{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,8,19]],"date-time":"2026-08-19T17:46:10Z","timestamp":1787161570595,"version":"build-2736575974"},"reference-count":22,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2023,5,1]],"date-time":"2023-05-01T00:00:00Z","timestamp":1682899200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2023,5,1]],"date-time":"2023-05-01T00:00:00Z","timestamp":1682899200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/legal\/tdmrep-license"},{"start":{"date-parts":[[2023,5,1]],"date-time":"2023-05-01T00:00:00Z","timestamp":1682899200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-017"},{"start":{"date-parts":[[2023,5,1]],"date-time":"2023-05-01T00:00:00Z","timestamp":1682899200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"},{"start":{"date-parts":[[2023,5,1]],"date-time":"2023-05-01T00:00:00Z","timestamp":1682899200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-012"},{"start":{"date-parts":[[2023,5,1]],"date-time":"2023-05-01T00:00:00Z","timestamp":1682899200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2023,5,1]],"date-time":"2023-05-01T00:00:00Z","timestamp":1682899200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-004"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["71901026"],"award-info":[{"award-number":["71901026"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Computers &amp; Industrial Engineering"],"published-print":{"date-parts":[[2023,5]]},"DOI":"10.1016\/j.cie.2023.109223","type":"journal-article","created":{"date-parts":[[2023,4,3]],"date-time":"2023-04-03T11:53:57Z","timestamp":1680522837000},"page":"109223","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":13,"special_numbering":"C","title":["An integrated optimization of lot-sizing and condition-based maintenance policy of a two-stage deteriorating system"],"prefix":"10.1016","volume":"179","author":[{"given":"Sen","family":"Tian","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Nan","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-0482-5347","authenticated-orcid":false,"given":"Mitra","family":"Fouladirad","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"78","reference":[{"issue":"4","key":"10.1016\/j.cie.2023.109223_b1","doi-asserted-by":"crossref","first-page":"385","DOI":"10.1080\/095372897235190","article-title":"A simple approximation of the EMQ model with Poisson machine failures","volume":"8","author":"Abboud","year":"1997","journal-title":"Production Planning and Control"},{"key":"10.1016\/j.cie.2023.109223_b2","unstructured":"Abboud, N. E., & Remeily, H. E. (1995). An approximate model to the production lot-sizing problem with Poisson machine breakdowns and low failure rate. In Proceedings of the international conference on industrial engineering and production management (pp. 33\u201342)."},{"issue":"6","key":"10.1016\/j.cie.2023.109223_b3","doi-asserted-by":"crossref","first-page":"489","DOI":"10.1080\/074081791009068","article-title":"A change-point analysis for modeling incomplete burn-in for light displays","volume":"38","author":"Bae","year":"2006","journal-title":"IIE Transactions"},{"issue":"8","key":"10.1016\/j.cie.2023.109223_b4","doi-asserted-by":"crossref","first-page":"840","DOI":"10.1057\/palgrave.jors.2600586","article-title":"Integrated production and quality model under various preventive maintenance policies","volume":"49","author":"Ben-Daya","year":"1998","journal-title":"Journal of the Operational Research Society"},{"issue":"3","key":"10.1016\/j.cie.2023.109223_b5","doi-asserted-by":"crossref","first-page":"360","DOI":"10.1002\/asmb.2076","article-title":"Bayesian gamma processes for optimizing condition-based maintenance under uncertainty","volume":"31","author":"Bousquet","year":"2015","journal-title":"Applied Stochastic Models in Business and Industry"},{"issue":"2","key":"10.1016\/j.cie.2023.109223_b6","doi-asserted-by":"crossref","first-page":"606","DOI":"10.1016\/j.ejor.2007.01.011","article-title":"Production lot sizing with process deterioration and machine breakdown","volume":"185","author":"Chakraborty","year":"2008","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.cie.2023.109223_b7","doi-asserted-by":"crossref","first-page":"538","DOI":"10.1016\/j.cie.2017.06.033","article-title":"Joint optimization of lot sizing and condition-based maintenance for multi-component production systems","volume":"110","author":"Cheng","year":"2017","journal-title":"Computers & Industrial Engineering"},{"key":"10.1016\/j.cie.2023.109223_b8","doi-asserted-by":"crossref","first-page":"251","DOI":"10.1016\/j.ress.2018.03.025","article-title":"Integrated production, quality control and condition-based maintenance for imperfect production systems","volume":"175","author":"Cheng","year":"2018","journal-title":"Reliability Engineering & System Safety"},{"issue":"1","key":"10.1016\/j.cie.2023.109223_b9","doi-asserted-by":"crossref","first-page":"139","DOI":"10.1016\/S0360-8352(96)00207-0","article-title":"Bounds for production lot sizing with machine breakdowns","volume":"32","author":"Chung","year":"1997","journal-title":"Computers & Industrial Engineering"},{"issue":"10","key":"10.1016\/j.cie.2023.109223_b10","doi-asserted-by":"crossref","first-page":"1499","DOI":"10.1016\/S0305-0548(02)00079-5","article-title":"Approximations to production lot sizing with machine breakdowns","volume":"30","author":"Chung","year":"2003","journal-title":"Computers & Operations Research"},{"issue":"6","key":"10.1016\/j.cie.2023.109223_b11","doi-asserted-by":"crossref","first-page":"611","DOI":"10.1016\/j.ress.2010.12.008","article-title":"Condition-based maintenance for a system subject to a non-homogeneous wear process with a wear rate transition","volume":"96","author":"Fouladirad","year":"2011","journal-title":"Reliability Engineering & System Safety"},{"issue":"6","key":"10.1016\/j.cie.2023.109223_b12","doi-asserted-by":"crossref","first-page":"543","DOI":"10.1080\/07408170590929018","article-title":"Residual-life distributions from component degradation signals: A Bayesian approach","volume":"37","author":"Gebraeel","year":"2005","journal-title":"IIE Transactions"},{"issue":"5","key":"10.1016\/j.cie.2023.109223_b13","doi-asserted-by":"crossref","first-page":"563","DOI":"10.1057\/palgrave.jors.2601840","article-title":"Exact formulation of stochastic EMQ model for an unreliable production system","volume":"56","author":"Giri","year":"2005","journal-title":"Journal of the Operational Research Society"},{"issue":"2","key":"10.1016\/j.cie.2023.109223_b14","doi-asserted-by":"crossref","first-page":"229","DOI":"10.1016\/j.ijpe.2004.01.004","article-title":"Optimal lot sizing for an unreliable production system under partial backlogging and at most two failures in a production cycle","volume":"95","author":"Giri","year":"2005","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"10.1016\/j.cie.2023.109223_b15","doi-asserted-by":"crossref","first-page":"104","DOI":"10.1287\/mnsc.38.1.104","article-title":"Production lot sizing with machine breakdowns","volume":"38","author":"Groenevelt","year":"1992","journal-title":"Management Science"},{"issue":"5","key":"10.1016\/j.cie.2023.109223_b16","doi-asserted-by":"crossref","first-page":"1621","DOI":"10.1007\/s00170-016-8556-x","article-title":"Joint optimization of lot-sizing and maintenance policy for a partially observable two-unit system","volume":"87","author":"Jafari","year":"2016","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"10.1016\/j.cie.2023.109223_b17","doi-asserted-by":"crossref","first-page":"88","DOI":"10.1016\/j.cie.2015.12.009","article-title":"Optimal lot-sizing and maintenance policy for a partially observable production system","volume":"93","author":"Jafari","year":"2016","journal-title":"Computers & Industrial Engineering"},{"issue":"8","key":"10.1016\/j.cie.2023.109223_b18","doi-asserted-by":"crossref","first-page":"2480","DOI":"10.1080\/00207543.2018.1521021","article-title":"Integrated production quality and condition-based maintenance optimisation for a stochastically deteriorating manufacturing system","volume":"57","author":"Khatab","year":"2019","journal-title":"International Journal of Production Research"},{"key":"10.1016\/j.cie.2023.109223_b19","doi-asserted-by":"crossref","first-page":"699","DOI":"10.1016\/j.apm.2018.07.039","article-title":"Reliability evaluation based on a dependent two-stage failure process with competing failures","volume":"64","author":"Qiu","year":"2018","journal-title":"Applied Mathematical Modelling"},{"issue":"18","key":"10.1016\/j.cie.2023.109223_b20","first-page":"1410","article-title":"The most economical production lot","volume":"101","author":"Taft","year":"1918","journal-title":"Iron Age"},{"issue":"2","key":"10.1016\/j.cie.2023.109223_b21","doi-asserted-by":"crossref","first-page":"688","DOI":"10.1109\/TR.2017.2785978","article-title":"Bayesian approach for two-phase degradation data based on change-point Wiener process with measurement errors","volume":"67","author":"Wang","year":"2018","journal-title":"IEEE Transactions on Reliability"},{"issue":"1","key":"10.1016\/j.cie.2023.109223_b22","doi-asserted-by":"crossref","first-page":"132","DOI":"10.1109\/TR.2010.2040776","article-title":"Bayesian analysis of hazard rate, change point, and cost-optimal burn-in time for electronic devices","volume":"59","author":"Yuan","year":"2010","journal-title":"IEEE Transactions on Reliability"}],"container-title":["Computers &amp; Industrial Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0360835223002474?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0360835223002474?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2025,10,6]],"date-time":"2025-10-06T19:03:38Z","timestamp":1759777418000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0360835223002474"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,5]]},"references-count":22,"alternative-id":["S0360835223002474"],"URL":"https:\/\/doi.org\/10.1016\/j.cie.2023.109223","relation":{},"ISSN":["0360-8352"],"issn-type":[{"value":"0360-8352","type":"print"}],"subject":[],"published":{"date-parts":[[2023,5]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"An integrated optimization of lot-sizing and condition-based maintenance policy of a two-stage deteriorating system","name":"articletitle","label":"Article Title"},{"value":"Computers & Industrial Engineering","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.cie.2023.109223","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"\u00a9 2023 Elsevier Ltd. All rights reserved.","name":"copyright","label":"Copyright"}],"article-number":"109223"}}