{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,7,3]],"date-time":"2026-07-03T01:21:11Z","timestamp":1783041671059,"version":"3.54.6"},"reference-count":55,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2026,7,1]],"date-time":"2026-07-01T00:00:00Z","timestamp":1782864000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2026,7,1]],"date-time":"2026-07-01T00:00:00Z","timestamp":1782864000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/legal\/tdmrep-license"},{"start":{"date-parts":[[2026,7,1]],"date-time":"2026-07-01T00:00:00Z","timestamp":1782864000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-017"},{"start":{"date-parts":[[2026,7,1]],"date-time":"2026-07-01T00:00:00Z","timestamp":1782864000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"},{"start":{"date-parts":[[2026,7,1]],"date-time":"2026-07-01T00:00:00Z","timestamp":1782864000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-012"},{"start":{"date-parts":[[2026,7,1]],"date-time":"2026-07-01T00:00:00Z","timestamp":1782864000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2026,7,1]],"date-time":"2026-07-01T00:00:00Z","timestamp":1782864000000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-004"}],"funder":[{"DOI":"10.13039\/501100008521","name":"Beijing University of Civil Engineering and Architecture","doi-asserted-by":"publisher","award":["06082725003"],"award-info":[{"award-number":["06082725003"]}],"id":[{"id":"10.13039\/501100008521","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Computers &amp; Industrial Engineering"],"published-print":{"date-parts":[[2026,7]]},"DOI":"10.1016\/j.cie.2026.112091","type":"journal-article","created":{"date-parts":[[2026,5,5]],"date-time":"2026-05-05T15:44:57Z","timestamp":1777995897000},"page":"112091","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":0,"special_numbering":"C","title":["Modeling and solution for novel energy-aware three-stages heterogeneous flexible-job-type remanufacturing system scheduling problem considering type-II disassembly\/assembly line balancing"],"prefix":"10.1016","volume":"217","author":[{"given":"Zhongwei","family":"Huang","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Mingzhi","family":"Yang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Honghao","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Xuesong","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-3148-2404","authenticated-orcid":false,"given":"Duc Truong","family":"Pham","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-1547-5503","authenticated-orcid":false,"given":"Zhiwu","family":"Li","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Guangdong","family":"Tian","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"78","reference":[{"issue":"1","key":"10.1016\/j.cie.2026.112091_b0005","doi-asserted-by":"crossref","first-page":"427","DOI":"10.1007\/s11831-021-09580-z","article-title":"A state-of-the-art review on meta-heuristics application in remanufacturing","volume":"29","author":"Ansari","year":"2022","journal-title":"Archives of Computational Methods in Engineering"},{"issue":"1","key":"10.1016\/j.cie.2026.112091_b0010","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1007\/s10479-024-06329-2","article-title":"Parallel shifting bottleneck algorithms for non-permutation flow shop scheduling","volume":"343","author":"Badri","year":"2024","journal-title":"Annals of Operations Research"},{"issue":"6\u20137","key":"10.1016\/j.cie.2026.112091_b0015","doi-asserted-by":"crossref","first-page":"851","DOI":"10.1177\/09544054231189012","article-title":"Optimal assembly sequence planning with tool uncertainties","volume":"238","author":"Champatiray","year":"2024","journal-title":"Proceedings of the Institution of Mechanical Engineers Part B-Journal of Engineering Manufacture"},{"issue":"12","key":"10.1016\/j.cie.2026.112091_b0020","doi-asserted-by":"crossref","first-page":"4478","DOI":"10.1080\/00207543.2025.2452385","article-title":"Human-robot cooperation two-sided partial disassembly line balancing problem","volume":"63","author":"Chu","year":"2025","journal-title":"International Journal of Production Research"},{"key":"10.1016\/j.cie.2026.112091_b0025","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2024.110419","article-title":"Multi-objective sustainable flexible job shop scheduling problem: Balancing economic, ecological, and social criteria","volume":"195","author":"Destouet","year":"2024","journal-title":"Computers & Industrial Engineering"},{"key":"10.1016\/j.cie.2026.112091_b0030","doi-asserted-by":"crossref","DOI":"10.1016\/j.aei.2025.103827","article-title":"A hybrid metaheuristic for joint decision-making in remanufacturing-integrated operation and maintenance of complex manufacturing systems","volume":"69","author":"Ding","year":"2026","journal-title":"Advanced Engineering Informatics"},{"key":"10.1016\/j.cie.2026.112091_b0035","doi-asserted-by":"crossref","first-page":"298","DOI":"10.1016\/j.jmsy.2021.05.018","article-title":"A hybrid Jaya algorithm for solving flexible job shop scheduling problem considering multiple critical paths","volume":"60","author":"Fan","year":"2021","journal-title":"Journal of Manufacturing Systems"},{"issue":"12","key":"10.1016\/j.cie.2026.112091_b0040","doi-asserted-by":"crossref","first-page":"2018","DOI":"10.1080\/0305215X.2023.2296538","article-title":"Integrated remanufacturing scheduling of disassembly, reprocessing and reassembly considering energy efficiency and stochasticity through group teaching optimization and simulation approaches","volume":"56","author":"Fu","year":"2024","journal-title":"Engineering Optimization"},{"issue":"12","key":"10.1016\/j.cie.2026.112091_b0045","doi-asserted-by":"crossref","first-page":"2018","DOI":"10.1080\/0305215X.2023.2296538","article-title":"Integrated remanufacturing scheduling of disassembly, reprocessing and reassembly considering energy efficiency and stochasticity through group teaching optimization and simulation approaches","volume":"56","author":"Fu","year":"2024","journal-title":"Engineering Optimization"},{"key":"10.1016\/j.cie.2026.112091_b0050","doi-asserted-by":"crossref","DOI":"10.1016\/j.jclepro.2020.123364","article-title":"Stochastic multi-objective integrated disassembly-reprocessing-reassembly scheduling via fruit fly optimization algorithm","volume":"278","author":"Fu","year":"2021","journal-title":"Journal of Cleaner Production"},{"key":"10.1016\/j.cie.2026.112091_b0055","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.knosys.2016.06.014","article-title":"Artificial bee colony algorithm for scheduling and rescheduling fuzzy flexible job shop problem with new job insertion","volume":"109","author":"Gao","year":"2016","journal-title":"Knowledge-Based Systems"},{"key":"10.1016\/j.cie.2026.112091_b0060","doi-asserted-by":"crossref","first-page":"624","DOI":"10.1016\/j.jclepro.2017.01.166","article-title":"Integrated lot sizing and energy-efficient job shop scheduling problem in manufacturing\/remanufacturing systems","volume":"148","author":"Giglio","year":"2017","journal-title":"Journal of Cleaner Production"},{"key":"10.1016\/j.cie.2026.112091_b0065","doi-asserted-by":"crossref","DOI":"10.1016\/j.jclepro.2024.142916","article-title":"A multi-objective integrated scheduling of remanufacturing system considering time window constrained outsourcing option","volume":"468","author":"Guo","year":"2024","journal-title":"Journal of Cleaner Production"},{"key":"10.1016\/j.cie.2026.112091_b0070","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2023.109419","article-title":"Integrated scheduling for remanufacturing system considering component commonality using improved multi-objective genetic algorithm","volume":"182","author":"Guo","year":"2023","journal-title":"Computers & Industrial Engineering"},{"issue":"2","key":"10.1016\/j.cie.2026.112091_b0075","doi-asserted-by":"crossref","first-page":"367","DOI":"10.1007\/s11831-017-9247-y","article-title":"Combinatorial optimization: Comparison of heuristic algorithms in travelling salesman problem","volume":"26","author":"Halim","year":"2019","journal-title":"Archives of Computational Methods in Engineering"},{"key":"10.1016\/j.cie.2026.112091_b0080","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2023.109535","article-title":"A multiobjective decision-making approach for modelling and planning economically and environmentally sustainable robotic disassembly for remanufacturing","volume":"184","author":"Hartono","year":"2023","journal-title":"Computers & Industrial Engineering"},{"issue":"8","key":"10.1016\/j.cie.2026.112091_b0085","doi-asserted-by":"crossref","first-page":"1106","DOI":"10.1057\/jors.2013.33","article-title":"Dynamic priority rule-based forward-backward heuristic algorithm for resource levelling problem in construction project","volume":"64","author":"He","year":"2013","journal-title":"Journal of the Operational Research Society"},{"key":"10.1016\/j.cie.2026.112091_b0090","doi-asserted-by":"crossref","first-page":"38","DOI":"10.1016\/j.jmsy.2025.02.004","article-title":"Energy-efficient human-robot collaborative U-shaped disassembly line balancing problem considering turn on-off strategy: Uncertain modeling and solution method","volume":"80","author":"Huang","year":"2025","journal-title":"Journal of Manufacturing Systems"},{"key":"10.1016\/j.cie.2026.112091_b0095","doi-asserted-by":"crossref","DOI":"10.1016\/j.swevo.2025.101990","article-title":"Remanufacturing scheduling under uncertainty considering remanufacturability assessment with adaptive hybrid optimization algorithm","volume":"96","author":"Jin","year":"2025","journal-title":"Swarm and Evolutionary Computation"},{"key":"10.1016\/j.cie.2026.112091_b0100","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2023.109817","article-title":"Remanufacturing system scheduling of batch products with the consideration of dynamic changes in machine efficiency using an improved artificial bee colony algorithm","volume":"187","author":"Jin","year":"2024","journal-title":"Computers & Industrial Engineering"},{"issue":"22","key":"10.1016\/j.cie.2026.112091_b0105","doi-asserted-by":"crossref","first-page":"6236","DOI":"10.1080\/00207543.2011.616231","article-title":"Dynamic disassembly planning for remanufacturing of multiple types of products","volume":"50","author":"Kang","year":"2012","journal-title":"International Journal of Production Research"},{"issue":"9\u201312","key":"10.1016\/j.cie.2026.112091_b0110","doi-asserted-by":"crossref","first-page":"3697","DOI":"10.1007\/s00170-017-0057-z","article-title":"Priority scheduling to minimize the total tardiness for remanufacturing systems with flow-shop-type reprocessing lines","volume":"91","author":"Kim","year":"2017","journal-title":"International Journal of Advanced Manufacturing Technology"},{"key":"10.1016\/j.cie.2026.112091_b0115","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2023.109294","article-title":"Game theory-oriented approach for disassembly line worker assignment and balancing problem with multi-manned workstations","volume":"181","author":"Kose","year":"2023","journal-title":"Computers & Industrial Engineering"},{"issue":"2","key":"10.1016\/j.cie.2026.112091_b0120","doi-asserted-by":"crossref","first-page":"611","DOI":"10.1007\/s11081-019-09465-y","article-title":"Type-E disassembly line balancing problem with multi-manned workstations","volume":"21","author":"Kucukkoc","year":"2020","journal-title":"Optimization and Engineering"},{"issue":"2","key":"10.1016\/j.cie.2026.112091_b0125","doi-asserted-by":"crossref","first-page":"1385","DOI":"10.1007\/s10845-023-02308-9","article-title":"Multi-objective sustainable production planning for a hybrid multi-stage manufacturing-remanufacturing system with grade-based classification of recovered and remanufactured products","volume":"36","author":"Lahmar","year":"2025","journal-title":"Journal of Intelligent Manufacturing"},{"key":"10.1016\/j.cie.2026.112091_b0130","doi-asserted-by":"crossref","DOI":"10.1016\/j.swevo.2025.102045","article-title":"Modelling and optimization of mixed-parallel straight and two-sided disassembly line balancing problem","volume":"97","author":"Liang","year":"2025","journal-title":"Swarm and Evolutionary Computation"},{"issue":"9","key":"10.1016\/j.cie.2026.112091_b0135","doi-asserted-by":"crossref","first-page":"2674","DOI":"10.1080\/00207543.2014.975851","article-title":"Heuristics for integrated job assignment and scheduling in the multi-plant remanufacturing system","volume":"53","author":"Lin","year":"2015","journal-title":"International Journal of Production Research"},{"key":"10.1016\/j.cie.2026.112091_b0140","doi-asserted-by":"crossref","first-page":"132429","DOI":"10.1109\/ACCESS.2021.3114712","article-title":"A new job shop scheduling method for remanufacturing systems using extended artificial bee colony algorithm","volume":"9","author":"Liu","year":"2021","journal-title":"IEEE Access"},{"key":"10.1016\/j.cie.2026.112091_b0145","doi-asserted-by":"crossref","DOI":"10.1016\/j.swevo.2025.102185","article-title":"Scheduling in a three-stage remanufacturing system with machine blockage, deterioration and maintenance using metaheuristic algorithm","volume":"99","author":"Luo","year":"2025","journal-title":"Swarm and Evolutionary Computation"},{"key":"10.1016\/j.cie.2026.112091_b0150","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2023.109282","article-title":"On the development of a smart architecture for a sustainable manufacturing-remanufacturing system: A literature review approach","volume":"180","author":"Mej\u00eda-Moncayo","year":"2023","journal-title":"Computers & Industrial Engineering"},{"key":"10.1016\/j.cie.2026.112091_b0155","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2024.110325","article-title":"Graph reinforcement learning for flexible job shop scheduling under industrial demand response: A production and energy nexus perspective","volume":"193","author":"Rui","year":"2024","journal-title":"Computers & Industrial Engineering"},{"key":"10.1016\/j.cie.2026.112091_b0160","doi-asserted-by":"crossref","DOI":"10.1016\/j.asoc.2021.107349","article-title":"A discrete spotted hyena optimizer for solving distributed job shop scheduling problems","volume":"106","author":"Sahman","year":"2021","journal-title":"Applied Soft Computing"},{"issue":"24","key":"10.1016\/j.cie.2026.112091_b0165","doi-asserted-by":"crossref","first-page":"22303","DOI":"10.1007\/s00521-022-07714-3","article-title":"A multi-neighborhood-based multi-objective memetic algorithm for the energy-efficient distributed flexible flow shop scheduling problem","volume":"34","author":"Shao","year":"2022","journal-title":"Neural Computing & Applications"},{"key":"10.1016\/j.cie.2026.112091_b0170","doi-asserted-by":"crossref","first-page":"94","DOI":"10.1016\/j.jmsy.2020.08.006","article-title":"A new environment-aware scheduling method for remanufacturing system with non-dedicated reprocessing lines using improved flower pollination algorithm","volume":"57","author":"Shi","year":"2020","journal-title":"Journal of Manufacturing Systems"},{"key":"10.1016\/j.cie.2026.112091_b0175","doi-asserted-by":"crossref","DOI":"10.1016\/j.eswa.2023.121309","article-title":"Multi-objective optimization of energy-efficient remanufacturing system scheduling problem with lot-streaming production mode","volume":"237","author":"Tian","year":"2024","journal-title":"Expert Systems with Applications"},{"key":"10.1016\/j.cie.2026.112091_b0180","doi-asserted-by":"crossref","DOI":"10.1016\/j.cor.2023.106456","article-title":"Job-shop scheduling with limited flexible workers considering ergonomic factors using an improved multi-objective discrete Jaya algorithm","volume":"162","author":"Usman","year":"2024","journal-title":"Computers & Operations Research"},{"key":"10.1016\/j.cie.2026.112091_b0185","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2025.111099","article-title":"A batch production scheduling problem in a reconfigurable hybrid manufacturing-remanufacturing system","volume":"204","author":"Vahedi-Nouri","year":"2025","journal-title":"Computers & Industrial Engineering"},{"key":"10.1016\/j.cie.2026.112091_b0190","doi-asserted-by":"crossref","DOI":"10.1016\/j.aei.2024.102401","article-title":"A multi-disjunctive-graph model-based memetic algorithm for the distributed job shop scheduling problem","volume":"60","author":"Wang","year":"2024","journal-title":"Advanced Engineering Informatics"},{"key":"10.1016\/j.cie.2026.112091_b0195","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2024.110379","article-title":"More mixed-integer linear programming models for solving three-stage remanufacturing system scheduling problem","volume":"194","author":"Wang","year":"2024","journal-title":"Computers & Industrial Engineering"},{"key":"10.1016\/j.cie.2026.112091_b0200","doi-asserted-by":"crossref","DOI":"10.1016\/j.rcim.2022.102509","article-title":"A hybrid genetic algorithm with multiple decoding methods for energy-aware remanufacturing system scheduling problem","volume":"81","author":"Wang","year":"2023","journal-title":"Robotics and Computer-Integrated Manufacturing"},{"key":"10.1016\/j.cie.2026.112091_b0205","doi-asserted-by":"crossref","DOI":"10.1016\/j.jclepro.2024.143771","article-title":"Energy-aware remanufacturing process planning and scheduling problem using reinforcement learning-based particle swarm optimization algorithm","volume":"476","author":"Wang","year":"2024","journal-title":"Journal of Cleaner Production"},{"key":"10.1016\/j.cie.2026.112091_b0210","doi-asserted-by":"crossref","first-page":"264","DOI":"10.1016\/j.jmsy.2024.03.005","article-title":"An improved memetic algorithm for multi-objective resource-constrained flexible job shop inverse scheduling problem: An application for machining workshop","volume":"74","author":"Wei","year":"2024","journal-title":"Journal of Manufacturing Systems"},{"key":"10.1016\/j.cie.2026.112091_b0215","doi-asserted-by":"crossref","DOI":"10.1016\/j.swevo.2020.100820","article-title":"A two-stage solution method based on NSGA-II for green multi-objective integrated process planning and scheduling in a battery packaging machinery workshop","volume":"61","author":"Wen","year":"2021","journal-title":"Swarm and Evolutionary Computation"},{"issue":"3","key":"10.1016\/j.cie.2026.112091_b0220","doi-asserted-by":"crossref","first-page":"849","DOI":"10.1007\/s40684-023-00568-7","article-title":"A knowledge graph based disassembly sequence planning for end-of-life power battery","volume":"11","author":"Wu","year":"2024","journal-title":"International Journal of Precision Engineering and Manufacturing-Green Technology"},{"issue":"1","key":"10.1016\/j.cie.2026.112091_b0225","first-page":"2123","article-title":"A new integrated remanufacturing process planning and scheduling model under uncertainties using extended non-dominated sorting genetic algorithm-II","volume":"46","author":"Xu","year":"2024","journal-title":"Journal of Intelligent & Fuzzy Systems"},{"key":"10.1016\/j.cie.2026.112091_b0230","doi-asserted-by":"crossref","DOI":"10.1016\/j.rcim.2022.102506","article-title":"A novel MILP model for job shop scheduling problem with mobile robots","volume":"81","author":"Yao","year":"2023","journal-title":"Robotics and Computer-Integrated Manufacturing"},{"issue":"17","key":"10.1016\/j.cie.2026.112091_b0235","doi-asserted-by":"crossref","first-page":"2734","DOI":"10.3390\/math12172734","article-title":"Unified modeling and multi-objective optimization for disassembly line balancing with distinct station configurations","volume":"12","author":"Yin","year":"2024","journal-title":"Mathematics"},{"key":"10.1016\/j.cie.2026.112091_b0240","doi-asserted-by":"crossref","first-page":"266","DOI":"10.1016\/j.cie.2018.04.048","article-title":"Scheduling algorithms for job-shop-type remanufacturing systems with component matching requirement","volume":"120","author":"Yu","year":"2018","journal-title":"Computers & Industrial Engineering"},{"key":"10.1016\/j.cie.2026.112091_b0245","doi-asserted-by":"crossref","DOI":"10.1016\/j.jii.2024.100676","article-title":"Human-robot collaboration in mixed-flow assembly line balancing under uncertainty: An efficient discrete bees algorithm","volume":"41","author":"Zhang","year":"2024","journal-title":"Journal of Industrial Information Integration"},{"key":"10.1016\/j.cie.2026.112091_b0250","doi-asserted-by":"crossref","DOI":"10.1016\/j.aei.2024.102895","article-title":"Mixed integer programming and multi-objective enhanced differential evolution algorithm for human-robot responsive collaborative disassembly in remanufacturing system","volume":"62","author":"Zhang","year":"2024","journal-title":"Advanced Engineering Informatics"},{"key":"10.1016\/j.cie.2026.112091_b0255","doi-asserted-by":"crossref","DOI":"10.1016\/j.aei.2023.102010","article-title":"An energy-efficient multi-objective integrated process planning and scheduling for a flexible job-shop-type remanufacturing system","volume":"56","author":"Zhang","year":"2023","journal-title":"Advanced Engineering Informatics"},{"key":"10.1016\/j.cie.2026.112091_b0260","doi-asserted-by":"crossref","first-page":"211","DOI":"10.1016\/j.jmsy.2022.12.008","article-title":"An energy-efficient multi-objective scheduling for flexible job-shop-type remanufacturing system","volume":"66","author":"Zhang","year":"2023","journal-title":"Journal of Manufacturing Systems"},{"issue":"4","key":"10.1016\/j.cie.2026.112091_b0265","doi-asserted-by":"crossref","first-page":"474","DOI":"10.1007\/s11465-019-0560-z","article-title":"Energy-aware fuzzy job-shop scheduling for engine remanufacturing at the multi-machine level","volume":"14","author":"Zhao","year":"2019","journal-title":"Frontiers of Mechanical Engineering"},{"issue":"12","key":"10.1016\/j.cie.2026.112091_b0270","doi-asserted-by":"crossref","first-page":"4226","DOI":"10.1080\/00207543.2023.2254858","article-title":"A multi-objective discrete differential evolution algorithm for energy-efficient distributed blocking flow shop scheduling problem","volume":"62","author":"Zhao","year":"2024","journal-title":"International Journal of Production Research"},{"key":"10.1016\/j.cie.2026.112091_b0275","doi-asserted-by":"crossref","DOI":"10.1016\/j.asoc.2021.107717","article-title":"Bi-objective grey wolf optimization algorithm combined Levy flight mechanism for the FMC green scheduling problem","volume":"111","author":"Zhou","year":"2021","journal-title":"Applied Soft Computing"}],"container-title":["Computers &amp; Industrial Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0360835226002925?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0360835226002925?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2026,7,3]],"date-time":"2026-07-03T01:14:56Z","timestamp":1783041296000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0360835226002925"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2026,7]]},"references-count":55,"alternative-id":["S0360835226002925"],"URL":"https:\/\/doi.org\/10.1016\/j.cie.2026.112091","relation":{},"ISSN":["0360-8352"],"issn-type":[{"value":"0360-8352","type":"print"}],"subject":[],"published":{"date-parts":[[2026,7]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Modeling and solution for novel energy-aware three-stages heterogeneous flexible-job-type remanufacturing system scheduling problem considering type-II disassembly\/assembly line balancing","name":"articletitle","label":"Article Title"},{"value":"Computers & Industrial Engineering","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.cie.2026.112091","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"\u00a9 2026 Elsevier Ltd. All rights are reserved, including those for text and data mining, AI training, and similar technologies.","name":"copyright","label":"Copyright"}],"article-number":"112091"}}