{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,30]],"date-time":"2026-01-30T05:48:59Z","timestamp":1769752139826,"version":"3.49.0"},"reference-count":47,"publisher":"Springer Science and Business Media LLC","issue":"1","license":[{"start":{"date-parts":[[2025,8,18]],"date-time":"2025-08-18T00:00:00Z","timestamp":1755475200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"},{"start":{"date-parts":[[2025,8,18]],"date-time":"2025-08-18T00:00:00Z","timestamp":1755475200000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0"}],"funder":[{"DOI":"10.13039\/501100007329","name":"University of the Valley","doi-asserted-by":"crossref","id":[{"id":"10.13039\/501100007329","id-type":"DOI","asserted-by":"crossref"}]}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["J Build Rehabil"],"published-print":{"date-parts":[[2026,1]]},"abstract":"<jats:title>Abstract<\/jats:title>\n                  <jats:p>A methodological development of a series of scripts created in Dynamo for Revit, aimed at improving workflows in prefabricated additive construction projects, is presented. Through a case study involving the construction of houses using 3D printing, automated solutions were explored to optimize the process from architectural design in BIM to the physical execution of the project. The results highlight how the integration of these digital tools can accelerate the design time in the manufacturing of prefabricated components, thereby demonstrating the potential of BIM for prefabricated additive construction.<\/jats:p>","DOI":"10.1007\/s41024-025-00678-6","type":"journal-article","created":{"date-parts":[[2025,8,18]],"date-time":"2025-08-18T07:58:48Z","timestamp":1755503928000},"update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["BIM integration in prefabricated additive construction projects, case study"],"prefix":"10.1007","volume":"11","author":[{"given":"Laura M.","family":"Henao-Rios","sequence":"first","affiliation":[]},{"given":"Armando","family":"Orobio","sequence":"additional","affiliation":[]},{"given":"Wilmer","family":"Campa\u00f1a","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2025,8,18]]},"reference":[{"issue":"1","key":"678_CR1","first-page":"105","volume":"15","author":"HA Agudelo","year":"2012","unstructured":"Agudelo HA, Hern\u00e1ndez AV, Cardona DAR (2012) Sostenibilidad: Actualidad y Necesidad En El sector de La construcci\u00f3n En Colombia. Gesti\u00f3n Y Ambiente 15(1):105\u2013118","journal-title":"Gesti\u00f3n Y Ambiente"},{"key":"678_CR2","unstructured":"C\u00e1mara Colombiana de la Construcci\u00f3n, C. (2018). Informe de productividad. Sector construcci\u00f3n de edificaciones. Bogot\u00e1 DC. [Online]. Available: https:\/\/camacol.co\/sites\/default\/files\/descargables\/INFORME%20DE%20PRODUCTIVIDAD.pdf"},{"key":"678_CR3","unstructured":"Barbosa F, Woetzel J, Mischke J (2017) Reinventing construction: A route of higher productivity. McKinsey Global Institute. [Online]. Available: http:\/\/dln.jaipuria.ac.in:8080\/jspui\/bitstream\/123456789\/2898\/1\/MGI-Reinventing-Construction-Full-report.pdf"},{"key":"678_CR4","unstructured":"Kuusi T, Kulvik M, Junnonen JM (2022) Productivity Growth in Construction Value Chains. International Productivity Monitor (42):3\u201332. http:\/\/www.csls.ca\/ipm\/42\/IPM_42_Kuusi.pdf"},{"issue":"4","key":"678_CR5","doi-asserted-by":"publisher","first-page":"335","DOI":"10.1080\/09537287.2020.1740815","volume":"32","author":"J Berlak","year":"2021","unstructured":"Berlak J, Hafner S, Kuppelwieser VG (2021) Digitalization\u2019s impacts on productivity: a model-based approach and evaluation in germany\u2019s Building construction industry. Prod Plann Control 32(4):335\u2013345. https:\/\/doi.org\/10.1080\/09537287.2020.1740815","journal-title":"Prod Plann Control"},{"key":"678_CR6","doi-asserted-by":"publisher","unstructured":"Forcael E, Ferrari I, Opazo-Vega A, Pulido-Arcas JA (2020) Construction 4.0: A literature review, Nov. 02. MDPI. https:\/\/doi.org\/10.3390\/su12229755","DOI":"10.3390\/su12229755"},{"key":"678_CR7","doi-asserted-by":"publisher","unstructured":"Davtalab O, Kazemian A, Khoshnevis B (May 2018) Perspectives on a BIM-integrated software platform for robotic construction through contour crafting. Autom Constr 89:13\u201323. https:\/\/doi.org\/10.1016\/j.autcon.2018.01.006","DOI":"10.1016\/j.autcon.2018.01.006"},{"key":"678_CR8","unstructured":"Sacks R, Gurevich U, Shrestha P (2016) A review of Building Information Modeling protocols, guides and standards for Large construction clients, [Online]. Available: http:\/\/www.itcon.org\/2016\/29"},{"key":"678_CR9","doi-asserted-by":"crossref","unstructured":"Ibrahim AQS, Moh\u2019d, Tarmizi HA (Jan 2020) Understanding the Conceptual of Building Information Modeling: A Literature Review. International Journal of Civil Engineering and Technology 11(1):165\u2013171","DOI":"10.34218\/IJCIET.11.1.2020.018"},{"key":"678_CR10","unstructured":"ISO 52939, Additive manufacturing for construction-Qualification principles-Structural and infrastructure elements (2023) [Online]. Available: https:\/\/www.iso.org\/obp"},{"key":"678_CR11","doi-asserted-by":"publisher","unstructured":"El-Sayegh S, Romdhane L, Manjikian S (Mar. 2020) A critical review of 3D printing in construction: benefits, challenges, and risks. Archives Civil Mech Eng 20(2):34. https:\/\/doi.org\/10.1007\/s43452-020-00038-w","DOI":"10.1007\/s43452-020-00038-w"},{"key":"678_CR12","doi-asserted-by":"publisher","unstructured":"Batikha M, Jotangia R, Baaj MY, Mousleh I (Feb. 2022) 3D concrete printing for sustainable and economical construction: A comparative study. Autom Constr 134:104087. https:\/\/doi.org\/10.1016\/j.autcon.2021.104087","DOI":"10.1016\/j.autcon.2021.104087"},{"key":"678_CR13","doi-asserted-by":"publisher","unstructured":"de Moreira LC, Mota PP, Machado FA (2021) BIM, IoT and MR Integration Applied on Risk Maps for Construction. In Lecture Notes in Civil Engineering 98:895\u2013906. https:\/\/doi.org\/10.1007\/978-3-030-51295-8_62","DOI":"10.1007\/978-3-030-51295-8_62"},{"key":"678_CR14","doi-asserted-by":"publisher","unstructured":"Gradeci K, Labonnote N On the potential of integrating Building information modelling (BIM) for the additive manufacturing (AM) of concrete structures. Jun 29 2020 Emerald Group Holdings Ltd https:\/\/doi.org\/10.1108\/CI-07-2019-0057","DOI":"10.1108\/CI-07-2019-0057"},{"key":"678_CR15","doi-asserted-by":"crossref","unstructured":"Murari SS, Joshi AM (2017) Precast Construction Methodology in Construction Industry, Jul. [Online]. Available: https:\/\/ssrn.com\/abstract=3496019","DOI":"10.2139\/ssrn.3496019"},{"key":"678_CR16","doi-asserted-by":"publisher","unstructured":"Reichenbach S, Kromoser B (2021) State of practice of automation in precast concrete production, Nov. 01. Elsevier Ltd. https:\/\/doi.org\/10.1016\/j.jobe.2021.102527","DOI":"10.1016\/j.jobe.2021.102527"},{"key":"678_CR17","doi-asserted-by":"publisher","unstructured":"Fu Y, Chen J, Lu W Human-robot collaboration for modular construction manufacturing: review of academic research. Feb 01 2024 Elsevier B V https:\/\/doi.org\/10.1016\/j.autcon.2023.105196","DOI":"10.1016\/j.autcon.2023.105196"},{"key":"678_CR18","doi-asserted-by":"publisher","unstructured":"Feldmann FG (Oct. 2022) Towards lean automation in Construction\u2014Exploring barriers to implementing automation in prefabrication. Sustain (Switzerland) 14(19). https:\/\/doi.org\/10.3390\/su141912944","DOI":"10.3390\/su141912944"},{"key":"678_CR19","doi-asserted-by":"publisher","unstructured":"Delgado Camacho D et al (May 2018) Applications of additive manufacturing in the construction industry\u2013 A forward-looking review. Autom Constr 89:110\u2013119. https:\/\/doi.org\/10.1016\/j.autcon.2017.12.031","DOI":"10.1016\/j.autcon.2017.12.031"},{"key":"678_CR20","doi-asserted-by":"publisher","unstructured":"Perkins I, Skitmore M (2015) Three-dimensional printing in the construction industry: A review. https:\/\/doi.org\/10.1080\/15623599.2015.1012136","DOI":"10.1080\/15623599.2015.1012136"},{"key":"678_CR21","doi-asserted-by":"publisher","unstructured":"Wang M, Wang CC, Sepasgozar S, Zlatanova S A systematic review of digital technology adoption in off-site construction: current status and future direction towards industry 4.0. Nov 01 2020 MDPI AG. https:\/\/doi.org\/10.3390\/buildings10110204","DOI":"10.3390\/buildings10110204"},{"key":"678_CR22","doi-asserted-by":"publisher","unstructured":"Xu Z, Song T, Guo S, Peng J, Zeng L, Zhu M (2022) Robotics technologies aided for 3D printing in construction: a review. https:\/\/doi.org\/10.1007\/s00170-021-08067-2","DOI":"10.1007\/s00170-021-08067-2"},{"key":"678_CR23","doi-asserted-by":"publisher","unstructured":"Gomaa M, Jabi W, Veliz Reyes A, Soebarto V (Apr. 2021) 3D printing system for earth-based construction: case study of cob. Autom Constr 124. https:\/\/doi.org\/10.1016\/j.autcon.2021.103577","DOI":"10.1016\/j.autcon.2021.103577"},{"key":"678_CR24","doi-asserted-by":"publisher","unstructured":"Al-Tamimi AK, Alqamish HH, Khaldoune A, Alhaidary H, Shirvanimoghaddam K (2023) Framework of 3D concrete printing potential and challenges. Buildings 13(3). https:\/\/doi.org\/10.3390\/buildings13030827","DOI":"10.3390\/buildings13030827"},{"key":"678_CR25","doi-asserted-by":"publisher","unstructured":"Buswell RA, Leal de Silva WR, Jones SZ, Dirrenberger J (2018) 3D printing using concrete extrusion: A roadmap for research, Oct. 01. Elsevier Ltd. https:\/\/doi.org\/10.1016\/j.cemconres.2018.05.006","DOI":"10.1016\/j.cemconres.2018.05.006"},{"key":"678_CR26","doi-asserted-by":"crossref","unstructured":"Rehman AU, Kim J-H (2021) 3D Concrete Printing: A Systematic Review of Rheology 14(14)","DOI":"10.3390\/ma14143800"},{"key":"678_CR27","doi-asserted-by":"publisher","unstructured":"Veer F, Chen Y, He S, Gan Y, Schlangen E (2021) A review of printing strategies, sustainable cementitious materials and characterization methods in the context of extrusion-based 3D concrete printing \u02d8 uzhan \u00c7opuro g, vol. 45, no. November 2022. https:\/\/doi.org\/10.1016\/j.jobe.2021.103599","DOI":"10.1016\/j.jobe.2021.103599"},{"key":"678_CR28","doi-asserted-by":"publisher","unstructured":"Weng Y et al (May 2021) Extracting BIM information for lattice toolpath planning in digital concrete printing with developed dynamo script: A case study. J Comput Civil Eng 35(3). https:\/\/doi.org\/10.1061\/(asce)cp.1943-5487.0000964","DOI":"10.1061\/(asce)cp.1943-5487.0000964"},{"key":"678_CR29","doi-asserted-by":"publisher","unstructured":"Charef R, Emmitt S, Alaka H, Fouchal F (Sep. 2019) Building information modelling adoption in the European union: an overview. J Building Eng 25. https:\/\/doi.org\/10.1016\/j.jobe.2019.100777","DOI":"10.1016\/j.jobe.2019.100777"},{"key":"678_CR30","doi-asserted-by":"publisher","unstructured":"Charef R, Alaka H, Emmitt S (Sep. 2018) Beyond the third dimension of BIM: A systematic review of literature and assessment of professional views. J Building Eng 19:242\u2013257. https:\/\/doi.org\/10.1016\/j.jobe.2018.04.028","DOI":"10.1016\/j.jobe.2018.04.028"},{"key":"678_CR31","doi-asserted-by":"publisher","unstructured":"Salman A (Jul. 2011) Building information modeling (BIM): trends, benefits, risks, and challenges for the AEC industry. Leadersh Manag Eng 11(3):241\u2013252. https:\/\/doi.org\/10.1061\/(ASCE)LM.1943-5630.0000127","DOI":"10.1061\/(ASCE)LM.1943-5630.0000127"},{"key":"678_CR32","unstructured":"Vijayeta R (2019) & Applicability of Agile Driven BIM at Conceptual & Design Phases of a Project-A Case Study. Project management in the emerging world of disruption, June, pp. 613\u2013631"},{"key":"678_CR33","doi-asserted-by":"publisher","unstructured":"Jiang Z (2021) Research on the application of 3D printing and BIM technology in the direction of bridges. In E3S Web of Conferences, EDP Sciences, May https:\/\/doi.org\/10.1051\/e3sconf\/202125702051","DOI":"10.1051\/e3sconf\/202125702051"},{"key":"678_CR34","doi-asserted-by":"publisher","unstructured":"Wegner P, Interoperability (1996) ACM Comput Surv 28(1):285\u2013287, Mar. https:\/\/doi.org\/10.1145\/234313.234424","DOI":"10.1145\/234313.234424"},{"key":"678_CR35","unstructured":"Coya JC (2023) Fundamentos de bim: bim en el proyecto"},{"key":"678_CR36","doi-asserted-by":"publisher","unstructured":"Shehzad HMF, Ibrahim RB, Yusof AF, Khaidzir KAM, Iqbal M, Razzaq S (Aug. 2021) The role of interoperability dimensions in Building information modelling. Comput Ind 129. https:\/\/doi.org\/10.1016\/j.compind.2021.103444","DOI":"10.1016\/j.compind.2021.103444"},{"key":"678_CR37","doi-asserted-by":"publisher","unstructured":"Sakin M, Kiroglu YC (2017) 3D printing of buildings: construction of the sustainable houses of the future by BIM. in Energy procedia. Elsevier Ltd, pp 702\u2013711. doi: https:\/\/doi.org\/10.1016\/j.egypro.2017.09.562.","DOI":"10.1016\/j.egypro.2017.09.562"},{"key":"678_CR38","doi-asserted-by":"publisher","first-page":"123","DOI":"10.1016\/j.proeng.2014.10.536","volume":"85","author":"L Ding","year":"2014","unstructured":"Ding L, Wei R, Che H (2014) Development of a BIM-based automated construction system. Procedia Eng 85:123\u2013131. https:\/\/doi.org\/10.1016\/j.proeng.2014.10.536","journal-title":"Procedia Eng"},{"key":"678_CR39","doi-asserted-by":"crossref","unstructured":"Perrot, A. (Ed.). (2019) 3D printing of concrete: state of the art and challenges of the digital construction revolution.","DOI":"10.1002\/9781119610755"},{"key":"678_CR40","doi-asserted-by":"publisher","unstructured":"Paolini A, Kollmannsberger S, Rank E (2019) Additive manufacturing in construction: A review on processes, applications, and digital planning methods. Addit Manuf 30. https:\/\/doi.org\/10.1016\/j.addma.2019.100894","DOI":"10.1016\/j.addma.2019.100894"},{"key":"678_CR41","doi-asserted-by":"publisher","unstructured":"Wang Y, Zhou Y, Zhou X, Han J (2023) Integrated Building Information Modelling and 3D Printing for Prefabricated Building. in Proceedings of the 35th Chinese Control and Decision Conference, CCDC, Institute of Electrical and Electronics Engineers Inc., 2023, pp. 2688\u20132693. doi:, Institute of Electrical and Electronics Engineers Inc., 2023, pp. 2688\u20132693. https:\/\/doi.org\/10.1109\/CCDC58219.2023.10326599","DOI":"10.1109\/CCDC58219.2023.10326599"},{"key":"678_CR42","doi-asserted-by":"publisher","unstructured":"Garc\u00eda-Alvarado R et al (Aug. 2024) From BIM model to 3D construction printing: A framework proposal. Front Architectural Res 13(4):912\u2013927. https:\/\/doi.org\/10.1016\/j.foar.2024.03.002","DOI":"10.1016\/j.foar.2024.03.002"},{"key":"678_CR43","doi-asserted-by":"publisher","DOI":"10.1080\/15623599.2024.2349831","author":"MA Berawi","year":"2024","unstructured":"Berawi MA, Sari M, Oktaviani AD, Miraj P, Susantono B, Woodhead R (2024) Impact of BIM and 3D printing technologies on production process and productivity of precast concrete in construction project. Int J Constr Manage. https:\/\/doi.org\/10.1080\/15623599.2024.2349831","journal-title":"Int J Constr Manage"},{"key":"678_CR44","doi-asserted-by":"publisher","unstructured":"Biancardo SA, Intignano M, Viscione N, Guerra De Oliveira S, Tibaut A (Mar. 2021) Procedural Modeling-Based BIM Approach for Railway Design. J Adv Transp 1\u201317. https:\/\/doi.org\/10.1155\/2021\/8839362","DOI":"10.1155\/2021\/8839362"},{"key":"678_CR45","doi-asserted-by":"publisher","unstructured":"Tang F, Ma T, Zhang J, Guan Y, Chen L (May 2020) Integrating three-dimensional road design and pavement structure analysis based on BIM. Autom Constr 113:103152. https:\/\/doi.org\/10.1016\/j.autcon.2020.103152","DOI":"10.1016\/j.autcon.2020.103152"},{"key":"678_CR46","doi-asserted-by":"publisher","unstructured":"Anane W, Iordanova I, Ouellet-Plamondon C (Jun. 2023) BIM-driven computational design for robotic manufacturing in off-site construction: an integrated Design-to-Manufacturing (DtM) approach. Autom Constr 150. https:\/\/doi.org\/10.1016\/j.autcon.2023.104782","DOI":"10.1016\/j.autcon.2023.104782"},{"key":"678_CR47","doi-asserted-by":"publisher","unstructured":"Forcael E, P\u00e9rez J, V\u00e1squez \u00c1, Garc\u00eda-Alvarado R, Orozco F, Sep\u00falveda J (Aug. 2021) Development of communication protocols between Bim elements and 3D concrete printing. Appl Sci (Switzerland) 11(16). https:\/\/doi.org\/10.3390\/app11167226","DOI":"10.3390\/app11167226"}],"container-title":["Journal of Building Pathology and Rehabilitation"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s41024-025-00678-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s41024-025-00678-6","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s41024-025-00678-6.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,1,29]],"date-time":"2026-01-29T15:40:09Z","timestamp":1769701209000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s41024-025-00678-6"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,8,18]]},"references-count":47,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2026,1]]}},"alternative-id":["678"],"URL":"https:\/\/doi.org\/10.1007\/s41024-025-00678-6","relation":{},"ISSN":["2365-3159","2365-3167"],"issn-type":[{"value":"2365-3159","type":"print"},{"value":"2365-3167","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,8,18]]},"assertion":[{"value":"5 March 2025","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"23 June 2025","order":2,"name":"revised","label":"Revised","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"22 July 2025","order":3,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"18 August 2025","order":4,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare no competing interests.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Competing interests"}}],"article-number":"14"}}