{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,1]],"date-time":"2026-05-01T01:05:21Z","timestamp":1777597521957,"version":"3.51.4"},"reference-count":17,"publisher":"Elsevier BV","issue":"2","license":[{"start":{"date-parts":[[1995,3,1]],"date-time":"1995-03-01T00:00:00Z","timestamp":794016000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2013,7,17]],"date-time":"2013-07-17T00:00:00Z","timestamp":1374019200000},"content-version":"vor","delay-in-days":6713,"URL":"https:\/\/www.elsevier.com\/open-access\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Discrete Applied Mathematics"],"published-print":{"date-parts":[[1995,3]]},"DOI":"10.1016\/0166-218x(93)e0125-i","type":"journal-article","created":{"date-parts":[[2002,7,26]],"date-time":"2002-07-26T02:14:35Z","timestamp":1027649675000},"page":"157-168","source":"Crossref","is-referenced-by-count":47,"title":["New results on the completion time variance minimization"],"prefix":"10.1016","volume":"58","author":[{"given":"Wieslaw","family":"Kubiak","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/0166-218X(93)E0125-I_BIB1","doi-asserted-by":"crossref","first-page":"118","DOI":"10.1287\/opre.37.1.118","article-title":"Simultaneous minimization of mean and variation of flow time and waiting time in single machine systems","volume":"37","author":"Bagchi","year":"1989","journal-title":"Oper. Res."},{"key":"10.1016\/0166-218X(93)E0125-I_BIB2","doi-asserted-by":"crossref","first-page":"894","DOI":"10.1287\/mnsc.33.7.894","article-title":"Minimizing mean squared deviation of completion times about a common due date","volume":"33","author":"Bagchi","year":"1987","journal-title":"Management Sci."},{"key":"10.1016\/0166-218X(93)E0125-I_BIB3","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1287\/opre.38.1.22","article-title":"Sequencing with earliness and tardiness penalties: a review","volume":"38","author":"Baker","year":"1990","journal-title":"Oper. Res."},{"key":"10.1016\/0166-218X(93)E0125-I_BIB4","series-title":"Progress in Combinatorial Optimization","first-page":"13","article-title":"Partitioning, spectra and linear programming","author":"Barnes","year":"1984"},{"key":"10.1016\/0166-218X(93)E0125-I_BIB5","article-title":"Variance minimization in single machine systems: complexity and algorithm","author":"Cai","year":"1991"},{"key":"10.1016\/0166-218X(93)E0125-I_BIB6","doi-asserted-by":"crossref","first-page":"1143","DOI":"10.1287\/mnsc.35.9.1143","article-title":"A note on the minimization of mean squared deviation of completion times about a common due date","volume":"35","author":"De","year":"1989","journal-title":"Management Sci."},{"key":"10.1016\/0166-218X(93)E0125-I_BIB7","unstructured":"P. De, J.B. Ghosh and C.E. Wells, On the minimization of completion time variance with a bi-criteria extension, Oper. Res., to appear."},{"key":"10.1016\/0166-218X(93)E0125-I_BIB8","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1016\/0305-0548(90)90046-A","article-title":"Scheduling about a common due date with earliness and tardiness penalties","volume":"17","author":"De","year":"1990","journal-title":"Comput. Res."},{"key":"10.1016\/0166-218X(93)E0125-I_BIB9","doi-asserted-by":"crossref","first-page":"567","DOI":"10.1287\/mnsc.23.6.567","article-title":"Minimizing waiting time variance in the single machine problem","volume":"23","author":"Eilon","year":"1977","journal-title":"Management Sci."},{"key":"10.1016\/0166-218X(93)E0125-I_BIB10","doi-asserted-by":"crossref","first-page":"567","DOI":"10.1016\/0167-6377(91)90024-J","article-title":"Proof of a conjecture of Schrage about the completion time variance problem","volume":"10","author":"Hall","year":"1991","journal-title":"Oper. Res. Lett."},{"key":"10.1016\/0166-218X(93)E0125-I_BIB11","first-page":"111","article-title":"SWEAT\u2014A program for a scheduling problem with earliness and tardiness penalties","volume":"43","author":"Kahlbacher","year":"1989","journal-title":"European J. Oper. Res."},{"key":"10.1016\/0166-218X(93)E0125-I_BIB12","doi-asserted-by":"crossref","first-page":"1453","DOI":"10.1287\/mnsc.27.12.1453","article-title":"Minimizing variation of flow time in single machine systems","volume":"27","author":"Kanet","year":"1981","journal-title":"Management Sci."},{"key":"10.1016\/0166-218X(93)E0125-I_BIB13","doi-asserted-by":"crossref","first-page":"49","DOI":"10.1016\/0167-6377(93)90019-D","article-title":"Completion time variance minimization on single machine is difficult","volume":"14","author":"Kubiak","year":"1993","journal-title":"Oper. Res. Lett."},{"key":"10.1016\/0166-218X(93)E0125-I_BIB14","doi-asserted-by":"crossref","first-page":"518","DOI":"10.1287\/mnsc.18.9.518","article-title":"Variance minimization in single machine sequencing problems","volume":"18","author":"Merten","year":"1972","journal-title":"Management Sci."},{"key":"10.1016\/0166-218X(93)E0125-I_BIB15","series-title":"Integer and Combinatorial Optimization","author":"Nemhauser","year":"1988"},{"key":"10.1016\/0166-218X(93)E0125-I_BIB16","doi-asserted-by":"crossref","first-page":"540","DOI":"10.1287\/mnsc.21.5.540","article-title":"Minimizing the time-in-system variance for a finite jobset","volume":"21","author":"Schrage","year":"1975","journal-title":"Management Sci."},{"key":"10.1016\/0166-218X(93)E0125-I_BIB17","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1287\/opre.35.1.111","article-title":"Deterministic and random single machine sequencing with variance minimization","volume":"35","author":"Vani","year":"1987","journal-title":"Oper. Res."}],"container-title":["Discrete Applied Mathematics"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:0166218X93E0125I?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:0166218X93E0125I?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,4,14]],"date-time":"2019-04-14T21:54:47Z","timestamp":1555278887000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/0166218X93E0125I"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1995,3]]},"references-count":17,"journal-issue":{"issue":"2","published-print":{"date-parts":[[1995,3]]}},"alternative-id":["0166218X93E0125I"],"URL":"https:\/\/doi.org\/10.1016\/0166-218x(93)e0125-i","relation":{},"ISSN":["0166-218X"],"issn-type":[{"value":"0166-218X","type":"print"}],"subject":[],"published":{"date-parts":[[1995,3]]}}}