{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,1]],"date-time":"2025-11-01T21:39:02Z","timestamp":1762033142067},"reference-count":21,"publisher":"Elsevier","isbn-type":[{"value":"9780444894656","type":"print"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[1992]]},"DOI":"10.1016\/b978-0-444-89465-6.50052-1","type":"book-chapter","created":{"date-parts":[[2013,11,18]],"date-time":"2013-11-18T11:22:03Z","timestamp":1384773723000},"page":"577-584","source":"Crossref","is-referenced-by-count":53,"title":["Flow Control Strategy for Flexible Machining and Assembly System"],"prefix":"10.1016","author":[{"given":"Young-Hae","family":"Lee","sequence":"first","affiliation":[]},{"given":"Kazuaki","family":"Iwata","sequence":"additional","affiliation":[]},{"given":"Yoshiro","family":"Fukuda","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/B978-0-444-89465-6.50052-1_bib1","doi-asserted-by":"crossref","first-page":"331","DOI":"10.1016\/S0378-4754(98)90004-0","article-title":"\u201cOptimization of Discrete Variable Stochastic Systems by Computer Simulation\u201d","volume":"30","author":"Azadivar","year":"1988","journal-title":"J. of Math. & Computers in Simulation"},{"issue":"9","key":"10.1016\/B978-0-444-89465-6.50052-1_bib2","doi-asserted-by":"crossref","first-page":"1024","DOI":"10.1109\/9.58530","article-title":"\u201cManufacturing Flow Control and Preventive Maintenance: A Stochastic Control Approach\u201d","volume":"35","author":"Boukas","year":"1990","journal-title":"IEEE Trans. Automatic Control"},{"issue":"1","key":"10.1016\/B978-0-444-89465-6.50052-1_bib3","doi-asserted-by":"crossref","first-page":"27","DOI":"10.1016\/0278-6125(89)90017-4","article-title":"\u201cFlexible Assembly Systems: The Scheduling Problem for Multiple Products\u201d","volume":"8","author":"Donath","year":"1989","journal-title":"J. of Manufacturing Systems"},{"issue":"5","key":"10.1016\/B978-0-444-89465-6.50052-1_bib4","doi-asserted-by":"crossref","first-page":"1099","DOI":"10.1080\/00207548608919790","article-title":"\u201cScheduling an Automated Non-ferrous Sand Casting Foundry Using Off-line Simulation\u201d","volume":"24","author":"Dewhurst","year":"1986","journal-title":"Int. J. of Prod. Res."},{"issue":"4","key":"10.1016\/B978-0-444-89465-6.50052-1_bib5","doi-asserted-by":"crossref","first-page":"671","DOI":"10.1080\/00207548908942575","article-title":"\u201cThe Effects of Product Structure and Sequencing Rule on Assembly Shop Performance\u201d","volume":"27","author":"Fry","year":"1989","journal-title":"Int. J. of Prod. Res."},{"key":"10.1016\/B978-0-444-89465-6.50052-1_bib6","doi-asserted-by":"crossref","unstructured":"Gershwin, S. B.,1989, \u201cHierarchical Flow Control: A Framework for Scheduling and Planning Discrete Events in Manufacturing Systems\u201d, Proceedings of the IEEE, 77, 1, 195\u2013209.","DOI":"10.1109\/5.21079"},{"issue":"4","key":"10.1016\/B978-0-444-89465-6.50052-1_bib7","doi-asserted-by":"crossref","first-page":"392","DOI":"10.1147\/rd.294.0392","article-title":"\u201cShort-term Production Scheduling of an Automated Manufacturing Facility\u201d","volume":"29","author":"Gershwin","year":"1985","journal-title":"IBM J. Res. Develop."},{"issue":"6","key":"10.1016\/B978-0-444-89465-6.50052-1_bib8","doi-asserted-by":"crossref","first-page":"1105","DOI":"10.1080\/00207548808947921","article-title":"\u201cUsing the Kanban in a Job Shop Environment\u201d","volume":"26","author":"Gravel","year":"1988","journal-title":"Int. J. of Prod. Res."},{"issue":"6","key":"10.1016\/B978-0-444-89465-6.50052-1_bib9","doi-asserted-by":"crossref","first-page":"356","DOI":"10.1080\/09511928908944424","article-title":"\u201cA Review of Scheduling Rules in Flexible Manufacturing Systems\u201d","volume":"2","author":"Gupta","year":"1989","journal-title":"Int. J. Computer Integrated Manufacturing"},{"issue":"4","key":"10.1016\/B978-0-444-89465-6.50052-1_bib10","doi-asserted-by":"crossref","first-page":"353","DOI":"10.1080\/05695558308974659","article-title":"\u201cAn Algorithm for the Computer Control of a Flexible Manufacturing System\u201d","volume":"15","author":"Kimemia","year":"1983","journal-title":"IIE Trans."},{"issue":"4","key":"10.1016\/B978-0-444-89465-6.50052-1_bib11","doi-asserted-by":"crossref","first-page":"451","DOI":"10.1109\/70.88060","article-title":"\u201cAggregate Scheduling of a Flexible Machining and Assembly System\u201d","volume":"5","author":"Kusiak","year":"1989","journal-title":"IEEE Trans. Robotics and Automation"},{"key":"10.1016\/B978-0-444-89465-6.50052-1_bib12","doi-asserted-by":"crossref","first-page":"337","DOI":"10.1007\/BF02186802","article-title":"\u201cScheduling Flexible Machining and Assembly Systems\u201d","volume":"15","author":"Kusiak","year":"1988","journal-title":"Annals of O.R."},{"issue":"1","key":"10.1016\/B978-0-444-89465-6.50052-1_bib13","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1080\/03052158708941080","article-title":"\u201cModeling and Solving the Flexible Forging Module Scheduling Problem\u201d","volume":"12","author":"Kusiak","year":"1987","journal-title":"Eng. Opt."},{"key":"10.1016\/B978-0-444-89465-6.50052-1_bib14","doi-asserted-by":"crossref","first-page":"233","DOI":"10.1007\/BF02096607","article-title":"\u201cOptimal Control Rules for Scheduling Job Shops\u201d","volume":"17","author":"Lou","year":"1989","journal-title":"Annals of O. R."},{"issue":"2","key":"10.1016\/B978-0-444-89465-6.50052-1_bib15","doi-asserted-by":"crossref","first-page":"279","DOI":"10.1287\/opre.36.2.279","article-title":"\u201cDynamic Scheduling for Flexible Manufacturing Systems that Have Unreliable Machines\u201d","volume":"36","author":"Maimon","year":"1988","journal-title":"Oper. Res."},{"issue":"7","key":"10.1016\/B978-0-444-89465-6.50052-1_bib16","doi-asserted-by":"crossref","first-page":"620","DOI":"10.1109\/9.1270","article-title":"\u201cProduction Control of a Manufacturing System with Multiple Machine States\u201d","volume":"33","author":"Sharifnia","year":"1988","journal-title":"IEEE Trans. Automatic Control"},{"key":"10.1016\/B978-0-444-89465-6.50052-1_bib17","doi-asserted-by":"crossref","first-page":"163","DOI":"10.1007\/BF02096603","article-title":"\u201cMulti-level Production Scheduling for a Class of Flexible Machining and Assembly Systems\u201d","volume":"17","author":"Toczylowski","year":"1989","journal-title":"Annals of O. R."},{"issue":"1","key":"10.1016\/B978-0-444-89465-6.50052-1_bib18","doi-asserted-by":"crossref","first-page":"33","DOI":"10.1016\/S0007-8506(07)62646-8","article-title":"\u201cHierarchical Control of a Generic Flexible Assembly Cell\u201d","volume":"38","author":"van Brussel","year":"1989","journal-title":"Annals of CIRP"},{"issue":"1","key":"10.1016\/B978-0-444-89465-6.50052-1_bib19","doi-asserted-by":"crossref","first-page":"19","DOI":"10.1016\/S0007-8506(07)60994-9","article-title":"\u201cSESFAC: A Scheduling Expert System for Flexible Assembly Cell\u201d","volume":"39","author":"van Brussel","year":"1990","journal-title":"Annals of CIRP"},{"key":"10.1016\/B978-0-444-89465-6.50052-1_bib20","unstructured":"Woo, K. B. and Lee, C. H., 1990, \u201cIntelligent Control for Job Scheduling in Manufacturing\u201d, Proc. of 1990 JAPAN-U.S.A. Symp. on Flexible Automation, 1155\u20131158, Kyoto, Japan."},{"key":"10.1016\/B978-0-444-89465-6.50052-1_bib21","unstructured":"Zhijun, H. and Kai, Z., 1990, \u201cA New Control Method and System for FMS Job Scheduling\u201d, 1990 Trans. of NAMRI\/SME, 312\u2013316."}],"container-title":["Human Aspects in Computer Integrated Manufacturing"],"original-title":[],"language":"en","deposited":{"date-parts":[[2018,10,10]],"date-time":"2018-10-10T06:27:03Z","timestamp":1539152823000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/B9780444894656500521"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1992]]},"ISBN":["9780444894656"],"references-count":21,"URL":"https:\/\/doi.org\/10.1016\/b978-0-444-89465-6.50052-1","relation":{},"subject":[],"published":{"date-parts":[[1992]]}}}