{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,23]],"date-time":"2026-02-23T20:52:41Z","timestamp":1771879961338,"version":"3.50.1"},"reference-count":30,"publisher":"Elsevier BV","issue":"2","license":[{"start":{"date-parts":[[1996,5,1]],"date-time":"1996-05-01T00:00:00Z","timestamp":830908800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Decision Support Systems"],"published-print":{"date-parts":[[1996,5]]},"DOI":"10.1016\/0167-9236(95)00029-1","type":"journal-article","created":{"date-parts":[[2003,4,5]],"date-time":"2003-04-05T00:18:15Z","timestamp":1049501895000},"page":"141-157","source":"Crossref","is-referenced-by-count":50,"title":["Combining knowledge-based systems and simulation to solve rescheduling problems"],"prefix":"10.1016","volume":"17","author":[{"given":"R.","family":"Belz","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"P.","family":"Mertens","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"issue":"No. 1","key":"10.1016\/0167-9236(95)00029-1_BIB1","first-page":"43","article-title":"The Leitstand: A New Tool for Computer-Integrated Manufacturing","volume":"32","author":"Adelsberger","year":"1991","journal-title":"Production and Inventory Management"},{"key":"10.1016\/0167-9236(95)00029-1_BIB2","series-title":"Match-Up Real-Time Scheduling","author":"Bean","year":"1985"},{"key":"10.1016\/0167-9236(95)00029-1_BIB3","series-title":"Proceedings of the 1986 Summer Computer Simulation Conference","first-page":"731","article-title":"EXCON: An Expert System to Construct Control Strategies for Simulation Systems in Manufacturing","author":"Becker","year":"1986"},{"key":"10.1016\/0167-9236(95)00029-1_BIB4","series-title":"Proceedings of the 1992 European Simulation Symposium, Simulation and AI in Computer-Aided Techniques","first-page":"371","article-title":"SIMULEX: Solving Rescheduling Problems By Knowledge-based Simulation","author":"Belz","year":"1992"},{"key":"10.1016\/0167-9236(95)00029-1_BIB5","series-title":"Operational Research '84 IFORS","first-page":"477","article-title":"PROMETHEE: A New Family of Outranking Methods in Multicriteria Analysis","author":"Brans","year":"1984"},{"key":"10.1016\/0167-9236(95)00029-1_BIB6","article-title":"Truncated Inverse Sampling Procedure for Multinomial Subset Selection","author":"Chen","year":"1987"},{"issue":"No. 12","key":"10.1016\/0167-9236(95)00029-1_BIB7","doi-asserted-by":"crossref","first-page":"676","DOI":"10.1515\/zwf-1989-841207","article-title":"Kapazit\u00e4tsorientierte Auftragsbildungsverfahren","volume":"84","author":"Dangelmaier","year":"1989","journal-title":"Zeitschrift f\u00fcr wirtschaftliche Fertigung und Automatisierung"},{"issue":"No. 1","key":"10.1016\/0167-9236(95)00029-1_BIB8","first-page":"4","article-title":"Einsatz von k\u00fcnstlicher Intelligenz bei der Produktionsplanung und -steuerung","volume":"6","author":"Dangelmaier","year":"1990","journal-title":"CIM Management"},{"key":"10.1016\/0167-9236(95)00029-1_BIB9","series-title":"Proceedings of the 1988 Summer Computer Simulation Conference","first-page":"648","article-title":"Combining Simulation and Artificial Intelligence: A Practical Example","author":"Ford","year":"1988"},{"key":"10.1016\/0167-9236(95)00029-1_BIB10","series-title":"Second Conference on Artificial Intelligence Applications","first-page":"387","article-title":"Complexity, Uncertainty and Opportunistic Scheduling","author":"Fox","year":"1985"},{"key":"10.1016\/0167-9236(95)00029-1_BIB11","series-title":"Proceedings of the 1984 Winter Simulation Conference","first-page":"107","article-title":"On Selecting the Best of K Systems: Expository Survey of Indifference-Zone Multinomial Procedures","author":"Goldsman","year":"1984"},{"key":"10.1016\/0167-9236(95)00029-1_BIB12","series-title":"Proceedings of the 1984 Winter Simulation Conference","first-page":"259","article-title":"A Multinomial Ranking And Selection Procedure: Simulation And Applications","author":"Goldsman","year":"1984"},{"key":"10.1016\/0167-9236(95)00029-1_BIB13","series-title":"Proceedings of the 1991 Winter Simulation Conference","first-page":"177","article-title":"Methods for Selecting the Best System","author":"Goldsman","year":"1991"},{"issue":"No. 29","key":"10.1016\/0167-9236(95)00029-1_BIB14","first-page":"1","article-title":"On Selection and Ranking Procedures and Order Statistics from the Multinomial Distribution","author":"Gupta","year":"1967","journal-title":"Sankhya: The Indian Journal of Statistics"},{"key":"10.1016\/0167-9236(95)00029-1_BIB15","year":"1990"},{"key":"10.1016\/0167-9236(95)00029-1_BIB16","year":"1990"},{"key":"10.1016\/0167-9236(95)00029-1_BIB17","series-title":"Simulation Modeling and Analysis","author":"Law","year":"1991"},{"issue":"No. 4","key":"10.1016\/0167-9236(95)00029-1_BIB18","doi-asserted-by":"crossref","first-page":"134","DOI":"10.1177\/003754978905200402","article-title":"A Statistical Expert System for Simulation Analysis","volume":"52","author":"Mellichamp","year":"1989","journal-title":"Simulation"},{"key":"10.1016\/0167-9236(95)00029-1_BIB19","series-title":"Interaktive betriebswirtschaftliche Informations- und Steuerungssysteme","first-page":"13","article-title":"Ein Ansatz zu kooperierenden Expertensystemen bei der Produktionsplanung und -steuerung","author":"Mertens","year":"1989"},{"issue":"No. 1","key":"10.1016\/0167-9236(95)00029-1_BIB20","doi-asserted-by":"crossref","first-page":"10","DOI":"10.1177\/003754978604600102","article-title":"Simulation and Expert Systems: A Taxonomy and some Examples","volume":"46","author":"O'Keefe","year":"1986","journal-title":"Simulation"},{"key":"10.1016\/0167-9236(95)00029-1_BIB21","first-page":"285","article-title":"Manufacturing Experience with the Contract Net","volume":"1","author":"Parunak","year":"1988"},{"key":"10.1016\/0167-9236(95)00029-1_BIB22","series-title":"Proceedings of the European Simulation Multiconference: Simulation in the Factory of the Future and Simulation in Traffic Control","first-page":"61","article-title":"Data Analysis Oriented Techniques for Learning about Manufacturing Control with Simulation","author":"Pierreval","year":"1988"},{"key":"10.1016\/0167-9236(95)00029-1_BIB23","series-title":"On Language, Learning and Artificial Intelligence","article-title":"The Cognitive Computer","author":"Schank","year":"1984"},{"key":"10.1016\/0167-9236(95)00029-1_BIB24","article-title":"Werkstattsteuerung bei wechselnder Auftragsstruktur","author":"Schmitt","year":"1989"},{"key":"10.1016\/0167-9236(95)00029-1_BIB25","series-title":"Proceedings of the 1988 Summer Computer Simulation Conference","first-page":"569","article-title":"Automatic Programming of Manufacturing Simulation Models","author":"Schroer","year":"1988"},{"issue":"No. 3","key":"10.1016\/0167-9236(95)00029-1_BIB26","doi-asserted-by":"crossref","first-page":"195","DOI":"10.1016\/0278-6125(92)90005-Z","article-title":"A Knowledge-Based Simulation Architecture to Analyze Interruptions in a Flexible Manufacturing System","volume":"11","author":"Tajanithi","year":"1992","journal-title":"Journal of Manufacturing Systems"},{"issue":"No. 1","key":"10.1016\/0167-9236(95)00029-1_BIB27","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0305-0548(93)90091-V","article-title":"One-Machine Rescheduling Heuristics With Efficiency and Stability as Criteria","volume":"20","author":"Wu","year":"1993","journal-title":"Computers and Operations Research"},{"key":"10.1016\/0167-9236(95)00029-1_BIB28","series-title":"Seminar f\u00fcr Allgemeine Betriebswirtschaft","article-title":"Expertensysteme in der Proze\u03b2planung und -steuerung in der Fabrik der Zukunft \u2014 Ein \u00dcberblick \u00fcber Konzepte und erste Prototypen","author":"Zelewski","year":"1988"},{"issue":"No. 2","key":"10.1016\/0167-9236(95)00029-1_BIB29","first-page":"72","article-title":"Neue Ans\u00e4tze zur Strukturierung von PPS-Sstemen \u2014 Erwartungsbezogene und kundenauftragsorientierte Disposition","volume":"38","author":"Zimmermann","year":"1989","journal-title":"Fortschrittliche Betriebsf\u00fchrung\/Industrial Engineering"},{"key":"10.1016\/0167-9236(95)00029-1_BIB30","series-title":"PPS-Methoden auf dem Pr\u00fcfstand: Was leisten sie, wann versagen sie?","author":"Zimmermann","year":"1987"}],"container-title":["Decision Support Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:0167923695000291?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:0167923695000291?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2023,12,31]],"date-time":"2023-12-31T00:32:29Z","timestamp":1703982749000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/0167923695000291"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1996,5]]},"references-count":30,"journal-issue":{"issue":"2","published-print":{"date-parts":[[1996,5]]}},"alternative-id":["0167923695000291"],"URL":"https:\/\/doi.org\/10.1016\/0167-9236(95)00029-1","relation":{},"ISSN":["0167-9236"],"issn-type":[{"value":"0167-9236","type":"print"}],"subject":[],"published":{"date-parts":[[1996,5]]}}}