{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,25]],"date-time":"2026-04-25T14:35:45Z","timestamp":1777127745368,"version":"3.51.4"},"reference-count":63,"publisher":"Springer Science and Business Media LLC","issue":"12","license":[{"start":{"date-parts":[[2024,12,2]],"date-time":"2024-12-02T00:00:00Z","timestamp":1733097600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0"},{"start":{"date-parts":[[2024,12,2]],"date-time":"2024-12-02T00:00:00Z","timestamp":1733097600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"short-container-title":["Discov Appl Sci"],"DOI":"10.1007\/s42452-024-06316-z","type":"journal-article","created":{"date-parts":[[2024,12,2]],"date-time":"2024-12-02T16:39:24Z","timestamp":1733157564000},"update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":4,"title":["Survey on the use of BIM methodology for railway 3D modeling"],"prefix":"10.1007","volume":"6","author":[{"given":"Ana","family":"Malta","sequence":"first","affiliation":[]},{"given":"Torres","family":"Farinha","sequence":"additional","affiliation":[]},{"given":"Antonio J. Marques","family":"Cardoso","sequence":"additional","affiliation":[]},{"given":"Mateus","family":"Mendes","sequence":"additional","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,12,2]]},"reference":[{"key":"6316_CR1","unstructured":"David E. Weisberg. The Engineering Design Revolution, 2022 Avail- able at: https:\/\/www.shapr3d.com\/blog\/history-of-cad (last ac- cess on 2024\u201309\u201325)."},{"key":"6316_CR2","unstructured":"Eastman CM. An Outline of the Building Descrip- tion System, 1974. Research report (Carnegie-Mellon University. Institute of Physical Planning). Available at https:\/\/books.google.pt\/books?id=mCpsHAAACAAJ (last access on 2024\u201309\u201325)."},{"key":"6316_CR3","unstructured":"Eastman CM, Teicholz P, Sacks R, Liston K. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, De- signers, Engineers and Contractors. John Wiley & Sons, 2011."},{"key":"6316_CR4","doi-asserted-by":"publisher","first-page":"109","DOI":"10.1016\/j.autcon.2013.10.023","volume":"38","author":"R Volk","year":"2014","unstructured":"Volk R, Stengel J, Schultmann F. Building Information modeling (bim) for existing buildings\u2014literature review and future needs. Autom Constr. 2014;38:109\u201327.","journal-title":"Au- tom Constr"},{"key":"6316_CR5","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2021.103564","volume":"124","author":"Y Pan","year":"2021","unstructured":"Pan Y, Zhang L. A BIM-data mining integrated digital twin frame- work for advanced project management. Autom Constr. 2021;124: 103564.","journal-title":"Autom Constr"},{"key":"6316_CR6","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2020.103270","volume":"118","author":"F Xue","year":"2020","unstructured":"Xue F, Lu W. A semantic differential transaction approach to min- imizing information redundancy for BIM and blockchain integration. Autom Constr. 2020;118: 103270.","journal-title":"Autom Constr"},{"key":"6316_CR7","doi-asserted-by":"publisher","first-page":"142","DOI":"10.3390\/jimaging9070142","volume":"9","author":"A Malta","year":"2023","unstructured":"Malta A, Farinha T, Mendes M. Augmented reality in mainte- nance\u2014history and perspectives. J Imaging. 2023;9:142.","journal-title":"J Imaging"},{"key":"6316_CR8","doi-asserted-by":"publisher","first-page":"103115","DOI":"10.1016\/j.autcon.2020.103115","volume":"113","author":"JP Cort\u00b4es-P\u00b4erez","year":"2020","unstructured":"Cort\u00b4es-P\u00b4erez JP, Cort\u00b4es-P\u00b4erez A, Prieto-Muriel P. BIM-integrated management of occupational hazards in building construction and maintenance. Autom Constr. 2020;113:103115.","journal-title":"Autom Constr"},{"key":"6316_CR9","doi-asserted-by":"crossref","unstructured":"Borrmann A, Ko\u00a8nig M, Koch C, Beetz J. Building information modeling: Why? what? how?; Springer, 2018.","DOI":"10.1007\/978-3-319-92862-3"},{"issue":"4","key":"6316_CR10","first-page":"15","volume":"12","author":"S Azhar","year":"2012","unstructured":"Azhar S, Khalfan M, Maqsood T. Building information modeling (BIM): now and beyond. Australas J Constr Eco- nomics Build,. 2012;12(4):15\u201328.","journal-title":"Australas J Constr Eco- nomics Build,"},{"key":"6316_CR11","unstructured":"Pinho FAA. Norma BIM portuguesa. Master\u2019s thesis, 2015 Available at: https: \/\/ estudogeral. uc. pt\/ bitstream\/ 10316\/ 38575\/ 1\/ Norma\\ %20BIM\\ %20portuguesa. pdf (last access on 2024\u201309\u201325)."},{"key":"6316_CR12","unstructured":"AIA DE. Building information modeling protocol exhibit. The Amer- ican Institute of Architects 2008, 9p."},{"key":"6316_CR13","doi-asserted-by":"publisher","first-page":"933","DOI":"10.4028\/www.scientific.net\/AMM.773-774.933","volume":"773","author":"AA Latiffi","year":"2015","unstructured":"Latiffi AA, Brahim J, Mohd S, Fathi MS. Building information modeling (BIM): exploring level of development (LOD) in construction projects. Appl Mech Mater. 2015;773:933\u20137.","journal-title":"Appl Mech Mater"},{"key":"6316_CR14","doi-asserted-by":"crossref","unstructured":"Alavi SH, Forcada N. BIM LOD for facility management tasks. In EC3 Conference 2019; European Council on Computing in Construc- tion: 2019;1: 154\u201363.","DOI":"10.35490\/EC3.2019.187"},{"key":"6316_CR15","unstructured":"BIMForum. Level of development specification Part I & commentary for building information models and data. 2023;"},{"key":"6316_CR16","doi-asserted-by":"crossref","unstructured":"Piaseckiene\u02d9, G. \u201dDimensions of BIM in literature: Review and analysis.\u201d Mokslas\u2013Lietuvos ateitis\/Science\u2013Future of Lithuania 14 (2022).","DOI":"10.3846\/mla.2022.16071"},{"key":"6316_CR17","doi-asserted-by":"publisher","first-page":"103153","DOI":"10.1016\/j.autcon.2020.103153","volume":"114","author":"A Koutamanis","year":"2020","unstructured":"Koutamanis A. Dimensionality in BIM: why bim cannot have more than four dimensions? Autom Constr. 2020;114:103153.","journal-title":"Autom Constr"},{"key":"6316_CR18","doi-asserted-by":"publisher","first-page":"103327","DOI":"10.1016\/j.compind.2020.103327","volume":"123","author":"A Darko","year":"2020","unstructured":"Darko A, Chan APC, Yang Y, Tet- teh MO. Building information modeling (BIM)-based modular integrated construction risk management\u2013Critical survey and future needs. Computers Ind. 2020;123:103327.","journal-title":"Com- puters Ind"},{"key":"6316_CR19","doi-asserted-by":"publisher","first-page":"242","DOI":"10.1016\/j.jobe.2018.04.028","volume":"19","author":"R Charef","year":"2018","unstructured":"Charef R, Alaka H, Emmitt S. Beyond the third dimension of BIM: a systematic review of literature and assessment of professional views. J Build Eng. 2018;19:242\u201357.","journal-title":"J Build Eng"},{"key":"6316_CR20","unstructured":"Kulkarni A, Sagheer R, Pathmanathan R, Jay S, Cristobal S. \u201dBuilding information modelling- enhancing productivity in rail infrastructure construction.\u201d In First international conference on 3D construction printing (3DcP), and the 6th international conference on innovative production and construction (IPC 2018), 25\u20138. 2018."},{"key":"6316_CR21","unstructured":"Amor R, Jiang Y, Chen X. BIM in 2007\u2013are we there yet?. Proceedings of CIB W78 conference on Bringing ITC knowledge to work, Maribor, Slovenia 2007, 26\u20139."},{"issue":"66","key":"6316_CR22","first-page":"99","volume":"2","author":"M Malewczyk","year":"2021","unstructured":"Malewczyk M. The usage of the openBIM idea in architectural design on the example of Blender and BlenderBIM add-on. Architectus. 2021;2(66):99\u2013104.","journal-title":"Architectus"},{"issue":"13","key":"6316_CR23","first-page":"40","volume":"2","author":"I Djurayev","year":"2023","unstructured":"Djurayev I. Understanding of blender software. Mod-els methods mod sci. 2023;2(13):40\u20135.","journal-title":"Mod-els methods mod sci"},{"key":"6316_CR24","unstructured":"Unity Technologies. Unity Manual: Working in Unity 2024. Available at: https:\/\/docs.unity3d.com\/Manual\/UnityOverview.htm0l (last access on 2024\u201309\u201325)."},{"key":"6316_CR25","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1155\/2021\/8839362","volume":"2021","author":"SA Biancardo","year":"2021","unstructured":"Biancardo SA, Intignano M, Viscione N, Guerra De Oliveira S, Tibaut A. Procedural modeling-based BIM approach for railway de- sign. J Adv Trans. 2021;2021:1\u201317.","journal-title":"J Adv Trans"},{"issue":"4","key":"6316_CR26","doi-asserted-by":"publisher","first-page":"573","DOI":"10.1016\/j.aei.2011.07.003","volume":"25","author":"A Watson","year":"2011","unstructured":"Watson A. Digital buildings\u2013challenges and opportunities. Ad- v eng inf. 2011;25(4):573\u201381.","journal-title":"Ad- v eng inf"},{"issue":"5","key":"6316_CR27","first-page":"18","volume":"1","author":"S Firoz","year":"2012","unstructured":"Firoz S, Rao SK. Modelling concept of sustain- able steel building by Tekla Software. Int J Eng Res Dev. 2012;1(5):18\u201324.","journal-title":"Int J Eng Res Dev"},{"key":"6316_CR28","unstructured":"Liebich, T. IFC4\u2014The new buildingSMART standard. In IC Meeting; bSI Publications Helsinki: Finland, 2013; pp. 1\u201325."},{"key":"6316_CR29","doi-asserted-by":"publisher","first-page":"102252","DOI":"10.1016\/j.asej.2023.102252","volume":"15","author":"X Pan","year":"2023","unstructured":"Pan X, Khan AM, Eldin SM, Aslam F, Rehman SKU, Jameel M. BIM adoption in sustainability, energy modelling and implementing using ISO 19650: a review. Ain Shams Eng J. 2023;15:102252.","journal-title":"Ain Shams Eng J"},{"key":"6316_CR30","unstructured":"Zolfagharian, S, Eastman, CM. Processes and Challenges to Develop Precast Concrete Test Cases for the National BIM Standard (NBIMS). In 32rd International CIB W78 Conference; 2015."},{"issue":"1","key":"6316_CR31","doi-asserted-by":"publisher","first-page":"4","DOI":"10.1108\/BEPAM-07-2013-0023","volume":"5","author":"R Eadie","year":"2015","unstructured":"Eadie R, Browne M, Odeyinka H, McKeown C, McNiff S. A survey of current status of and perceived changes required for BIM adoption in the UK. Built Environ Proj Asset Manag. 2015;5(1):4\u201321.","journal-title":"Built Environ Proj Asset Manag"},{"key":"6316_CR32","unstructured":"East W. COBIE (Construction-Operations Building Information Ex- change). US Army Engineer Research and Development Center, US Army Corps of Engineers, Washington, DC, USA 2007."},{"key":"6316_CR33","unstructured":"Oldfield J, Bergs R, van Oosterom P, Krijnen T, Galano M. 3D cadastral lifecycle: An information delivery manual ISO 29481 for 3D data extraction from the building permit application process. In Proceedings of the 7th International FIG Workshop on the Land Ad- ministration Domain Model, Zagreb, Croatia; 2018, 12\u20133."},{"key":"6316_CR34","unstructured":"BSI Standards Publication. ISO 21597\u20131. Information container for linked document delivery\u2014Exchange specification\u2014Part 1: Con- tainer. 2020."},{"key":"6316_CR35","unstructured":"Fernandes PJM. Metodologias BIM no Controlo Financeiro de Empreitadas. 2022."},{"key":"6316_CR36","doi-asserted-by":"publisher","first-page":"105114","DOI":"10.1016\/j.autcon.2023.105114","volume":"156","author":"A Alqatawna","year":"2023","unstructured":"Alqatawna A, Sa\u00b4nchez-Cambronero S, Gallego I, Rivas A. BIM- centered high-speed railway line design for full infrastructure lifecycle. Autom Constr. 2023;156:105114.","journal-title":"Autom Constr"},{"key":"6316_CR37","doi-asserted-by":"crossref","unstructured":"Campbell DA. Building information modeling: the Web3D applica- tion for AEC. Proceedings of the twelfth international conference on 3D web technology 2007, 173\u20136.","DOI":"10.1145\/1229390.1229422"},{"key":"6316_CR38","unstructured":"Bin L, Yan W, Jia-chen L, Zhen C, Gupta PK, Jian-sheng M, Dong-bo L, Yang L. Review on BIM technology in railway vehicle operation and maintenance. 2021, 21(6), 106\u201323"},{"key":"6316_CR39","first-page":"1","volume":"2021","author":"Y Wu","year":"2021","unstructured":"Wu Y, Zhao L-Y, Jiang Y-X, Li W, Wang Y-S, Zhao H, Wu W, Zhang X-J. Research and application of intelligent monitor- ing system platform for safety risk and risk investigation in urban rail transit engineering construction. Adv Civ Eng. 2021;2021:1\u201310.","journal-title":"Adv Civ Eng"},{"key":"6316_CR40","doi-asserted-by":"crossref","unstructured":"Biancardo SA, Palazzo S, Intignano M, Dell\u2019acqua G. BIM for railway infrastructure: the case study of the Ogliastro\u2013Sapri High- Speed rail. Vilnius Gediminas Technical University 2023.","DOI":"10.3846\/enviro.2023.916"},{"issue":"2","key":"6316_CR41","doi-asserted-by":"publisher","first-page":"103","DOI":"10.1108\/SASBE-11-2017-0060","volume":"8","author":"M Bensalah","year":"2019","unstructured":"Bensalah M, Elouadi A, Mharzi H. Overview: the opportunity of BIM in railway. Smart Sustain Built Environ. 2019;8(2):103\u201316.","journal-title":"Smart Sustain Built Environ"},{"key":"6316_CR42","doi-asserted-by":"publisher","first-page":"37","DOI":"10.2495\/BIM170041","volume":"169","author":"M Suchocki","year":"2017","unstructured":"Suchocki M. The BIM-for-rail opportunity. WIT Trans Built Environ. 2017;169:37\u201344.","journal-title":"WIT Trans Built Environ"},{"key":"6316_CR43","doi-asserted-by":"crossref","unstructured":"Leone M, D\u2019Andrea A, Loprencipe G, Malavasi G, Bernardini L. Building Information Modeling (BIM): Prospects for the development of railway infrastructure industry. In Transport Infrastructure and Sys- tems; CRC Press, 2017, pp. 547\u201354","DOI":"10.1201\/9781315281896-71"},{"key":"6316_CR44","doi-asserted-by":"publisher","first-page":"166039","DOI":"10.1109\/ACCESS.2021.3135451","volume":"9","author":"J Sresakoolchai","year":"2021","unstructured":"Sresakoolchai J, Kaewunruen S. Integration of building information modeling and machine learning for railway defect localization. IEEE Access. 2021;9:166039\u201347.","journal-title":"IEEE Access"},{"key":"6316_CR45","doi-asserted-by":"crossref","unstructured":"Arashpour M, Bai Y, Kamat V, Hosseini R, Martek I. Project production flows in off-site prefabrication: BIM-enabled railway in- frastructure. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction 2018, 35, 1\u20138.","DOI":"10.22260\/ISARC2018\/0011"},{"key":"6316_CR46","unstructured":"Gao G, Liu Y-S, Wu J-X, Gu M, Yang X-K, Li H-L. IFC rail-way: A semantic and geometric modeling approach for railways based on IFC. Proceedings of the 16th International Conference on Comput- ing in Civil and Building Engineering, Osaka, Japan 2016, 6."},{"issue":"10","key":"6316_CR47","doi-asserted-by":"publisher","first-page":"3649","DOI":"10.3390\/app10103649","volume":"10","author":"TH Kwon","year":"2020","unstructured":"Kwon TH, Park SI, Jang Y-H, Lee S-H. Design of railway track model with three-dimensional alignment based on extended industry foundation classes. Appl Sci. 2020;10(10):3649.","journal-title":"Appl Sci"},{"key":"6316_CR48","doi-asserted-by":"crossref","unstructured":"Tveit M, Gjerde K. Using building information modelling for plan- ning a high-speed rail project in Norway. In Proceedings of the Institu-tion of Civil Engineers-Civil Engineering; Thomas Telford Ltd: 2018; 171(3) 121\u2013128.","DOI":"10.1680\/jcien.17.00039"},{"key":"6316_CR49","unstructured":"Landes B. (2017). Interview to mediaconstruct. fr in 16\/03\/2016."},{"issue":"1","key":"6316_CR50","first-page":"18","volume":"4","author":"J-F Shr","year":"2016","unstructured":"Shr J-F, Liu L-S. Application of BIM (Building Information Mod- eling) and GIS (Geographic Information System) to RAILWAY Mainte- nance Works in Taiwan. J Traffic Trans Eng. 2016;4(1):18\u201322.","journal-title":"J Traffic Trans Eng"},{"key":"6316_CR51","first-page":"504","volume":"2014","author":"S-H Lee","year":"2014","unstructured":"Lee S-H, Park SI, Park J, Seo K-W. Open BIM-based informa- tion modeling of railway bridges and its application concept. Computing Civ Build Eng. 2014;2014:504\u201311.","journal-title":"Com-puting Civ Build Eng"},{"key":"6316_CR52","unstructured":"Norberg A. Implementing Building Information Modeling within the railway sector. 2012."},{"issue":"6","key":"6316_CR53","doi-asserted-by":"publisher","first-page":"659","DOI":"10.1002\/geot.201600053","volume":"9","author":"H Ehrbar","year":"2016","unstructured":"Ehrbar H. Building Information Modelling\u2013A new tool for the suc- cessful implementation of major projects of German railways\/Building Information Modelling-Ein neues Werkzeug zur erfolgreichen Real- isierung von Gro\u00dfprojekten der Deutschen Bahn. Geomech Tunn. 2016;9(6):659\u201373.","journal-title":"Geomech Tunn"},{"issue":"6","key":"6316_CR54","first-page":"443","volume":"75","author":"F Abbondati","year":"2020","unstructured":"Abbondati F, Biancardo SA, Sicignano G, Guerra de Oliveira S, Tibaut A, Dell\u2019Acqua G. Bim parametric modelling of a railway underpass [Modellazione parametrica in ambiente bim di un sottovia ferroviario]. Ing Ferrov. 2020;75(6):443\u201359.","journal-title":"Ing Ferrov"},{"key":"6316_CR55","doi-asserted-by":"crossref","unstructured":"Cho H, Lee KH, Lee SH, Lee T, Cho HJ, Kim SH, Nam SH. Introduction of Construction management integrated system using BIM in the Honam High-speed railway lot No. 4\u20132. Proceedings of the 28th ISARC, Seoul, Korea 2011, 29.","DOI":"10.22260\/ISARC2011\/0239"},{"key":"6316_CR56","unstructured":"Bahn AG Deutsche. Anlage 3a zur Vereinbarung zur Finanzierung von Building Information Modeling (BIM) bei Pilotprojekten im Rahmen des Zukunfts investitions programms. 2016."},{"key":"6316_CR57","doi-asserted-by":"crossref","unstructured":"Kenley R, Harfield T. Behnam, A. BIM interoperability limitations: Australian and Malaysian rail projects. EDP Sciences-Web of Confer- ences 2016.","DOI":"10.1051\/matecconf\/20166600102"},{"key":"6316_CR58","unstructured":"Trimble. Sets the standard for BIM in railway projects. Availableonline:http: \/\/ www. novapoint. com\/ sets-standard-bim-railway-projects (last access on 2024- 09\u201325);."},{"issue":"1","key":"6316_CR59","doi-asserted-by":"publisher","first-page":"8","DOI":"10.3390\/infrastructures4010008","volume":"4","author":"J Neves","year":"2019","unstructured":"Neves J, Sampaio Z, Vilela M. A case study of BIM implementation in rail track rehabilitation. Infrastructures. 2019;4(1):8.","journal-title":"Infrastructures"},{"issue":"5","key":"6316_CR60","doi-asserted-by":"publisher","first-page":"3176","DOI":"10.3390\/app13053176","volume":"13","author":"JJ Cepa","year":"2023","unstructured":"Cepa JJ, Pav\u00f3n RM, Alberti MG, Ciccone A, Asprone D. A review on the implementation of the BIM methodology in the operation maintenance and transport infrastructure. Appl Sci. 2023;13(5):3176.","journal-title":"Appl Sci"},{"issue":"1","key":"6316_CR61","first-page":"23398","volume":"9","author":"M Bensalah","year":"2018","unstructured":"Bensalah M, Elouadi A, Mharzi H. Integrating BIM in railway projects review & perspectives for Morocco and MENA. Int J Recent Sci Res. 2018;9(1):23398\u2013403.","journal-title":"Int J Recent Sci Res"},{"key":"6316_CR62","doi-asserted-by":"publisher","first-page":"5368","DOI":"10.3390\/app12115368","volume":"12","author":"I Kim","year":"2022","unstructured":"Kim I, Kim JI. Special issue on BIM and its integration with emerg- ing technologies. Appl Sci. 2022;12:5368.","journal-title":"Appl Sci"},{"issue":"7","key":"6316_CR63","doi-asserted-by":"publisher","first-page":"1593","DOI":"10.3390\/buildings13071593","volume":"13","author":"A Salzano","year":"2023","unstructured":"Salzano A, Intignano M, Mottola C, Biancardo SA, Nicolella M, Dell\u2019Acqua G. Systematic literature review of open infrastructure BIM. Buildings. 2023;13(7):1593.","journal-title":"Buildings"}],"container-title":["Discover Applied Sciences"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s42452-024-06316-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/article\/10.1007\/s42452-024-06316-z\/fulltext.html","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/s42452-024-06316-z.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,12,2]],"date-time":"2024-12-02T17:09:44Z","timestamp":1733159384000},"score":1,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/s42452-024-06316-z"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2024,12,2]]},"references-count":63,"journal-issue":{"issue":"12","published-online":{"date-parts":[[2024,12]]}},"alternative-id":["6316"],"URL":"https:\/\/doi.org\/10.1007\/s42452-024-06316-z","relation":{},"ISSN":["3004-9261"],"issn-type":[{"value":"3004-9261","type":"electronic"}],"subject":[],"published":{"date-parts":[[2024,12,2]]},"assertion":[{"value":"19 August 2024","order":1,"name":"received","label":"Received","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"4 November 2024","order":2,"name":"accepted","label":"Accepted","group":{"name":"ArticleHistory","label":"Article History"}},{"value":"2 December 2024","order":3,"name":"first_online","label":"First Online","group":{"name":"ArticleHistory","label":"Article History"}},{"order":1,"name":"Ethics","group":{"name":"EthicsHeading","label":"Declarations"}},{"value":"The authors declare no competing interests.","order":2,"name":"Ethics","group":{"name":"EthicsHeading","label":"Competing interests"}}],"article-number":"657"}}