{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,28]],"date-time":"2026-02-28T20:02:23Z","timestamp":1772308943732,"version":"3.50.1"},"reference-count":51,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2026,4,1]],"date-time":"2026-04-01T00:00:00Z","timestamp":1775001600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2026,4,1]],"date-time":"2026-04-01T00:00:00Z","timestamp":1775001600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/legal\/tdmrep-license"},{"start":{"date-parts":[[2026,2,2]],"date-time":"2026-02-02T00:00:00Z","timestamp":1769990400000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0\/"}],"funder":[{"DOI":"10.13039\/501100000038","name":"Natural Sciences and Engineering Research Council of Canada","doi-asserted-by":"publisher","award":["RGPIN-2023-03291"],"award-info":[{"award-number":["RGPIN-2023-03291"]}],"id":[{"id":"10.13039\/501100000038","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Computers &amp; Industrial Engineering"],"published-print":{"date-parts":[[2026,4]]},"DOI":"10.1016\/j.cie.2026.111865","type":"journal-article","created":{"date-parts":[[2026,2,2]],"date-time":"2026-02-02T07:13:42Z","timestamp":1770016422000},"page":"111865","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":0,"special_numbering":"C","title":["Integrated flexible production scheduling and vehicle routing with MLOR constraints: A hybrid metaheuristic approach"],"prefix":"10.1016","volume":"214","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-7541-2339","authenticated-orcid":false,"given":"Mohammad","family":"Kaviyani-Charati","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0002-7717-7686","authenticated-orcid":false,"given":"Fantahun M.","family":"Defersha","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/j.cie.2026.111865_b1","doi-asserted-by":"crossref","DOI":"10.1016\/j.engappai.2021.104373","article-title":"A new efficient biased random key genetic algorithm for open shop scheduling with routing by capacitated single vehicle and makespan minimization","volume":"104","author":"Abreu","year":"2021","journal-title":"Engineering Applications of Artificial Intelligence"},{"issue":"2","key":"10.1016\/j.cie.2026.111865_b2","doi-asserted-by":"crossref","first-page":"258","DOI":"10.1111\/poms.12417","article-title":"Customer-base concentration and inventory efficiencies: Evidence from the manufacturing sector","volume":"25","author":"Ak","year":"2016","journal-title":"Production and Operations Management"},{"issue":"3","key":"10.1016\/j.cie.2026.111865_b3","doi-asserted-by":"crossref","first-page":"1261","DOI":"10.1287\/msom.2021.1044","article-title":"Om forum\u2014reducing food waste: An operations management research agenda","volume":"24","author":"Akka\u015f","year":"2022","journal-title":"Manufacturing & Service Operations Management"},{"issue":"3","key":"10.1016\/j.cie.2026.111865_b4","doi-asserted-by":"crossref","first-page":"1611","DOI":"10.1287\/msom.2021.1018","article-title":"Shipment policies for products with fixed shelf lives: Impact on profits and waste","volume":"24","author":"Akka\u015f","year":"2022","journal-title":"Manufacturing & Service Operations Management"},{"issue":"7","key":"10.1016\/j.cie.2026.111865_b5","doi-asserted-by":"crossref","first-page":"2173","DOI":"10.1111\/poms.13963","article-title":"Determining maximum shipping age requirements for shelf life and food waste management","volume":"32","author":"Akkas","year":"2023","journal-title":"Production and Operations Management"},{"issue":"2","key":"10.1016\/j.cie.2026.111865_b6","doi-asserted-by":"crossref","first-page":"468","DOI":"10.1016\/j.ejor.2024.03.039","article-title":"Home chemotherapy delivery: An integrated production scheduling and multi-trip vehicle routing problem","volume":"317","author":"Arda","year":"2024","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"10.1016\/j.cie.2026.111865_b7","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2022.12.036","article-title":"A review on integrated scheduling and outbound vehicle routing problems","volume":"311","author":"Berghman","year":"2023","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.cie.2026.111865_b8","series-title":"Parallel problem solving from nature\u2014PPSN IV: International conference on evolutionary computation\u2014The 4th international conference on parallel problem solving from nature, 1996 proceedings 4","first-page":"310","article-title":"On permutation representations for scheduling problems","author":"Bierwirth","year":"1996"},{"issue":"8","key":"10.1016\/j.cie.2026.111865_b9","doi-asserted-by":"crossref","first-page":"2924","DOI":"10.1080\/00207543.2018.1442945","article-title":"The link between industry 4.0 and lean manufacturing: Mapping current research and establishing a research agenda","volume":"56","author":"Buer","year":"2018","journal-title":"International Journal of Production Research"},{"issue":"3","key":"10.1016\/j.cie.2026.111865_b10","doi-asserted-by":"crossref","first-page":"369","DOI":"10.1287\/trsc.1030.0046","article-title":"Efficient insertion heuristics for vehicle routing and scheduling problems","volume":"38","author":"Campbell","year":"2004","journal-title":"Transportation Science"},{"key":"10.1016\/j.cie.2026.111865_b11","doi-asserted-by":"crossref","first-page":"603","DOI":"10.1007\/s10551-015-2809-8","article-title":"Supply chain strategies and carbon intensity: The roles of process leanness, diversification strategy, and outsourcing","volume":"143","author":"Chen","year":"2017","journal-title":"Journal of Business Ethics"},{"issue":"2","key":"10.1016\/j.cie.2026.111865_b12","doi-asserted-by":"crossref","first-page":"571","DOI":"10.1016\/j.ejor.2021.02.012","article-title":"Solving an integrated scheduling and routing problem with inventory, routing and penalty costs","volume":"294","author":"Chevroton","year":"2021","journal-title":"European Journal of Operational Research"},{"issue":"9","key":"10.1016\/j.cie.2026.111865_b13","doi-asserted-by":"crossref","first-page":"2338","DOI":"10.1111\/poms.13055","article-title":"Examining the link between retailer inventory leanness and operational efficiency: Moderating roles of firm size and demand uncertainty","volume":"28","author":"Chuang","year":"2019","journal-title":"Production and Operations Management"},{"key":"10.1016\/j.cie.2026.111865_b14","doi-asserted-by":"crossref","first-page":"195","DOI":"10.1016\/j.jmsy.2017.04.001","article-title":"A mathematical model and a parallel multiple search path simulated annealing for an integrated distributed layout design and machine cell formation","volume":"43","author":"Defersha","year":"2017","journal-title":"Journal of Manufacturing Systems"},{"key":"10.1016\/j.cie.2026.111865_b15","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2022.108487","article-title":"Mathematical model and simulated annealing algorithm for setup operator constrained flexible job shop scheduling problem","volume":"171","author":"Defersha","year":"2022","journal-title":"Computers & Industrial Engineering"},{"key":"10.1016\/j.cie.2026.111865_b16","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2020.106605","article-title":"An efficient two-stage genetic algorithm for a flexible job-shop scheduling problem with sequence dependent attached\/detached setup, machine release date and lag-time","volume":"147","author":"Defersha","year":"2020","journal-title":"Computers & Industrial Engineering"},{"issue":"20","key":"10.1016\/j.cie.2026.111865_b17","doi-asserted-by":"crossref","first-page":"5942","DOI":"10.1080\/00207543.2017.1308572","article-title":"Integrated production scheduling and vehicle routing problem with job splitting and delivery time windows","volume":"55","author":"Fu","year":"2017","journal-title":"International Journal of Production Research"},{"key":"10.1016\/j.cie.2026.111865_b18","doi-asserted-by":"crossref","DOI":"10.1016\/j.asoc.2024.111943","article-title":"Integrated scheduling of multi-constraint open shop and vehicle routing: Mathematical model and learning-driven brain storm optimization algorithm","volume":"163","author":"Fu","year":"2024","journal-title":"Applied Soft Computing"},{"issue":"2","key":"10.1016\/j.cie.2026.111865_b19","doi-asserted-by":"crossref","first-page":"147","DOI":"10.1002\/j.1538-7305.1950.tb00463.x","article-title":"Error detecting and error correcting codes","volume":"29","author":"Hamming","year":"1950","journal-title":"Bell System Technical Journal"},{"key":"10.1016\/j.cie.2026.111865_b20","doi-asserted-by":"crossref","DOI":"10.1016\/j.cor.2023.106346","article-title":"A hybrid collaborative framework for integrated production scheduling and vehicle routing problem with batch manufacturing and soft time windows","volume":"159","author":"Huang","year":"2023","journal-title":"Computers & Operations Research"},{"issue":"8","key":"10.1016\/j.cie.2026.111865_b21","doi-asserted-by":"crossref","first-page":"857","DOI":"10.1016\/0305-0548(94)00073-H","article-title":"A genetic algorithm for job sequencing problems with distinct due dates and general early-tardy penalty weights","volume":"22","author":"Lee","year":"1995","journal-title":"Computers & Operations Research"},{"issue":"2","key":"10.1016\/j.cie.2026.111865_b22","doi-asserted-by":"crossref","first-page":"461","DOI":"10.1016\/j.ejor.2013.12.024","article-title":"The nuclear medicine production and delivery problem","volume":"236","author":"Lee","year":"2014","journal-title":"European Journal of Operational Research"},{"issue":"10","key":"10.1016\/j.cie.2026.111865_b23","doi-asserted-by":"crossref","first-page":"993","DOI":"10.1109\/71.539732","article-title":"Synchronous and asynchronous parallel simulated annealing with multiple markov chains","volume":"7","author":"Lee","year":"1996","journal-title":"IEEE Transactions on Parallel and Distributed Systems"},{"key":"10.1016\/j.cie.2026.111865_b24","doi-asserted-by":"crossref","first-page":"199","DOI":"10.1016\/j.jmsy.2020.02.001","article-title":"Designing a closed-loop supply chain network for citrus fruits crates considering environmental and economic issues","volume":"55","author":"Liao","year":"2020","journal-title":"Journal of Manufacturing Systems"},{"issue":"21","key":"10.1016\/j.cie.2026.111865_b25","doi-asserted-by":"crossref","first-page":"6615","DOI":"10.1080\/00207543.2020.1821927","article-title":"A hybrid multi-level optimisation framework for integrated production scheduling and vehicle routing with flexible departure time","volume":"59","author":"Liu","year":"2021","journal-title":"International Journal of Production Research"},{"issue":"3","key":"10.1016\/j.cie.2026.111865_b26","doi-asserted-by":"crossref","first-page":"722","DOI":"10.1080\/00207543.2018.1481301","article-title":"Integrated multi-factory production and distribution scheduling applying vehicle routing approach","volume":"57","author":"Marandi","year":"2019","journal-title":"International Journal of Production Research"},{"issue":"1\u20132","key":"10.1016\/j.cie.2026.111865_b27","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1016\/j.ijpe.2006.12.035","article-title":"An empirical analysis of just-in-time production in Japanese manufacturing companies","volume":"108","author":"Matsui","year":"2007","journal-title":"International Journal of Production Economics"},{"issue":"3","key":"10.1016\/j.cie.2026.111865_b28","doi-asserted-by":"crossref","first-page":"616","DOI":"10.1016\/S0377-2217(03)00016-X","article-title":"An efficient genetic algorithm for job shop scheduling with tardiness objectives","volume":"155","author":"Mattfeld","year":"2004","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"10.1016\/j.cie.2026.111865_b29","first-page":"193","article-title":"Genetic algorithms, tournament selection, and the effects of noise","volume":"9","author":"Miller","year":"1995","journal-title":"Complex Systems"},{"key":"10.1016\/j.cie.2026.111865_b30","doi-asserted-by":"crossref","DOI":"10.1016\/j.ejor.2024.12.039","article-title":"Coordinate or collaborate? Reducing food waste in perishable-product supply chains","author":"Mohamadi","year":"2025","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.cie.2026.111865_b31","doi-asserted-by":"crossref","first-page":"347","DOI":"10.1016\/j.ijpe.2019.05.017","article-title":"An integrated production scheduling and delivery route planning with multi-purpose machines: A case study from a furniture manufacturing company","volume":"219","author":"Mohammadi","year":"2020","journal-title":"International Journal of Production Economics"},{"issue":"3","key":"10.1016\/j.cie.2026.111865_b32","doi-asserted-by":"crossref","first-page":"846","DOI":"10.1016\/j.ejor.2019.03.022","article-title":"Working capital optimization in a supply chain perspective","volume":"277","author":"Peng","year":"2019","journal-title":"European Journal of Operational Research"},{"issue":"12","key":"10.1016\/j.cie.2026.111865_b33","doi-asserted-by":"crossref","first-page":"1985","DOI":"10.1016\/S0305-0548(03)00158-8","article-title":"A simple and effective evolutionary algorithm for the vehicle routing problem","volume":"31","author":"Prins","year":"2004","journal-title":"Computers & Operations Research"},{"key":"10.1016\/j.cie.2026.111865_b34","doi-asserted-by":"crossref","DOI":"10.1016\/j.cor.2022.106127","article-title":"An improved memetic algorithm for integrated production scheduling and vehicle routing decisions","volume":"152","author":"Qiu","year":"2023","journal-title":"Computers & Operations Research"},{"key":"10.1016\/j.cie.2026.111865_b35","doi-asserted-by":"crossref","DOI":"10.1016\/j.omega.2022.102691","article-title":"On the impact of adjusting the minimum life on receipt (mlor) criterion in food supply chains","volume":"112","author":"Santos","year":"2022","journal-title":"Omega"},{"issue":"2","key":"10.1016\/j.cie.2026.111865_b36","doi-asserted-by":"crossref","first-page":"206","DOI":"10.1287\/msom.1060.0138","article-title":"Production and transportation integration for a make-to-order manufacturing company with a commit-to-delivery business mode","volume":"9","author":"Stecke","year":"2007","journal-title":"Manufacturing & Service Operations Management"},{"key":"10.1016\/j.cie.2026.111865_b37","doi-asserted-by":"crossref","DOI":"10.1016\/j.cor.2024.106659","article-title":"Iterated variable neighborhood search for integrated scheduling of additive manufacturing and multi-trip vehicle routing problem","volume":"167","author":"Sugianto","year":"2024","journal-title":"Computers & Operations Research"},{"key":"10.1016\/j.cie.2026.111865_b38","series-title":"Introduction to quality engineering: Designing quality into products and processes","author":"Taguchi","year":"1886"},{"issue":"3","key":"10.1016\/j.cie.2026.111865_b39","doi-asserted-by":"crossref","first-page":"493","DOI":"10.1287\/ijoc.2018.0842","article-title":"Integrated scheduling of production and two-stage delivery of make-to-order products: Offline and online algorithms","volume":"31","author":"Tang","year":"2019","journal-title":"INFORMS Journal on Computing"},{"issue":"1","key":"10.1016\/j.cie.2026.111865_b40","doi-asserted-by":"crossref","first-page":"152","DOI":"10.1016\/j.ejor.2012.11.049","article-title":"Integrated machine scheduling and vehicle routing with time windows","volume":"227","author":"Ullrich","year":"2013","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"10.1016\/j.cie.2026.111865_b41","doi-asserted-by":"crossref","first-page":"611","DOI":"10.1287\/opre.1120.1048","article-title":"A hybrid genetic algorithm for multidepot and periodic vehicle routing problems","volume":"60","author":"Vidal","year":"2012","journal-title":"Operations Research"},{"key":"10.1016\/j.cie.2026.111865_b42","doi-asserted-by":"crossref","first-page":"6","DOI":"10.1016\/j.cie.2016.01.018","article-title":"Open vehicle routing problem with cross-docking","volume":"94","author":"Vincent","year":"2016","journal-title":"Computers & Industrial Engineering"},{"key":"10.1016\/j.cie.2026.111865_b43","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.cor.2018.10.011","article-title":"Integrated production and multiple trips vehicle routing with time windows and uncertain travel times","volume":"103","author":"Wang","year":"2019","journal-title":"Computers & Operations Research"},{"issue":"3","key":"10.1016\/j.cie.2026.111865_b44","doi-asserted-by":"crossref","first-page":"843","DOI":"10.1016\/j.ejor.2017.08.035","article-title":"A simulated annealing algorithm for the capacitated vehicle routing problem with two-dimensional loading constraints","volume":"265","author":"Wei","year":"2018","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.cie.2026.111865_b45","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2021.107649","article-title":"Multi-trip heterogeneous vehicle routing problem coordinated with production scheduling: Memetic algorithm and simulated annealing approaches","volume":"161","author":"Ya\u011fmur","year":"2021","journal-title":"Computers & Industrial Engineering"},{"issue":"3","key":"10.1016\/j.cie.2026.111865_b46","doi-asserted-by":"crossref","first-page":"774","DOI":"10.1080\/00207543.2021.2017054","article-title":"Bi-objective coordinated production and transportation scheduling problem with sustainability: Formulation and solution approaches","volume":"61","author":"Ya\u011fmur","year":"2023","journal-title":"International Journal of Production Research"},{"key":"10.1016\/j.cie.2026.111865_b47","doi-asserted-by":"crossref","DOI":"10.1016\/j.eswa.2023.121586","article-title":"Integrated production scheduling and vehicle routing problem with energy efficient strategies: Mathematical formulation and metaheuristic algorithms","volume":"237","author":"Ya\u011fmur","year":"2024","journal-title":"Expert Systems with Applications"},{"key":"10.1016\/j.cie.2026.111865_b48","doi-asserted-by":"crossref","DOI":"10.1016\/j.ijpe.2020.107878","article-title":"Achieving a just\u2013in\u2013time supply chain: The role of supply chain intelligence","volume":"231","author":"Yang","year":"2021","journal-title":"International Journal of Production Economics"},{"key":"10.1016\/j.cie.2026.111865_b49","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1080\/00207543.2024.2408671","article-title":"A self-adaptive gaussian mutation-based arithmetic optimiser algorithm for integrated production scheduling and vehicle routing problem in the distributed manufacturing environment","author":"Zhang","year":"2024","journal-title":"International Journal of Production Research"},{"issue":"6","key":"10.1016\/j.cie.2026.111865_b50","doi-asserted-by":"crossref","first-page":"1922","DOI":"10.1080\/00207543.2020.1824085","article-title":"The applications of industry 4.0 technologies in manufacturing context: A systematic literature review","volume":"59","author":"Zheng","year":"2021","journal-title":"International Journal of Production Research"},{"issue":"15","key":"10.1016\/j.cie.2026.111865_b51","doi-asserted-by":"crossref","first-page":"5005","DOI":"10.1080\/00207543.2017.1378955","article-title":"A coordinated algorithm for integrated production scheduling and vehicle routing problem","volume":"56","author":"Zou","year":"2018","journal-title":"International Journal of Production Research"}],"container-title":["Computers &amp; Industrial Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0360835226000665?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0360835226000665?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2026,2,28]],"date-time":"2026-02-28T19:31:06Z","timestamp":1772307066000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0360835226000665"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2026,4]]},"references-count":51,"alternative-id":["S0360835226000665"],"URL":"https:\/\/doi.org\/10.1016\/j.cie.2026.111865","relation":{},"ISSN":["0360-8352"],"issn-type":[{"value":"0360-8352","type":"print"}],"subject":[],"published":{"date-parts":[[2026,4]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Integrated flexible production scheduling and vehicle routing with MLOR constraints: A hybrid metaheuristic approach","name":"articletitle","label":"Article Title"},{"value":"Computers & Industrial Engineering","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.cie.2026.111865","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"\u00a9 2026 The Authors. Published by Elsevier Ltd.","name":"copyright","label":"Copyright"}],"article-number":"111865"}}