{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,7,24]],"date-time":"2026-07-24T13:43:48Z","timestamp":1784900628420,"version":"3.55.0"},"reference-count":58,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2026,6,1]],"date-time":"2026-06-01T00:00:00Z","timestamp":1780272000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2026,6,1]],"date-time":"2026-06-01T00:00:00Z","timestamp":1780272000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/legal\/tdmrep-license"},{"start":{"date-parts":[[2026,4,22]],"date-time":"2026-04-22T00:00:00Z","timestamp":1776816000000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Journal of Rail Transport Planning &amp; Management"],"published-print":{"date-parts":[[2026,6]]},"DOI":"10.1016\/j.jrtpm.2026.100581","type":"journal-article","created":{"date-parts":[[2026,4,22]],"date-time":"2026-04-22T18:52:13Z","timestamp":1776883933000},"page":"100581","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":1,"special_numbering":"C","title":["Impact of timetable structure on the performance of rail corridors"],"prefix":"10.1016","volume":"38","author":[{"ORCID":"https:\/\/orcid.org\/0009-0002-0198-0242","authenticated-orcid":false,"given":"Martin","family":"Tosstorff","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0009-0009-0503-6444","authenticated-orcid":false,"given":"Daniel","family":"Heitzinger","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-5977-9958","authenticated-orcid":false,"given":"Norman","family":"Weik","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"78","reference":[{"issue":"5","key":"10.1016\/j.jrtpm.2026.100581_b1","doi-asserted-by":"crossref","first-page":"774","DOI":"10.1016\/j.tre.2007.04.001","article-title":"An assessment of railway capacity","volume":"44","author":"Abril","year":"2008","journal-title":"Transp. Res. Part E"},{"issue":"3","key":"10.1016\/j.jrtpm.2026.100581_b2","first-page":"95","article-title":"Quantifying railway timetable robustness in critical points","volume":"3","author":"Andersson","year":"2013","journal-title":"J. Rail Transp. Plan. Manag."},{"issue":"1","key":"10.1016\/j.jrtpm.2026.100581_b3","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1023\/A:1010933404324","article-title":"Random forests","volume":"45","author":"Breiman","year":"2001","journal-title":"Mach. Learn."},{"issue":"1\u20132","key":"10.1016\/j.jrtpm.2026.100581_b4","first-page":"34","article-title":"Stochastic modelling of delay propagation in large networks","volume":"2","author":"B\u00fcker","year":"2012","journal-title":"J. Rail Transp. Plan. Manag."},{"issue":"3","key":"10.1016\/j.jrtpm.2026.100581_b5","first-page":"171","article-title":"Optimization of supplements and buffer times in passenger robust timetabling","volume":"7","author":"Burggraeve","year":"2017","journal-title":"J. Rail Transp. Plan. Manag."},{"key":"10.1016\/j.jrtpm.2026.100581_b6","series-title":"Increasing punctuality by optimizing the allocation of timetable supplements","author":"Burkolter","year":"2025"},{"key":"10.1016\/j.jrtpm.2026.100581_b7","doi-asserted-by":"crossref","DOI":"10.1016\/j.ijepes.2022.108356","article-title":"Correlation analysis of traction load sequences based on optimal delay method","volume":"142","author":"Che","year":"2022","journal-title":"Int. J. Electr. Power Energy Syst."},{"key":"10.1016\/j.jrtpm.2026.100581_b8","doi-asserted-by":"crossref","DOI":"10.1016\/j.ejtl.2025.100155","article-title":"50 Years of OR in railway timetabling and rolling stock planning","volume":"14","author":"Correia Duarte","year":"2025","journal-title":"EURO J. Transp. Logist."},{"issue":"10","key":"10.1016\/j.jrtpm.2026.100581_b9","first-page":"627","volume":"70","author":"Coviello","year":"2015","journal-title":"Ing. Ferrov."},{"issue":"1","key":"10.1016\/j.jrtpm.2026.100581_b10","doi-asserted-by":"crossref","first-page":"720","DOI":"10.1177\/03611981221101392","article-title":"Multiobjective timetable development tool for railway strategic planning in Norway","volume":"2677","author":"Coviello","year":"2023","journal-title":"Transp. Res. Rec."},{"key":"10.1016\/j.jrtpm.2026.100581_b11","series-title":"2023 IEEE 26th Internat. Conference on Intelligent Transportation Systems","first-page":"4973","article-title":"Integrated ant colony optimization and mixed integer linear programming for multi-objective railway timetabling","author":"Coviello","year":"2023"},{"issue":"3","key":"10.1016\/j.jrtpm.2026.100581_b12","doi-asserted-by":"crossref","first-page":"232","DOI":"10.2495\/TDI-V3-N3-232-244","article-title":"A simulation-based approach for estimating railway capacity","volume":"3","author":"D\u2019Acierno","year":"2019","journal-title":"Int. Journal Transp. Dev. Integr."},{"key":"10.1016\/j.jrtpm.2026.100581_b13","doi-asserted-by":"crossref","first-page":"38","DOI":"10.1016\/j.neucom.2015.12.114","article-title":"Mean absolute percentage error for regression models","volume":"192","author":"de Myttenaere","year":"2016","journal-title":"Neurocomputing"},{"key":"10.1016\/j.jrtpm.2026.100581_b14","series-title":"Richtlinie 405 \u2013 fahrwegkapazit\u00e4t","author":"Deutsche Bahn","year":"2022"},{"issue":"1","key":"10.1016\/j.jrtpm.2026.100581_b15","first-page":"78","article-title":"Integrated timetables for railway passenger transport services","volume":"15","author":"Finger","year":"2014","journal-title":"Comp\u00e9t. Regul. Netw. Ind."},{"issue":"2","key":"10.1016\/j.jrtpm.2026.100581_b16","doi-asserted-by":"crossref","first-page":"179","DOI":"10.1016\/j.trb.2006.02.003","article-title":"Railway timetable stability analysis using max-plus system theory","volume":"41","author":"Goverde","year":"2007","journal-title":"Transp. Res. Part B"},{"issue":"1","key":"10.1016\/j.jrtpm.2026.100581_b17","doi-asserted-by":"crossref","first-page":"52","DOI":"10.1287\/trsc.2022.1158","article-title":"A combined simulation-optimization approach for robust timetabling on main railway lines","volume":"57","author":"H\u00f6gdahl","year":"2023","journal-title":"Transp. Sci."},{"key":"10.1016\/j.jrtpm.2026.100581_b18","doi-asserted-by":"crossref","first-page":"126","DOI":"10.1016\/j.trc.2016.10.013","article-title":"Strategic assessment of capacity consumption in railway networks: Framework and model","volume":"74","author":"Jensen","year":"2017","journal-title":"Transp. Res. Part C"},{"key":"10.1016\/j.jrtpm.2026.100581_b19","doi-asserted-by":"crossref","unstructured":"Ji, Y., Zheng, W., Dong, H., Gao, P., 2020. Train delays prediction based on feature selection and random forest. In: 2020 IEEE 23rd Internat. Conference on Intelligent Transportation Systems. ITSC, pp. 1\u2014-6.","DOI":"10.1109\/ITSC45102.2020.9294653"},{"issue":"1","key":"10.1016\/j.jrtpm.2026.100581_b20","doi-asserted-by":"crossref","first-page":"44","DOI":"10.1016\/j.ejor.2016.05.013","article-title":"Optimal allocation of buffer times to increase train schedule robustness","volume":"256","author":"Jovanovi\u0107","year":"2017","journal-title":"European J. Oper. Res."},{"issue":"1\/2","key":"10.1016\/j.jrtpm.2026.100581_b21","doi-asserted-by":"crossref","first-page":"81","DOI":"10.2307\/2332226","article-title":"A new measure of rank correlation","volume":"30","author":"Kendall","year":"1938","journal-title":"Biometrika"},{"key":"10.1016\/j.jrtpm.2026.100581_b22","series-title":"Leistungsf\u00e4higkeit von Eisenbahnstrecken unter Ber\u00fccksichtigung der Anzahl an \u00dcberholungsgleisen und von Mindestabst\u00e4nden f\u00fcr betriebliche Kreuzungen","author":"Kogel","year":"2021"},{"key":"10.1016\/j.jrtpm.2026.100581_b23","first-page":"1051","volume":"vol. 64","author":"Kontaxi","year":"2009"},{"issue":"7","key":"10.1016\/j.jrtpm.2026.100581_b24","doi-asserted-by":"crossref","first-page":"2067","DOI":"10.1007\/s00521-014-1694-x","article-title":"Estimation of rail capacity using regression and neural network","volume":"25","author":"Lai","year":"2014","journal-title":"Neural Comput. Appl."},{"key":"10.1016\/j.jrtpm.2026.100581_b25","doi-asserted-by":"crossref","first-page":"142","DOI":"10.1016\/j.trb.2016.12.004","article-title":"Balance of efficiency and robustness in passenger railway timetables","volume":"97","author":"Lee","year":"2017","journal-title":"Transp. Res. Part B: Methodol."},{"key":"10.1016\/j.jrtpm.2026.100581_b26","first-page":"1","article-title":"Estimating the railway network capacity utilization with mixed train routes and stopping patterns: A multiobjective optimization approach","author":"Liao","year":"2024","journal-title":"J. Adv. Transp."},{"key":"10.1016\/j.jrtpm.2026.100581_b27","article-title":"Analysis of capacity on double-track railway lines","author":"Lindfeldt","year":"2010","journal-title":"Transp. Plan. Technol. (Print)"},{"key":"10.1016\/j.jrtpm.2026.100581_b28","unstructured":"Lindfeldt, A., 2013. Heterogeneity measures and secondary delays on a simulated double-track. In: Proc. 5th Internat. Seminar on Railway Operations Modelling and Analysis (RailCopenhagen)."},{"issue":"1","key":"10.1016\/j.jrtpm.2026.100581_b29","first-page":"49","article-title":"Applicability of the analytical UIC code 406 compression method for evaluating line and station capacity","volume":"1","author":"Lindner","year":"2011","journal-title":"J. Rail Transp. Plan. Manag."},{"key":"10.1016\/j.jrtpm.2026.100581_b30","series-title":"Book of Abstracts of Rail Dresden","article-title":"How much is enough? A comparative analysis of delay and recovery time in railways for Switzerland, Austria and Germany","author":"Lordieck","year":"2025"},{"issue":"2","key":"10.1016\/j.jrtpm.2026.100581_b31","doi-asserted-by":"crossref","first-page":"218","DOI":"10.1016\/j.trb.2006.02.007","article-title":"Stochastic delay propagation in railway networks and phase-type distributions","volume":"41","author":"Meester","year":"2007","journal-title":"Transp. Res. Part B: Methodol."},{"key":"10.1016\/j.jrtpm.2026.100581_b32","article-title":"Machine learning-assisted macro simulation for yard arrival prediction","volume":"25","author":"Minbashi","year":"2023","journal-title":"J. Rail Transp. Plan. Manag."},{"issue":"3","key":"10.1016\/j.jrtpm.2026.100581_b33","doi-asserted-by":"crossref","first-page":"996","DOI":"10.1016\/j.ejor.2008.04.035","article-title":"An analytic finite capacity queueing network model capturing the propagation of congestion and blocking","volume":"196","author":"Osorio","year":"2009","journal-title":"European J. Oper. Res."},{"key":"10.1016\/j.jrtpm.2026.100581_b34","series-title":"Systemtechnik Des Schienenverkehrs","author":"Pachl","year":"2011"},{"key":"10.1016\/j.jrtpm.2026.100581_b35","first-page":"2825","article-title":"Scikit-learn: Machine learning in python","volume":"12","author":"Pedregosa","year":"2011","journal-title":"J. Mach. Learn. Res."},{"key":"10.1016\/j.jrtpm.2026.100581_b36","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1016\/j.trb.2021.02.006","article-title":"Timetabling for strategic passenger railway planning","volume":"146","author":"Polinder","year":"2021","journal-title":"Transp. Res. Part B: Methodol."},{"issue":"1","key":"10.1016\/j.jrtpm.2026.100581_b37","doi-asserted-by":"crossref","first-page":"30","DOI":"10.1007\/s40534-015-0069-z","article-title":"Railroad capacity tools and methodologies in the US and europe","volume":"23","author":"Pouryousef","year":"2015","journal-title":"J. Mod. Transp."},{"issue":"5","key":"10.1016\/j.jrtpm.2026.100581_b38","doi-asserted-by":"crossref","DOI":"10.3390\/cancers13050991","article-title":"Random forest modelling of high-dimensional mixed-type data for breast cancer classification","volume":"13","author":"Quist","year":"2021","journal-title":"Cancers"},{"key":"10.1016\/j.jrtpm.2026.100581_b39","article-title":"Railway capacity: A review of analysis methods","volume":"24","author":"Sameni","year":"2022","journal-title":"J. Rail Transp. Plan. Manag."},{"key":"10.1016\/j.jrtpm.2026.100581_b40","unstructured":"Scheepmaker, G.M., Goverde, R.M., 2015. Running time supplements: energy-efficient train control versus robust timetables. In: Proc. of the 6th Internat. Conference on Railway Operations Modelling and Analysis, RailTokyo2015. pp. 1\u201320."},{"key":"10.1016\/j.jrtpm.2026.100581_b41","unstructured":"Schmitz, C., Weik, N., Zieger, S., Nie\u00dfen, N., Schmeink, A., 2017. Markov models for the performance analysis of railway networks. In: Proceedings of the 7th International Conference on Railway Operations Modelling & Analysis (RailLille 2017), April 4-7, 2017."},{"key":"10.1016\/j.jrtpm.2026.100581_b42","doi-asserted-by":"crossref","unstructured":"Schneider, S., Ramesh, A., Roets, A., Stirbu, C., Safaei, F., Ghriss, F., W\u00fclfing, J., G\u00fcra, M., Sibon, N., Gentry, R., Liessner, R., Hustache, T., Lecat, T., Deekshith, U., Markin, V., Le, V., Bejjani, W., Kupper, M., Sturm, I., 2024. Intelligent Railway Capacity and Traffic Management Using Multi-Agent Deep Reinforcement Learning. In: 2024 IEEE 27th International Conference on Intelligent Transportation Systems. ITSC, pp. 1743\u20131748.","DOI":"10.1109\/ITSC58415.2024.10919999"},{"issue":"1","key":"10.1016\/j.jrtpm.2026.100581_b43","first-page":"21","article-title":"Trees, forests, and impurity-based variable importance in regression","volume":"59","author":"Scornet","year":"2023","journal-title":"Ann. de L\u2019Institut Henri Poincar\u00c9, Probabilit\u00e9s et Stat."},{"key":"10.1016\/j.jrtpm.2026.100581_b44","article-title":"A review of train delay prediction approaches","volume":"22","author":"Spanninger","year":"2022","journal-title":"J. Rail Transp. Plan. Manag."},{"key":"10.1016\/j.jrtpm.2026.100581_b45","doi-asserted-by":"crossref","DOI":"10.1016\/j.trc.2023.104436","article-title":"Quantifying periodic railway network capacity using petri nets and macroscopic fundamental diagram","volume":"158","author":"Szymula","year":"2024","journal-title":"Transp. Res. Part C: Emerg. Technol."},{"issue":"3","key":"10.1016\/j.jrtpm.2026.100581_b46","doi-asserted-by":"crossref","first-page":"311","DOI":"10.1080\/15472450.2020.1858822","article-title":"Machine learning techniques to predict reactionary delays and other associated key performance indicators on british railway network","volume":"26","author":"Taleongpong","year":"2022","journal-title":"J. Intell. Transp. Syst."},{"issue":"1","key":"10.1016\/j.jrtpm.2026.100581_b47","first-page":"59","article-title":"Numerical recipes in c","volume":"693","author":"Teukolsky","year":"1992","journal-title":"SMR"},{"key":"10.1016\/j.jrtpm.2026.100581_b48","doi-asserted-by":"crossref","DOI":"10.1016\/j.trc.2023.104027","article-title":"A review of data-driven approaches to predict train delays","volume":"148","author":"Tiong","year":"2023","journal-title":"Transp. Res. Part C"},{"key":"10.1016\/j.jrtpm.2026.100581_b49","series-title":"Code 406: capacity","author":"UIC","year":"2013"},{"issue":"2","key":"10.1016\/j.jrtpm.2026.100581_b50","doi-asserted-by":"crossref","first-page":"647","DOI":"10.1016\/j.ejor.2004.10.010","article-title":"Reliability and heterogeneity of railway services","volume":"172","author":"Vromans","year":"2006","journal-title":"European J. Oper. Res."},{"key":"10.1016\/j.jrtpm.2026.100581_b51","series-title":"Long-term capacity planning of railway infrastructure : a stochastic approach capturing infrastructure unavailability","first-page":"1 Online","author":"Weik","year":"2020"},{"issue":"2","key":"10.1016\/j.jrtpm.2026.100581_b52","first-page":"99","article-title":"Capacity analysis of railway lines in Germany \u2013 a rigorous discussion of the queueing based approach","volume":"6","author":"Weik","year":"2016","journal-title":"J. Rail Transp. Plan. Manag."},{"key":"10.1016\/j.jrtpm.2026.100581_b53","article-title":"Quantifying the effects of running time variability on the capacity of rail corridors","volume":"15","author":"Weik","year":"2020","journal-title":"J. Rail Transp. Plan. Manag."},{"key":"10.1016\/j.jrtpm.2026.100581_b54","article-title":"Extending UIC 406-based capacity analysis\u2013new approaches for railway nodes and network effects","volume":"15","author":"Weik","year":"2020","journal-title":"J. Rail Transp. Plan. Manag."},{"issue":"2","key":"10.1016\/j.jrtpm.2026.100581_b55","doi-asserted-by":"crossref","first-page":"148","DOI":"10.1016\/j.trb.2006.02.009","article-title":"The scheduled waiting time on railway lines","volume":"41","author":"Wendler","year":"2007","journal-title":"Transp. Res. Part B"},{"key":"10.1016\/j.jrtpm.2026.100581_b56","series-title":"Stochastic Modelling of Train Delays and Delay Propagation in Stations","author":"Yuan","year":"2006"},{"key":"10.1016\/j.jrtpm.2026.100581_b57","article-title":"Analytical railway line capacity methods from graph-theoretical and polyhedral perspectives","author":"Zhong","year":"2024","journal-title":"Transp. A: Transp. Sci."},{"issue":"3","key":"10.1016\/j.jrtpm.2026.100581_b58","first-page":"220","article-title":"The influence of buffer time distributions in delay propagation modelling of railway networks","volume":"8","author":"Zieger","year":"2018","journal-title":"J. Rail Transp. Plan. Manag."}],"container-title":["Journal of Rail Transport Planning &amp; Management"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S2210970626000156?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S2210970626000156?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2026,5,27]],"date-time":"2026-05-27T13:13:59Z","timestamp":1779887639000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S2210970626000156"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2026,6]]},"references-count":58,"alternative-id":["S2210970626000156"],"URL":"https:\/\/doi.org\/10.1016\/j.jrtpm.2026.100581","relation":{},"ISSN":["2210-9706"],"issn-type":[{"value":"2210-9706","type":"print"}],"subject":[],"published":{"date-parts":[[2026,6]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Impact of timetable structure on the performance of rail corridors","name":"articletitle","label":"Article Title"},{"value":"Journal of Rail Transport Planning & Management","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.jrtpm.2026.100581","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"\u00a9 2026 The Authors. Published by Elsevier Ltd.","name":"copyright","label":"Copyright"}],"article-number":"100581"}}