{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,18]],"date-time":"2026-04-18T12:48:32Z","timestamp":1776516512900,"version":"3.51.2"},"reference-count":67,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2026,5,1]],"date-time":"2026-05-01T00:00:00Z","timestamp":1777593600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2026,5,1]],"date-time":"2026-05-01T00:00:00Z","timestamp":1777593600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/legal\/tdmrep-license"},{"start":{"date-parts":[[2026,5,1]],"date-time":"2026-05-01T00:00:00Z","timestamp":1777593600000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-017"},{"start":{"date-parts":[[2026,5,1]],"date-time":"2026-05-01T00:00:00Z","timestamp":1777593600000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"},{"start":{"date-parts":[[2026,5,1]],"date-time":"2026-05-01T00:00:00Z","timestamp":1777593600000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-012"},{"start":{"date-parts":[[2026,5,1]],"date-time":"2026-05-01T00:00:00Z","timestamp":1777593600000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2026,5,1]],"date-time":"2026-05-01T00:00:00Z","timestamp":1777593600000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-004"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["51705370"],"award-info":[{"award-number":["51705370"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Journal of Industrial Information Integration"],"published-print":{"date-parts":[[2026,5]]},"DOI":"10.1016\/j.jii.2026.101112","type":"journal-article","created":{"date-parts":[[2026,4,6]],"date-time":"2026-04-06T01:23:59Z","timestamp":1775438639000},"page":"101112","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":0,"special_numbering":"C","title":["Multi-agent deep reinforcement learning for dynamic lot-streaming flow shop problems with unequal sub-lots and capacity constraints"],"prefix":"10.1016","volume":"51","author":[{"given":"Jinhao","family":"Du","sequence":"first","affiliation":[]},{"given":"Yarong","family":"Chen","sequence":"additional","affiliation":[]},{"given":"Jabir","family":"Mumtaz","sequence":"additional","affiliation":[]},{"given":"Faisal","family":"Alkaabneh","sequence":"additional","affiliation":[]},{"given":"Ziyang","family":"Ji","sequence":"additional","affiliation":[]},{"given":"Kaynat Afzal","family":"Minhas","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"issue":"20","key":"10.1016\/j.jii.2026.101112_bib0001","doi-asserted-by":"crossref","first-page":"6252","DOI":"10.1080\/00207543.2019.1675917","article-title":"Hybrid spider monkey optimisation algorithm for multi-level planning and scheduling problems of assembly lines","volume":"58","author":"Mumtaz","year":"2020","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/j.jii.2026.101112_bib0002","unstructured":"Mumtaz, J., et al. A conceptual framework of smart manufacturing for pcb industries."},{"key":"10.1016\/j.jii.2026.101112_bib0003","article-title":"Energy-efficient scheduling of a two-stage flexible printed circuit board flow shop using a hybrid Pareto spider monkey optimisation algorithm","volume":"31","author":"Yue","year":"2023","journal-title":"J. Ind. Inf. Integr."},{"key":"10.1016\/j.jii.2026.101112_bib0004","doi-asserted-by":"crossref","first-page":"226","DOI":"10.1016\/j.jmsy.2024.11.016","article-title":"Development of intelligent system to consider worker's comfortable work duration in assembly line work scheduling","volume":"78","author":"Pabolu","year":"2025","journal-title":"J. Manuf. Syst."},{"key":"10.1016\/j.jii.2026.101112_bib0005","doi-asserted-by":"crossref","DOI":"10.1016\/j.swevo.2025.101944","article-title":"An evolution strategies-based reinforcement learning algorithm for multi-objective dynamic parallel machine scheduling problems","volume":"95","author":"Chen","year":"2025","journal-title":"Swarm. Evol. Comput."},{"key":"10.1016\/j.jii.2026.101112_bib0006","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2024.110001","article-title":"Solving the multi-objective job shop scheduling problems with overtime consideration by an enhanced NSGA-\u2161","volume":"190","author":"Shi","year":"2024","journal-title":"Comput. Ind. Eng."},{"issue":"8","key":"10.1016\/j.jii.2026.101112_bib0007","doi-asserted-by":"crossref","first-page":"2711","DOI":"10.1080\/00207543.2024.2408438","article-title":"A multi-level rescheduling approach for a dynamic remote operations scheduling problem","volume":"63","author":"Castelletti","year":"2025","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/j.jii.2026.101112_bib0008","article-title":"Scheduling with sequence-dependent setup times in short-term production planning: a main path analysis-based review","author":"Ying","year":"2025","journal-title":"Oper. Res. Perspect."},{"issue":"2","key":"10.1016\/j.jii.2026.101112_bib0009","doi-asserted-by":"crossref","first-page":"571","DOI":"10.1080\/0305215X.2024.2328191","article-title":"Scheduling optimization of flexible flow shop with buffer capacity limitation based on an improved discrete particle swarm optimization algorithm","volume":"57","author":"Chang","year":"2025","journal-title":"Eng. Optimiz."},{"issue":"2","key":"10.1016\/j.jii.2026.101112_bib0010","doi-asserted-by":"crossref","first-page":"881","DOI":"10.1109\/TASE.2016.2622253","article-title":"Solving feeder assignment and component sequencing problems for printed circuit board assembly using particle swarm optimization","volume":"14","author":"Hsu","year":"2016","journal-title":"IEEE Trans. Autom. Sci. Eng."},{"issue":"3","key":"10.1016\/j.jii.2026.101112_bib0011","doi-asserted-by":"crossref","first-page":"800","DOI":"10.1016\/j.asoc.2006.02.002","article-title":"Adaptive multi-objective genetic algorithms for scheduling of drilling operation in printed circuit board industry","volume":"7","author":"Chang","year":"2007","journal-title":"Appl. Soft. Comput."},{"issue":"7","key":"10.1016\/j.jii.2026.101112_bib0012","doi-asserted-by":"crossref","first-page":"1255","DOI":"10.3390\/pr9071255","article-title":"Dynamic mixed model lotsizing and scheduling for flexible machining lines using a constructive heuristic","volume":"9","author":"Yue","year":"2021","journal-title":"Processes"},{"issue":"1","key":"10.1016\/j.jii.2026.101112_bib0013","first-page":"23","article-title":"Improved spider monkey optimization algorithm for hybrid flow shop scheduling problem with lot streaming","volume":"45","author":"Du","year":"2023","journal-title":"Eng. Proc."},{"issue":"2","key":"10.1016\/j.jii.2026.101112_bib0014","doi-asserted-by":"crossref","first-page":"455","DOI":"10.1108\/JM2-03-2017-0027","article-title":"Assembly line balancing problem","volume":"13","author":"Fathi","year":"2018","journal-title":"J. Model. Manage."},{"key":"10.1016\/j.jii.2026.101112_bib0015","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2024.110265","article-title":"Exact and approximation heuristic of mixed model assembly line balancing with parallel lines and task-dependent tooling consideration","volume":"193","author":"Alhomaidi","year":"2024","journal-title":"Comput. Ind. Eng."},{"key":"10.1016\/j.jii.2026.101112_bib0016","doi-asserted-by":"crossref","DOI":"10.1016\/j.eswa.2024.125616","article-title":"An efficient Q-learning integrated multi-objective hyper-heuristic approach for hybrid flow shop scheduling problems with lot streaming","volume":"262","author":"Chen","year":"2025","journal-title":"Expert. Syst. Appl."},{"key":"10.1016\/j.jii.2026.101112_bib0017","doi-asserted-by":"crossref","DOI":"10.1016\/j.swevo.2024.101660","article-title":"Two-stage double deep Q-network algorithm considering external non-dominant set for multi-objective dynamic flexible job shop scheduling problems","volume":"90","author":"Yue","year":"2024","journal-title":"Swarm. Evol. Comput."},{"key":"10.1016\/j.jii.2026.101112_bib0018","doi-asserted-by":"crossref","DOI":"10.1016\/j.rcim.2024.102834","article-title":"Multi-agent deep reinforcement learning for dynamic reconfigurable shop scheduling considering batch processing and worker cooperation","volume":"91","author":"Li","year":"2025","journal-title":"Robot. Comput. Integr. Manuf."},{"key":"10.1016\/j.jii.2026.101112_bib0019","first-page":"1","article-title":"An end-to-end decentralised scheduling framework based on deep reinforcement learning for dynamic distributed heterogeneous flowshop scheduling","author":"Li","year":"2025","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/j.jii.2026.101112_bib0020","doi-asserted-by":"crossref","DOI":"10.1016\/j.ins.2025.121906","article-title":"Solving industrial chain job scheduling problems through a deep reinforcement learning method with decay strategy","author":"Hua","year":"2025","journal-title":"Inf. Sci. (N.Y.)"},{"key":"10.1016\/j.jii.2026.101112_bib0021","doi-asserted-by":"crossref","first-page":"18685","DOI":"10.1109\/ACCESS.2019.2895954","article-title":"Multi-level planning and scheduling for parallel PCB assembly lines using hybrid spider monkey optimization approach","volume":"7","author":"Mumtaz","year":"2019","journal-title":"IEEE Access"},{"key":"10.1016\/j.jii.2026.101112_bib0022","doi-asserted-by":"crossref","DOI":"10.1016\/j.eswa.2023.120600","article-title":"An improved spider monkey optimization algorithm for multi-objective planning and scheduling problems of PCB assembly line","volume":"229","author":"Chen","year":"2023","journal-title":"Expert. Syst. Appl."},{"key":"10.1016\/j.jii.2026.101112_bib0023","article-title":"The optimal configuration for various placement machines in PCB assembly lines","author":"Chen","year":"2024","journal-title":"Ann. Oper. Res."},{"issue":"4","key":"10.1016\/j.jii.2026.101112_bib0024","doi-asserted-by":"crossref","first-page":"1275","DOI":"10.1080\/00207543.2024.2373426","article-title":"Integrated scheduling of multi-objective lot-streaming hybrid flowshop with AGV based on deep reinforcement learning","volume":"63","author":"Tang","year":"2025","journal-title":"Int. J. Prod. Res."},{"issue":"5","key":"10.1016\/j.jii.2026.101112_bib0025","doi-asserted-by":"crossref","first-page":"1509","DOI":"10.1080\/00207543.2013.848304","article-title":"Improved sheep flock heredity algorithm and artificial bee colony algorithm for scheduling m-machine flow shops lot streaming with equal size sub-lot problems","volume":"52","author":"Chakaravarthy","year":"2014","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/j.jii.2026.101112_bib0026","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2023.109428","article-title":"Improved multi-objective artificial bee colony algorithm for parallel machine lot-streaming scheduling problem with limited and unequal sub-lots","volume":"183","author":"Zhu","year":"2023","journal-title":"Comput. Ind. Eng."},{"key":"10.1016\/j.jii.2026.101112_bib0027","doi-asserted-by":"crossref","DOI":"10.1016\/j.swevo.2019.100600","article-title":"Efficient multi-objective algorithm for the lot-streaming hybrid flowshop with variable sub-lots","volume":"52","author":"Li","year":"2020","journal-title":"Swarm. Evol. Comput."},{"key":"10.1016\/j.jii.2026.101112_bib0028","doi-asserted-by":"crossref","DOI":"10.1016\/j.eswa.2023.120402","article-title":"A decomposition-based multi-objective Jaya algorithm for lot-streaming job shop scheduling with variable sublots and intermingling setting","volume":"228","author":"Xie","year":"2023","journal-title":"Expert. Syst. Appl."},{"key":"10.1016\/j.jii.2026.101112_bib0029","doi-asserted-by":"crossref","first-page":"266","DOI":"10.1016\/j.procir.2019.04.075","article-title":"Application of an improved spider monkey optimization algorithm for component assignment problem in PCB assembly","volume":"83","author":"Wang","year":"2019","journal-title":"Procedia CIRP"},{"issue":"5","key":"10.1016\/j.jii.2026.101112_bib0030","doi-asserted-by":"crossref","first-page":"1674","DOI":"10.1080\/00207543.2024.2383781","article-title":"Minimising makespan in distributed assembly hybrid flowshop scheduling problems","volume":"63","author":"Ying","year":"2025","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/j.jii.2026.101112_bib0031","first-page":"1","article-title":"Solving a printed circuit board assembly problem: methodology and practice","author":"Xiang","year":"2025","journal-title":"Eng. Optimiz."},{"issue":"7","key":"10.1016\/j.jii.2026.101112_bib0032","doi-asserted-by":"crossref","first-page":"6911","DOI":"10.1109\/TCYB.2020.3040788","article-title":"Hierarchical multiobjective heuristic for PCB assembly optimization in a beam-head surface mounter","volume":"52","author":"Gao","year":"2022","journal-title":"IEEE Trans. Cybern."},{"key":"10.1016\/j.jii.2026.101112_bib0033","doi-asserted-by":"crossref","DOI":"10.1016\/j.rcim.2019.101844","article-title":"A smart algorithm for multi-criteria optimization of model sequencing problem in assembly lines","volume":"61","author":"Rauf","year":"2020","journal-title":"Robot. Comput. Integr. Manuf."},{"key":"10.1016\/j.jii.2026.101112_bib0034","doi-asserted-by":"crossref","first-page":"206","DOI":"10.1016\/j.jmsy.2023.09.010","article-title":"Digital twin model-based smart assembly strategy design and precision evaluation for PCB kit-box build","volume":"71","author":"Li","year":"2023","journal-title":"J. Manuf. Syst."},{"issue":"6","key":"10.1016\/j.jii.2026.101112_bib0035","doi-asserted-by":"crossref","first-page":"729","DOI":"10.3390\/sym11060729","article-title":"Hybrid particle swarm algorithm for products\u2019 scheduling problem in cellular manufacturing system","volume":"11","author":"Khalid","year":"2019","journal-title":"Symmetry (Basel)"},{"issue":"3","key":"10.1016\/j.jii.2026.101112_bib0036","doi-asserted-by":"crossref","first-page":"3609","DOI":"10.1109\/TII.2023.3312410","article-title":"A scan-based hierarchical heuristic optimization algorithm for PCB assembly process","volume":"20","author":"Lu","year":"2023","journal-title":"IEEE Trans. Industr. Inform."},{"key":"10.1016\/j.jii.2026.101112_bib0037","first-page":"1","article-title":"Safety-driven optimisation of human\u2013robot collaborative assembly line balancing","author":"Kheirabadi","year":"2025","journal-title":"Int. J. Prod. Res."},{"issue":"17","key":"10.1016\/j.jii.2026.101112_bib0038","doi-asserted-by":"crossref","first-page":"3949","DOI":"10.1080\/00207540600791608","article-title":"PCB assembly scheduling for collect-and-place machines using genetic algorithms","volume":"45","author":"Kulak","year":"2007","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/j.jii.2026.101112_bib0039","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2024.109976","article-title":"Solving line balancing and AGV scheduling problems for intelligent decisions using a genetic-artificial bee colony algorithm","volume":"189","author":"Mumtaz","year":"2024","journal-title":"Comput. Ind. Eng."},{"issue":"3","key":"10.1016\/j.jii.2026.101112_bib0040","article-title":"Dynamic scheduling of hybrid flow shop problem with uncertain process time and flexible maintenance using NeuroEvolution of Augmenting topologies","volume":"6","author":"Chen","year":"2024","journal-title":"IET Collab. Intell. Manuf."},{"key":"10.1016\/j.jii.2026.101112_bib0041","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2024.110155","article-title":"Dynamic scheduling mechanism for intelligent workshop with deep reinforcement learning method based on multi-agent system architecture","volume":"191","author":"Gu","year":"2024","journal-title":"Comput. Ind. Eng."},{"issue":"1","key":"10.1016\/j.jii.2026.101112_bib0042","first-page":"34","article-title":"FlexSim-simulated PCB assembly line optimization using deep Q-network","volume":"75","author":"Du","year":"2024","journal-title":"Eng. Proc."},{"key":"10.1016\/j.jii.2026.101112_bib0043","series-title":"Advances in Machine Intelligence: Past, Present, and Future","first-page":"1","author":"Dhiman","year":"2024"},{"issue":"2","key":"10.1016\/j.jii.2026.101112_bib0044","doi-asserted-by":"crossref","first-page":"90","DOI":"10.62762\/TMI.2025.682666","article-title":"Integrating artificial intelligence and machine learning in autism detection via gut microbiome analysis","volume":"1","author":"Singh","year":"2025","journal-title":"ICCK Trans. Mach. Intell."},{"key":"10.1016\/j.jii.2026.101112_bib0045","doi-asserted-by":"crossref","unstructured":"Khan, M., R. Kumar, and G. Dhiman, A hybrid machine learning fuzzy non-linear regression approach for neutrosophic fuzzy set. 2025.","DOI":"10.62762\/TMI.2025.561363"},{"issue":"1","key":"10.1016\/j.jii.2026.101112_bib0046","first-page":"22","article-title":"Improved evolutionary strategy reinforcement learning for multi-objective dynamic scheduling of hybrid flow shop problem","volume":"75","author":"Zhang","year":"2024","journal-title":"Eng. Proc."},{"key":"10.1016\/j.jii.2026.101112_bib0047","doi-asserted-by":"crossref","DOI":"10.1016\/j.jclepro.2020.124405","article-title":"A loosely-coupled deep reinforcement learning approach for order acceptance decision of mass-individualized printed circuit board manufacturing in industry 4.0","volume":"280","author":"Leng","year":"2021","journal-title":"J. Clean. Prod."},{"key":"10.1016\/j.jii.2026.101112_bib0048","doi-asserted-by":"crossref","first-page":"117","DOI":"10.58496\/BJAI\/2025\/011","article-title":"Artificial intelligence approaches to mitigating network congestion in IoT systems","author":"Oleiwi","year":"2025","journal-title":"Babylon. J. Artif. Intell."},{"key":"10.1016\/j.jii.2026.101112_bib0049","doi-asserted-by":"crossref","first-page":"30","DOI":"10.58496\/BJM\/2023\/006","article-title":"Optimization-based design and control of dynamic systems","author":"Govindan","year":"2023","journal-title":"Babylon. J. Math."},{"issue":"3","key":"10.1016\/j.jii.2026.101112_bib0050","doi-asserted-by":"crossref","first-page":"127","DOI":"10.62762\/TMI.2025.922612","article-title":"Comparative study of Pentagonal and hexagonal fuzzy membership function using credibility theory in machine learning systems","volume":"1","author":"Bmotra","year":"2025","journal-title":"ICCK Trans. Mach. Intell."},{"key":"10.1016\/j.jii.2026.101112_bib0051","series-title":"A Compendium of Responsible Artificial Intelligence","author":"Jain","year":"2025"},{"key":"10.1016\/j.jii.2026.101112_bib0052","unstructured":"Alghamdi, N.S., A. Kaur, and G. Dhiman. FLAT: A New Federated Learning Framework for Privacy Preserving in Smart Cities Using IoT and Artificial Intelligence-Enabled Tunicate Swarm Algorithm. Springer."},{"key":"10.1016\/j.jii.2026.101112_bib0053","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2024.110263","article-title":"An improved genetic algorithm based on reinforcement learning for aircraft assembly scheduling problem","volume":"193","author":"Wen","year":"2024","journal-title":"Comput. Ind. Eng."},{"key":"10.1016\/j.jii.2026.101112_bib0054","article-title":"Job shop smart manufacturing scheduling by deep reinforcement learning","volume":"38","author":"Serrano-Ruiz","year":"2024","journal-title":"J. Ind. Inf. Integr."},{"key":"10.1016\/j.jii.2026.101112_bib0055","doi-asserted-by":"crossref","DOI":"10.1016\/j.engappai.2024.109851","article-title":"Modelling and scheduling distributed assembly permutation flow-shops using reinforcement learning-based evolutionary algorithms","volume":"142","author":"Qiu","year":"2025","journal-title":"Eng. Appl. Artif. Intell."},{"issue":"1","key":"10.1016\/j.jii.2026.101112_bib0056","doi-asserted-by":"crossref","first-page":"29","DOI":"10.62762\/TMI.2024.529242","article-title":"Enhanced reinforcement learning-based resource scheduling for secure blockchain networks in IIoT","volume":"1","author":"Garg","year":"2025","journal-title":"IECE Trans. Mach. Intell."},{"key":"10.1016\/j.jii.2026.101112_bib0057","doi-asserted-by":"crossref","DOI":"10.1016\/j.rcim.2025.103160","article-title":"A reinforcement learning-based metaheuristic approach to address the dynamic scheduling problem in cloud manufacturing with task cancellation","volume":"98","author":"Rajabi-Kafshgar","year":"2026","journal-title":"Robot. Comput. Integr. Manuf."},{"key":"10.1016\/j.jii.2026.101112_bib0058","article-title":"Graph reinforcement learning based dynamic scheduling for human-machine symbiosis manufacturing considering multi-type disturbance events","volume":"47","author":"Li","year":"2025","journal-title":"J. Ind. Inf. Integr."},{"key":"10.1016\/j.jii.2026.101112_bib0059","doi-asserted-by":"crossref","DOI":"10.1016\/j.aei.2024.102632","article-title":"Real-time scheduling for two-stage assembly flowshop with dynamic job arrivals by deep reinforcement learning","volume":"62","author":"Chen","year":"2024","journal-title":"Adv. Eng. Inform."},{"key":"10.1016\/j.jii.2026.101112_bib0060","article-title":"Adaptive hybrid priority-enabled deep Q-network for machine degradation-based dynamic scheduling of assembly line","author":"Du","year":"2025","journal-title":"J. Ind. Inf. Integr."},{"issue":"8","key":"10.1016\/j.jii.2026.101112_bib0061","doi-asserted-by":"crossref","first-page":"3917","DOI":"10.1007\/s10845-023-02309-8","article-title":"Multi agent reinforcement learning for online layout planning and scheduling in flexible assembly systems","volume":"35","author":"Kaven","year":"2024","journal-title":"J. Intell. Manuf."},{"key":"10.1016\/j.jii.2026.101112_bib0062","doi-asserted-by":"crossref","DOI":"10.1016\/j.asoc.2024.112352","article-title":"A state-of-the-art review of long short-term memory models with applications in hydrology and water resources","author":"Feng","year":"2024","journal-title":"Appl. Soft. Comput."},{"issue":"20","key":"10.1016\/j.jii.2026.101112_bib0063","doi-asserted-by":"crossref","first-page":"6252","DOI":"10.1080\/00207543.2019.1675917","article-title":"Hybrid spider monkey optimisation algorithm for multi-level planning and scheduling problems of assembly lines","volume":"58","author":"Mumtaz","year":"2020","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/j.jii.2026.101112_bib0064","doi-asserted-by":"crossref","first-page":"3","DOI":"10.58496\/ADSA\/2025\/002","article-title":"Limitations of deep learning vs. human intelligence: training data, interpretability, bias, and ethics","author":"Khaleel","year":"2025","journal-title":"Appl. Data Sci. Anal."},{"issue":"24","key":"10.1016\/j.jii.2026.101112_bib0065","doi-asserted-by":"crossref","first-page":"10677","DOI":"10.1080\/00207543.2025.2555532","article-title":"Real-time AGV cluster scheduling using attention-enhanced PPO and strategy transfer in large-scale solar cell production workshops with multiple concurrent tasks","volume":"63","author":"Zhou","year":"2025","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/j.jii.2026.101112_bib0066","article-title":"A novel deep reinforcement learning framework based on digital twins for dynamic job shop scheduling problems","volume":"296","author":"Zhang","year":"2026","journal-title":"Expert. Syst. Appl."},{"issue":"9","key":"10.1016\/j.jii.2026.101112_bib0067","doi-asserted-by":"crossref","first-page":"16915","DOI":"10.1109\/JIOT.2024.3366252","article-title":"A2C-DRL: dynamic scheduling for stochastic edge\u2013cloud environments using A2C and deep reinforcement learning","volume":"11","author":"Lu","year":"2024","journal-title":"IEEE Internet. Things. J."}],"container-title":["Journal of Industrial Information Integration"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S2452414X26000543?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S2452414X26000543?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2026,4,18]],"date-time":"2026-04-18T12:12:39Z","timestamp":1776514359000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S2452414X26000543"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2026,5]]},"references-count":67,"alternative-id":["S2452414X26000543"],"URL":"https:\/\/doi.org\/10.1016\/j.jii.2026.101112","relation":{},"ISSN":["2452-414X"],"issn-type":[{"value":"2452-414X","type":"print"}],"subject":[],"published":{"date-parts":[[2026,5]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Multi-agent deep reinforcement learning for dynamic lot-streaming flow shop problems with unequal sub-lots and capacity constraints","name":"articletitle","label":"Article Title"},{"value":"Journal of Industrial Information Integration","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.jii.2026.101112","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"\u00a9 2026 Elsevier Inc. All rights are reserved, including those for text and data mining, AI training, and similar technologies.","name":"copyright","label":"Copyright"}],"article-number":"101112"}}