[{"award-number":["PTDC\/SEN-TRA\/112975\/2009"]}],"id":[{"id":"10.13039\/501100001871","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Int J Civ Eng"],"published-print":{"date-parts":[[2018,2]]},"DOI":"10.1007\/s40999-016-0121-3","type":"journal-article","created":{"date-parts":[[2016,11,8]],"date-time":"2016-11-08T21:49:14Z","timestamp":1478641754000},"page":"219-228","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":6,"title":["Assessing Temporary Speed Restrictions and Associated Unavailability Costs in Railway Infrastructure"],"prefix":"10.1007","volume":"16","author":[{"given":"Ant\u00f3nio Ramos","family":"Andrade","sequence":"first","affiliation":[]},{"given":"Paulo Fonseca","family":"Teixeira","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2016,11,9]]},"reference":[{"issue":"3","key":"121_CR1","doi-asserted-by":"crossref","first-page":"1","DOI":"10.4203\/ijrt.1.3.1","volume":"1","author":"C Stenstr\u00f6m","year":"2014","unstructured":"Stenstr\u00f6m C, Parida A, Galar D (2014) Performance indicators of railway infrastructure. Int J Railw Technol 1(3):1\u201318","journal-title":"Int J Railw Technol"},{"key":"121_CR2","doi-asserted-by":"crossref","first-page":"481","DOI":"10.2495\/UT070451","volume":"96","author":"M Veiseth","year":"2007","unstructured":"Veiseth M, Olsson N, Saetermo IAF (2007) Infrastructure\u2019s influence on rail punctuality. WIT Trans Built Environ 96:481\u2013490","journal-title":"WIT Trans Built Environ"},{"issue":"4","key":"121_CR3","doi-asserted-by":"crossref","first-page":"315","DOI":"10.1016\/j.jup.2004.07.006","volume":"12","author":"R Vickerman","year":"2004","unstructured":"Vickerman R (2004) Maintenance incentives under different infrastructure regimes. Util Policy 12(4):315\u2013322","journal-title":"Util Policy"},{"issue":"4","key":"121_CR4","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1016\/j.tranpol.2004.07.001","volume":"11","author":"NO Olsson","year":"2004","unstructured":"Olsson NO, Haugland H (2004) Influencing factors on train punctuality\u2014results from some Norwegian studies. Transp Policy 11(4):387\u2013397","journal-title":"Transp Policy"},{"key":"121_CR5","doi-asserted-by":"publisher","DOI":"10.1007\/s40999-016-0025-2","author":"R Luque","year":"2016","unstructured":"Luque R, Castro M (2016) Highway geometric design consistency: speed models and local or global assessment. Int J Civ Eng. doi:\n                        10.1007\/s40999-016-0025-2","journal-title":"Int J Civ Eng"},{"issue":"1","key":"121_CR6","first-page":"19","volume":"8","author":"IA Hansen","year":"2010","unstructured":"Hansen IA (2010) Railway Network timetabling and dynamic traffic management. Int J Civ Eng 8(1):19\u201332","journal-title":"Int J Civ Eng"},{"issue":"4","key":"121_CR7","doi-asserted-by":"crossref","first-page":"483","DOI":"10.1016\/j.tre.2009.04.016","volume":"46","author":"P Murali","year":"2010","unstructured":"Murali P, Dessouky M, Ord\u00f3\u00f1ez F, Palmer K (2010) A delay estimation technique for single and double-track railroads. Transp Res Part E Logist Transp Rev 46(4):483\u2013495","journal-title":"Transp Res Part E Logist Transp Rev"},{"key":"121_CR8","doi-asserted-by":"crossref","first-page":"124","DOI":"10.3141\/2261-14","volume":"2261","author":"B Schlake","year":"2011","unstructured":"Schlake B, Barkan C, Edwards J (2011) Train delay and economic impact of in-service failures of railroad rolling stock. Transp Res Record J Transp Res Board 2261:124\u2013133","journal-title":"Transp Res Record J Transp Res Board"},{"issue":"1","key":"121_CR9","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1016\/j.retrec.2012.10.003","volume":"41","author":"M Marinov","year":"2013","unstructured":"Marinov M, \u015eahin \u0130, Ricci S, Vasic-Franklin G (2013) Railway operations, time-tabling and control. Res Transp Econ 41(1):59\u201375","journal-title":"Res Transp Econ"},{"issue":"3","key":"121_CR10","doi-asserted-by":"crossref","first-page":"446","DOI":"10.1016\/j.tre.2008.08.004","volume":"45","author":"MF Gorman","year":"2009","unstructured":"Gorman MF (2009) Statistical estimation of railroad congestion delay. Transp Res Part E Logist Transp Rev 45(3):446\u2013456","journal-title":"Transp Res Part E Logist Transp Rev"},{"issue":"4","key":"121_CR11","doi-asserted-by":"crossref","first-page":"478","DOI":"10.1016\/j.trb.2006.06.006","volume":"41","author":"P Vansteenwegen","year":"2007","unstructured":"Vansteenwegen P, Van Oudheusden D (2007) Decreasing the passenger waiting time for an intercity rail network. Transp Res Part B Methodol 41(4):478\u2013492","journal-title":"Transp Res Part B Methodol"},{"key":"121_CR12","first-page":"27","volume":"46","author":"OA Nielsen","year":"2008","unstructured":"Nielsen OA, Landex A, Frederiksen RD (2008) Passenger delay models for rail networks. Sched Based Model Transp Netw Theory Appl 46:27","journal-title":"Sched Based Model Transp Netw Theory Appl"},{"issue":"2","key":"121_CR13","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1080\/03081069508717561","volume":"19","author":"A Higgins","year":"1995","unstructured":"Higgins A, Kozan E, Ferreira L (1995) Modelling delay risks associated with train schedules. Transp Plan Technol 19(2):89\u2013108","journal-title":"Transp Plan Technol"},{"key":"121_CR14","doi-asserted-by":"crossref","first-page":"163","DOI":"10.3141\/2261-19","volume":"2261","author":"AR Andrade","year":"2011","unstructured":"Andrade AR, Teixeira PF (2011) Biobjective optimization model for maintenance and renewal decisions related to rail track geometry. Transp Res Record J Transp Res Board 2261:163\u2013170","journal-title":"Transp Res Record J Transp Res Board"},{"issue":"6","key":"121_CR15","doi-asserted-by":"crossref","first-page":"400","DOI":"10.1680\/tran.11.00060","volume":"167","author":"AR Andrade","year":"2014","unstructured":"Andrade AR, Teixeira PF (2014) Unplanned-maintenance needs related to rail track geometry. Proceedings of the Institution of Civil Engineers-Transport 167(6):400\u2013410","journal-title":"Proceedings of the Institution of Civil Engineers-Transport"},{"key":"121_CR16","unstructured":"EN 13848-5 (2008): Railway applications\u2013Track\u2013Track geometry quality\u2014Part 5: Geometric quality levels"},{"issue":"1","key":"121_CR17","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.retrec.2012.03.011","volume":"36","author":"AR Andrade","year":"2012","unstructured":"Andrade AR, Teixeira PF (2012) A Bayesian model to assess rail track geometry degradation through its life-cycle. Res Transp Econ 36(1):1\u20138","journal-title":"Res Transp Econ"},{"issue":"4","key":"121_CR18","doi-asserted-by":"crossref","first-page":"364","DOI":"10.1177\/0954409713486619","volume":"227","author":"AR Andrade","year":"2013","unstructured":"Andrade AR, Teixeira PF (2013) Hierarchical Bayesian modelling of rail track geometry degradation. Proc Inst Mech Eng Part F J Rail Rapid Transit 227(4):364\u2013375","journal-title":"Proc Inst Mech Eng Part F J Rail Rapid Transit"},{"key":"121_CR19","doi-asserted-by":"crossref","first-page":"169","DOI":"10.1016\/j.ress.2015.05.009","volume":"142","author":"AR Andrade","year":"2015","unstructured":"Andrade AR, Teixeira PF (2015) Statistical modelling of railway track geometry degradation using Hierarchical Bayesian models. Reliab Eng System Saf 142:169\u2013183","journal-title":"Reliab Eng System Saf"},{"key":"121_CR20","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)TE.1943-5436.0000867","author":"AR Andrade","year":"2016","unstructured":"Andrade AR, Teixeira PF (2016) Exploring different alert limit strategies in the maintenance of railway track geometry. J Transp Eng. doi:\n                        10.1061\/(ASCE)TE.1943-5436.0000867","journal-title":"J Transp Eng"},{"issue":"3","key":"121_CR21","first-page":"232","volume":"8","author":"J Sadeghi","year":"2010","unstructured":"Sadeghi J (2010) Field investigation on vibration behavior of railway track systems. International J Civ Eng 8(3):232\u2013241","journal-title":"International J Civ Eng"},{"issue":"1","key":"121_CR22","first-page":"1","volume":"8","author":"T Dahlberg","year":"2010","unstructured":"Dahlberg T (2010) Railway track stiffness variations\u2014consequences and countermeasures. Int J Civ Eng 8(1):1\u201312","journal-title":"Int J Civ Eng"},{"issue":"11","key":"121_CR23","doi-asserted-by":"crossref","first-page":"2766","DOI":"10.1890\/07-0043.1","volume":"88","author":"JM Ver Hoef","year":"2007","unstructured":"Ver Hoef JM, Boveng PL (2007) Quasi-Poisson vs. negative binomial regression: how should we model overdispersed count data? Ecology 88(11):2766\u20132772","journal-title":"Ecology"},{"issue":"3","key":"121_CR24","doi-asserted-by":"crossref","first-page":"172","DOI":"10.1061\/(ASCE)1076-0342(2009)15:3(172)","volume":"15","author":"SD Guikema","year":"2009","unstructured":"Guikema SD, Coffelt JP (2009) Practical considerations in statistical modeling of count data for infrastructure systems. J Infrastruct Syst 15(3):172\u2013178","journal-title":"J Infrastruct Syst"},{"issue":"3","key":"121_CR25","doi-asserted-by":"crossref","first-page":"267","DOI":"10.1061\/(ASCE)0733-947X(1995)121:3(267)","volume":"121","author":"S Madanat","year":"1995","unstructured":"Madanat S, Ibrahim WHW (1995) Poisson regression models of infrastructure transition probabilities. J Transp Eng 121(3):267\u2013272","journal-title":"J Transp Eng"},{"issue":"4","key":"121_CR26","doi-asserted-by":"crossref","first-page":"258","DOI":"10.1061\/(ASCE)1076-0342(2005)11:4(258)","volume":"11","author":"H Liu","year":"2005","unstructured":"Liu H, Davidson RA, Rosowsky DV, Stedinger JR (2005) Negative binomial regression of electric power outages in hurricanes. J Infrastruct syst 11(4):258\u2013267","journal-title":"J Infrastruct syst"},{"issue":"1","key":"121_CR27","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1016\/j.retrec.2012.12.003","volume":"43","author":"AW Evans","year":"2013","unstructured":"Evans AW (2013) The economics of railway safety. Res Transp Econ 43(1):137\u2013147","journal-title":"Res Transp Econ"},{"issue":"1","key":"121_CR28","doi-asserted-by":"crossref","first-page":"71","DOI":"10.1016\/j.retrec.2012.12.007","volume":"43","author":"RB Noland","year":"2013","unstructured":"Noland RB (2013) From theory to practice in road safety policy: understanding risk versus mobility. Res Transp Econ 43(1):71\u201384","journal-title":"Res Transp Econ"},{"key":"121_CR29","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1111\/j.1468-0335.2008.00739.x","volume":"77","author":"G Friebel","year":"2010","unstructured":"Friebel G, Ivaldi M, Vibest C (2010) Railway (De)regulation: a European efficiency comparison. Economica 77:77\u201391","journal-title":"Economica"}],"container-title":["International Journal of Civil Engineering"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/link.springer.com\/article\/10.1007\/s40999-016-0121-3\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s40999-016-0121-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/s40999-016-0121-3.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2018,1,22]],"date-time":"2018-01-22T05:58:59Z","timestamp":1516600739000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/s40999-016-0121-3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,11,9]]},"references-count":29,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2018,2]]}},"alternative-id":["121"],"URL":"https:\/\/doi.org\/10.1007\/s40999-016-0121-3","relation":{},"ISSN":["1735-0522","2383-3874"],"issn-type":[{"value":"1735-0522","type":"print"},{"value":"2383-3874","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,11,9]]}}}