{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,10]],"date-time":"2026-10-10T19:50:54Z","timestamp":1791661854213,"version":"4.3.4"},"reference-count":48,"publisher":"Elsevier BV","issue":"1","license":[{"start":{"date-parts":[[2027,1,1]],"date-time":"2027-01-01T00:00:00Z","timestamp":1798761600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2027,1,1]],"date-time":"2027-01-01T00:00:00Z","timestamp":1798761600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/legal\/tdmrep-license"},{"start":{"date-parts":[[2026,8,11]],"date-time":"2026-08-11T00:00:00Z","timestamp":1786406400000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"DOI":"10.13039\/100004421","name":"World Bank Group","doi-asserted-by":"publisher","award":["BR-CCEE-TDR-14-21-PRECO-CS-QBS"],"award-info":[{"award-number":["BR-CCEE-TDR-14-21-PRECO-CS-QBS"]}],"id":[{"id":"10.13039\/100004421","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[2027,1]]},"DOI":"10.1016\/j.ejor.2026.08.005","type":"journal-article","created":{"date-parts":[[2026,8,11]],"date-time":"2026-08-11T06:21:28Z","timestamp":1786429288000},"page":"68-84","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":0,"title":["A causation-based framework for pricing and cost allocation of energy, reserves, and transmission in modern power systems"],"prefix":"10.1016","volume":"336","author":[{"given":"Lu\u00edza","family":"Ribeiro","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-1569-030X","authenticated-orcid":false,"given":"Alexandre","family":"Street","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-9538-6748","authenticated-orcid":false,"given":"Jos\u00e9 M.","family":"Arroyo","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Rodrigo","family":"Moreno","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"78","reference":[{"issue":"3","key":"10.1016\/j.ejor.2026.08.005_b1","doi-asserted-by":"crossref","first-page":"1128","DOI":"10.1109\/59.709110","article-title":"Spot pricing of capacities for generation and transmission of reserve in an extended Poolco model","volume":"13","author":"Aganagic","year":"1998","journal-title":"IEEE Transactions on Power Systems"},{"issue":"2","key":"10.1016\/j.ejor.2026.08.005_b2","doi-asserted-by":"crossref","first-page":"605","DOI":"10.1016\/j.ejor.2024.05.020","article-title":"Solving large-scale electricity market pricing problems in polynomial time","volume":"318","author":"Ahunbay","year":"2024","journal-title":"European Journal of Operational Research"},{"issue":"2","key":"10.1016\/j.ejor.2026.08.005_b3","doi-asserted-by":"crossref","first-page":"634","DOI":"10.1109\/TPWRS.2005.846221","article-title":"Energy and reserve pricing in security and network-constrained electricity markets","volume":"20","author":"Arroyo","year":"2005","journal-title":"IEEE Transactions on Power Systems"},{"key":"10.1016\/j.ejor.2026.08.005_b4","series-title":"Wholesale electricity market design summary","author":"Australian Energy Market Operator (AEMO)","year":"2023"},{"key":"10.1016\/j.ejor.2026.08.005_b5","doi-asserted-by":"crossref","DOI":"10.1016\/j.enpol.2024.114379","article-title":"Who should pay for frequency-containment ancillary services? Making responsible units bear the cost to shape investment in generation and loads","volume":"196","author":"Badesa","year":"2025","journal-title":"Energy Policy"},{"issue":"1","key":"10.1016\/j.ejor.2026.08.005_b6","doi-asserted-by":"crossref","first-page":"12","DOI":"10.1109\/TSTE.2022.3198324","article-title":"Assigning shadow prices to synthetic inertia and frequency response reserves from renewable energy sources","volume":"14","author":"Badesa","year":"2023","journal-title":"IEEE Transactions on Sustainable Energy"},{"key":"10.1016\/j.ejor.2026.08.005_b7","series-title":"Introduction to linear optimization","author":"Bertsimas","year":"1997"},{"key":"10.1016\/j.ejor.2026.08.005_b8","first-page":"EL 41","article-title":"Market design for system security in low-carbon electricity grids: From the physics to the economics","author":"Billimoria","year":"2020","journal-title":"The Oxford Institute for Energy Studies"},{"issue":"4","key":"10.1016\/j.ejor.2026.08.005_b9","doi-asserted-by":"crossref","first-page":"1818","DOI":"10.1109\/TPWRS.2005.857016","article-title":"Market-clearing with stochastic security\u2014Part I: Formulation","volume":"20","author":"Bouffard","year":"2005","journal-title":"IEEE Transactions on Power Systems"},{"issue":"1","key":"10.1016\/j.ejor.2026.08.005_b10","doi-asserted-by":"crossref","first-page":"351","DOI":"10.1016\/j.ejor.2022.07.052","article-title":"Long-run optimal pricing in electricity markets with non-convex costs","volume":"307","author":"Byers","year":"2023","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.ejor.2026.08.005_b11","series-title":"2019 Annual report on market issues & performance","author":"California ISO","year":"2019"},{"key":"10.1016\/j.ejor.2026.08.005_b12","series-title":"Business practice manual for reliability requirements","author":"California ISO","year":"2025"},{"issue":"2","key":"10.1016\/j.ejor.2026.08.005_b13","doi-asserted-by":"crossref","first-page":"537","DOI":"10.1109\/TPWRS.2013.2284791","article-title":"Incorporating post zonal reserve deployment transmission constraints into energy and ancillary service co-optimization","volume":"29","author":"Chen","year":"2014","journal-title":"IEEE Transactions on Power Systems"},{"key":"10.1016\/j.ejor.2026.08.005_b14","series-title":"Modern optimisation techniques in power systems","first-page":"173","article-title":"Lagrangian relaxation applications to electric power operations and planning problems","author":"Conejo","year":"1999"},{"key":"10.1016\/j.ejor.2026.08.005_b15","series-title":"Capacity allocation and congestion management","author":"European Union Agency for the Cooperation of Energy Regulators (ACER)","year":"2026"},{"key":"10.1016\/j.ejor.2026.08.005_b16","series-title":"Recent ISO software enhancements and future software and modeling plans","author":"Federal Energy Regulatory Commission (FERC)","year":"2011"},{"issue":"12","key":"10.1016\/j.ejor.2026.08.005_b17","doi-asserted-by":"crossref","first-page":"1172","DOI":"10.1080\/0740817X.2016.1189626","article-title":"An introduction to optimal power flow: Theory, formulation, and examples","volume":"48","author":"Frank","year":"2016","journal-title":"IIE Transactions"},{"issue":"11","key":"10.1016\/j.ejor.2026.08.005_b18","doi-asserted-by":"crossref","first-page":"1970","DOI":"10.1109\/JPROC.2005.857492","article-title":"Scheduling and pricing of coupled energy and primary, secondary, and tertiary reserves","volume":"93","author":"Galiana","year":"2005","journal-title":"Proceedings of the IEEE"},{"issue":"1","key":"10.1016\/j.ejor.2026.08.005_b19","doi-asserted-by":"crossref","first-page":"53","DOI":"10.1109\/TPWRS.2002.807052","article-title":"Energy and reserve market designs with explicit consideration to lost opportunity costs","volume":"18","author":"Gan","year":"2003","journal-title":"IEEE Transactions on Power Systems"},{"issue":"1","key":"10.1016\/j.ejor.2026.08.005_b20","doi-asserted-by":"crossref","first-page":"280","DOI":"10.1109\/TPWRS.2011.2163949","article-title":"Towards full integration of demand-side resources in joint forward energy\/reserve electricity markets","volume":"27","author":"Karangelos","year":"2012","journal-title":"IEEE Transactions on Power Systems"},{"issue":"1","key":"10.1016\/j.ejor.2026.08.005_b21","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2025.05.022","article-title":"Fifty years of power systems optimization","volume":"329","author":"Kaya","year":"2026","journal-title":"European Journal of Operational Research"},{"issue":"10","key":"10.1016\/j.ejor.2026.08.005_b22","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1016\/j.tej.2003.09.009","article-title":"Allocating the costs of contingency reserves","volume":"16","author":"Kirby","year":"2003","journal-title":"The Electricity Journal"},{"key":"10.1016\/j.ejor.2026.08.005_b23","series-title":"Fundamentals of power system economics","author":"Kirschen","year":"2019"},{"issue":"6","key":"10.1016\/j.ejor.2026.08.005_b24","doi-asserted-by":"crossref","first-page":"4503","DOI":"10.1109\/TPWRS.2019.2922881","article-title":"Enhanced energy management system with corrective transmission switching strategy\u2014Part II: Results and discussion","volume":"34","author":"Li","year":"2019","journal-title":"IEEE Transactions on Power Systems"},{"key":"10.1016\/j.ejor.2026.08.005_b25","doi-asserted-by":"crossref","unstructured":"Liu, S., Xiang, M., Yu, S., & Yang, Z. (2023). Cost Allocation for Frequency Regulation Mileage Based on Contributions to System Power Unbalance. In 2023 IEEE 6th International Electrical and Energy Conference (pp. 1703\u20131707). Hefei, China: http:\/\/dx.doi.org\/10.1109\/CIEEC58067.2023.10166726.","DOI":"10.1109\/CIEEC58067.2023.10166726"},{"key":"10.1016\/j.ejor.2026.08.005_b26","doi-asserted-by":"crossref","DOI":"10.1016\/j.epsr.2023.109858","article-title":"Stochastic risk-averse energy and reserve scheduling and pricing schemes with non-convexities and revenue caps","volume":"225","author":"Martin","year":"2023","journal-title":"Electric Power Systems Research"},{"issue":"3","key":"10.1016\/j.ejor.2026.08.005_b27","doi-asserted-by":"crossref","first-page":"328","DOI":"10.1109\/TEMPR.2024.3355291","article-title":"Cost allocation for inertia and frequency response ancillary services","volume":"2","author":"Matamala","year":"2024","journal-title":"IEEE Transactions on Energy Markets, Policy, and Regulation"},{"key":"10.1016\/j.ejor.2026.08.005_b28","series-title":"Case300: IEEE 300-bus power flow test case","author":"Matpower","year":"2026"},{"issue":"2","key":"10.1016\/j.ejor.2026.08.005_b29","doi-asserted-by":"crossref","first-page":"712","DOI":"10.1016\/j.ejor.2020.07.026","article-title":"Investment effects of pricing schemes for non-convex markets","volume":"289","author":"Mays","year":"2021","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"10.1016\/j.ejor.2026.08.005_b30","doi-asserted-by":"crossref","first-page":"1366","DOI":"10.1109\/TPWRS.2011.2182622","article-title":"Pricing electricity in pools with wind producers","volume":"27","author":"Morales","year":"2012","journal-title":"IEEE Transactions on Power Systems"},{"key":"10.1016\/j.ejor.2026.08.005_b31","series-title":"Manual 04: Installed capacity manual","author":"New York ISO","year":"2026"},{"key":"10.1016\/j.ejor.2026.08.005_b32","series-title":"Reliability standards for the bulk electric systems of North America","author":"North American Electric Reliability Corporation (NERC)","year":"2026"},{"issue":"4","key":"10.1016\/j.ejor.2026.08.005_b33","doi-asserted-by":"crossref","first-page":"3308","DOI":"10.1109\/TPWRS.2016.2614891","article-title":"Dual pricing algorithm in ISO markets","volume":"32","author":"O\u2019Neill","year":"2017","journal-title":"IEEE Transactions on Power Systems"},{"issue":"1","key":"10.1016\/j.ejor.2026.08.005_b34","doi-asserted-by":"crossref","first-page":"269","DOI":"10.1016\/j.ejor.2003.12.011","article-title":"Efficient market-clearing prices in markets with nonconvexities","volume":"164","author":"O\u2019Neill","year":"2005","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/j.ejor.2026.08.005_b35","series-title":"PJM manual 11: Energy & ancillary services market operations","author":"PJM Interconnection, L.L.C.","year":"2025"},{"key":"10.1016\/j.ejor.2026.08.005_b36","series-title":"Pricing of energy and reserves in electricity markets with endogenously defined reserve requirements: 300-bus case study data","author":"Ribeiro","year":"2025"},{"key":"10.1016\/j.ejor.2026.08.005_b37","doi-asserted-by":"crossref","DOI":"10.1016\/j.epsr.2023.109364","article-title":"Technical and economical aspects of wholesale electricity markets: An international comparison and main contributions for improvements in Brazil","volume":"220","author":"Ribeiro","year":"2023","journal-title":"Electric Power Systems Research"},{"key":"10.1016\/j.ejor.2026.08.005_b38","doi-asserted-by":"crossref","DOI":"10.1016\/j.epsr.2022.108725","article-title":"Power systems optimization under uncertainty: A review of methods and applications","volume":"214","author":"Roald","year":"2023","journal-title":"Electric Power Systems Research"},{"key":"10.1016\/j.ejor.2026.08.005_b39","series-title":"Spot pricing of electricity","author":"Schweppe","year":"1988"},{"issue":"1","key":"10.1016\/j.ejor.2026.08.005_b40","doi-asserted-by":"crossref","first-page":"411","DOI":"10.1109\/TPWRS.2022.3165635","article-title":"A scenario-oriented approach to energy-reserve joint procurement and pricing","volume":"38","author":"Shi","year":"2023","journal-title":"IEEE Transactions on Power Systems"},{"issue":"8","key":"10.1016\/j.ejor.2026.08.005_b41","doi-asserted-by":"crossref","first-page":"32","DOI":"10.1016\/S1040-6190(00)00144-5","article-title":"Who should pay for reserve?","volume":"13","author":"Strbac","year":"2000","journal-title":"The Electricity Journal"},{"issue":"3","key":"10.1016\/j.ejor.2026.08.005_b42","doi-asserted-by":"crossref","first-page":"31","DOI":"10.1109\/MPE.2025.3542381","article-title":"Robustness: The missing ingredient in generation scheduling","volume":"23","author":"Street","year":"2025","journal-title":"IEEE Power and Energy Magazine"},{"issue":"2","key":"10.1016\/j.ejor.2026.08.005_b43","doi-asserted-by":"crossref","first-page":"1504","DOI":"10.1109\/TPWRS.2020.3017021","article-title":"Market implications of short-term reserve deliverability enhancement","volume":"36","author":"Wang","year":"2021","journal-title":"IEEE Transactions on Power Systems"},{"issue":"3","key":"10.1016\/j.ejor.2026.08.005_b44","doi-asserted-by":"crossref","first-page":"1457","DOI":"10.1109\/TPWRS.2009.2022983","article-title":"Contingency-constrained reserve requirements in joint energy and ancillary services auction","volume":"24","author":"Wang","year":"2009","journal-title":"IEEE Transactions on Power Systems"},{"issue":"2","key":"10.1016\/j.ejor.2026.08.005_b45","doi-asserted-by":"crossref","first-page":"631","DOI":"10.1109\/TPWRS.2007.894867","article-title":"Pricing energy and reserves using stochastic optimization in an alternative electricity market","volume":"22","author":"Wong","year":"2007","journal-title":"IEEE Transactions on Power Systems"},{"key":"10.1016\/j.ejor.2026.08.005_b46","series-title":"Power generation, operation, and control","author":"Wood","year":"2014"},{"issue":"1","key":"10.1016\/j.ejor.2026.08.005_b47","doi-asserted-by":"crossref","first-page":"339","DOI":"10.1109\/TPWRS.2003.820701","article-title":"Pricing energy and ancillary services in integrated market systems by an optimal power flow","volume":"19","author":"Wu","year":"2004","journal-title":"IEEE Transactions on Power Systems"},{"issue":"2","key":"10.1016\/j.ejor.2026.08.005_b48","doi-asserted-by":"crossref","first-page":"813","DOI":"10.1109\/TSTE.2022.3226255","article-title":"Determination and cost allocation for regulation reserve with renewables: A data-driven assisted approach","volume":"14","author":"Xiang","year":"2023","journal-title":"IEEE Transactions on Sustainable Energy"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221726006867?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221726006867?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2026,10,10]],"date-time":"2026-10-10T19:27:57Z","timestamp":1791660477000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0377221726006867"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2027,1]]},"references-count":48,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2027,1]]}},"alternative-id":["S0377221726006867"],"URL":"https:\/\/doi.org\/10.1016\/j.ejor.2026.08.005","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[2027,1]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"A causation-based framework for pricing and cost allocation of energy, reserves, and transmission in modern power systems","name":"articletitle","label":"Article Title"},{"value":"European Journal of Operational Research","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.ejor.2026.08.005","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"\u00a9 2026 The Authors. Published by Elsevier B.V.","name":"copyright","label":"Copyright"}]}}