{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,13]],"date-time":"2026-03-13T05:38:50Z","timestamp":1773380330456,"version":"3.50.1"},"reference-count":37,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2026,7,1]],"date-time":"2026-07-01T00:00:00Z","timestamp":1782864000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2026,7,1]],"date-time":"2026-07-01T00:00:00Z","timestamp":1782864000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/legal\/tdmrep-license"},{"start":{"date-parts":[[2026,1,19]],"date-time":"2026-01-19T00:00:00Z","timestamp":1768780800000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Reliability Engineering &amp; System Safety"],"published-print":{"date-parts":[[2026,7]]},"DOI":"10.1016\/j.ress.2026.112251","type":"journal-article","created":{"date-parts":[[2026,1,18]],"date-time":"2026-01-18T15:44:30Z","timestamp":1768751070000},"page":"112251","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":0,"special_numbering":"C","title":["Simulating the impact of varying maintenance interventions on asset performance and spare part provisioning in a multi-echelon replenishment system"],"prefix":"10.1016","volume":"271","author":[{"given":"Peter","family":"Chemweno","sequence":"first","affiliation":[]},{"given":"Ido","family":"Morag","sequence":"additional","affiliation":[]},{"given":"Liliane","family":"Pintelon","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/j.ress.2026.112251_bib0001","doi-asserted-by":"crossref","DOI":"10.1016\/j.ress.2020.107130","article-title":"Performance analysis and availability optimization to improve maintenance schedule for the turbo-generator subsystem of a thermal power plant using particle swarm optimization","volume":"204","author":"Jagtap","year":"2020","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2026.112251_bib0002","doi-asserted-by":"crossref","DOI":"10.1016\/j.ress.2019.106505","article-title":"A DBN based reactive maintenance model for a complex system in thermal power plants","volume":"190","author":"\u00d6zg\u00fcr-\u00dcnl\u00fcak\u0131n","year":"2019","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2026.112251_bib0003","author":"Pintelon","year":"2013","journal-title":"Asset management. The maintenance perspective"},{"key":"10.1016\/j.ress.2026.112251_bib0004","doi-asserted-by":"crossref","DOI":"10.1115\/1.4055962","article-title":"Joint optimization of maintenance and spare parts inventory for multi-unit systems with a generalized structure","volume":"145","author":"Yan","year":"2023","journal-title":"J Manuf Sci Eng"},{"key":"10.1016\/j.ress.2026.112251_bib0005","doi-asserted-by":"crossref","DOI":"10.1016\/j.ress.2022.108375","article-title":"Statistical modeling and reliability analysis of multiple repairable systems with dependent failure times under perfect repair","volume":"222","author":"Brito","year":"2022","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2026.112251_bib0006","first-page":"3","article-title":"Reliability analysis and selective maintenance for multistate queueing system","volume":"236","author":"Tang","year":"2022","journal-title":"Proc Inst Mech Eng O: J Risk Reliab"},{"key":"10.1016\/j.ress.2026.112251_bib0007","doi-asserted-by":"crossref","first-page":"377","DOI":"10.1007\/s42524-024-0145-3","article-title":"Allocating redundancy, maintenance and spare parts for minimizing system cost under decentralized repairs","volume":"11","author":"Jin","year":"2024","journal-title":"Front Eng Manag"},{"key":"10.1016\/j.ress.2026.112251_bib0008","doi-asserted-by":"crossref","DOI":"10.1016\/j.ress.2023.109719","article-title":"Modeling offshore wind farm disturbances and maintenance service responses within the scope of resilience","volume":"242","author":"Niemi","year":"2024","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2026.112251_bib0009","doi-asserted-by":"crossref","DOI":"10.1016\/j.ress.2023.109450","article-title":"A human operator model for simulation-based resilience assessment of power grid restoration operations","volume":"238","author":"Kottmann","year":"2023","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2026.112251_bib0010","doi-asserted-by":"crossref","DOI":"10.1016\/j.ress.2023.109240","article-title":"A joint age-based system replacement and component reallocation maintenance policy: Optimization, analysis and resilience","volume":"235","author":"Fu","year":"2023","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2026.112251_bib0011","doi-asserted-by":"crossref","first-page":"499","DOI":"10.1016\/j.ijpe.2012.04.001","article-title":"Joint maintenance and inventory optimization systems: A review","volume":"143","author":"Van Horenbeek","year":"2013","journal-title":"Int J Prod Econ"},{"key":"10.1016\/j.ress.2026.112251_bib0012","doi-asserted-by":"crossref","DOI":"10.1016\/j.ress.2023.109700","article-title":"Multi-level maintenance and inventory joint optimization for a k-out-of-n hyper-system considering the selection of suppliers with incentive discount policies","volume":"241","author":"Xia","year":"2024","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2026.112251_bib0013","doi-asserted-by":"crossref","DOI":"10.1016\/j.ress.2023.109487","article-title":"Maintenance optimization for a production system subject to shocks considering a buffer inventory and production defects","volume":"238","author":"Gan","year":"2023","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2026.112251_bib0014","doi-asserted-by":"crossref","DOI":"10.1016\/j.ress.2019.106579","article-title":"Using a novel hierarchical coloured Petri net to model and optimise fleet spare inventory, cannibalisation and preventive maintenance","volume":"191","author":"Sheng","year":"2019","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2026.112251_bib0015","doi-asserted-by":"crossref","first-page":"122","DOI":"10.1287\/opre.16.1.122","article-title":"METRIC: A multi-echelon technique for recoverable item control","volume":"16","author":"Sherbrooke","year":"1968","journal-title":"Oper Res"},{"key":"10.1016\/j.ress.2026.112251_bib0016","doi-asserted-by":"crossref","first-page":"311","DOI":"10.1287\/opre.34.2.311","article-title":"VARI-METRIC: Improved approximations for multi-indenture, multi-echelon availability models","volume":"34","author":"Sherbrooke","year":"1986","journal-title":"Oper Res"},{"key":"10.1016\/j.ress.2026.112251_bib0017","doi-asserted-by":"crossref","first-page":"95","DOI":"10.1016\/j.ress.2013.05.006","article-title":"Multi-echelon, multi-indenture spare parts inventory control subject to system availability and budget constraints","volume":"119","author":"Costantino","year":"2013","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2026.112251_bib0018","article-title":"Dedicated maintenance and repair shop control for spare parts networks","author":"Kouki","year":"2025","journal-title":"Eur J Oper Res"},{"key":"10.1016\/j.ress.2026.112251_bib0019","doi-asserted-by":"crossref","DOI":"10.1016\/j.cie.2020.106514","article-title":"A discrete-event simulation algorithm for the optimization of multi-scenario maintenance policies","volume":"145","author":"Golbasi","year":"2020","journal-title":"Comput Ind Eng"},{"key":"10.1016\/j.ress.2026.112251_bib0020","first-page":"281","article-title":"Preventive maintenance scheduling: a simulation-optimization approach","volume":"9","author":"Darmawan","year":"2021","journal-title":"Prod Manuf Res"},{"key":"10.1016\/j.ress.2026.112251_bib0021","series-title":"Simulation with Arena","author":"Kelton","year":"2015"},{"key":"10.1016\/j.ress.2026.112251_bib0022","doi-asserted-by":"crossref","first-page":"321","DOI":"10.1007\/s10951-021-00718-2","article-title":"Plant shutdown maintenance workforce team assignment and job scheduling","volume":"25","author":"Alfares","year":"2022","journal-title":"J Sched"},{"key":"10.1016\/j.ress.2026.112251_bib0023","doi-asserted-by":"crossref","first-page":"6248","DOI":"10.3390\/en17246248","article-title":"Life cycle greenhouse gas reduction effects induced by turbocharger multiple remanufacturing in South Korea","volume":"17","author":"Kim","year":"2024","journal-title":"Energies (Basel)"},{"key":"10.1016\/j.ress.2026.112251_bib0024","first-page":"83","article-title":"Joint maintenance and spare-parts inventory models: a review and discussion of practical stock-keeping rules","volume":"35","author":"Scarf","year":"2024","journal-title":"IMA J Manag Math"},{"key":"10.1016\/j.ress.2026.112251_bib0025","doi-asserted-by":"crossref","first-page":"236","DOI":"10.1016\/j.cie.2016.01.008","article-title":"Optimising the complete care pathway for cerebrovascular accident patients","volume":"93","author":"Chemweno","year":"2016","journal-title":"Comput Ind Eng"},{"key":"10.1016\/j.ress.2026.112251_bib0026","doi-asserted-by":"crossref","first-page":"347","DOI":"10.1080\/09537287.2020.1736684","article-title":"Integrated maintenance policies for performance improvement of a multi-unit repairable, one product manufacturing system","volume":"32","author":"Wakiru","year":"2021","journal-title":"Prod Plan Control"},{"key":"10.1016\/j.ress.2026.112251_bib0027","series-title":"Verification and validation of simulation models","first-page":"166","author":"Sargent","year":"2010"},{"key":"10.1016\/j.ress.2026.112251_bib0028","doi-asserted-by":"crossref","DOI":"10.1016\/j.ress.2021.108197","article-title":"Critical project planning and spare parts inventory management in shutdown maintenance","volume":"219","author":"Zhu","year":"2022","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2026.112251_bib0029","series-title":"\u201eModel Development for Reliability Cannibalization\u201d","first-page":"129","author":"Mangara","year":"2017"},{"key":"10.1016\/j.ress.2026.112251_bib0030","doi-asserted-by":"crossref","first-page":"1336","DOI":"10.1007\/s13198-018-0748-3","article-title":"Research on optimization of spare parts inventory policy considering maintenance priority","volume":"9","author":"Chen","year":"2018","journal-title":"Int J Syst Assur Eng Manag"},{"key":"10.1016\/j.ress.2026.112251_bib0031","doi-asserted-by":"crossref","first-page":"510","DOI":"10.1177\/00202940231207709","article-title":"Research on imperfect condition-based maintenance strategy based on accelerated degradation process","volume":"57","author":"Chen","year":"2024","journal-title":"Meas Control"},{"key":"10.1016\/j.ress.2026.112251_bib0032","doi-asserted-by":"crossref","first-page":"447","DOI":"10.1108\/JQME-02-2025-0011","article-title":"A novel maintenance policy for multi-component systems under imperfect maintenance","volume":"31","author":"Qi","year":"2025","journal-title":"J Qual Maint Eng"},{"key":"10.1016\/j.ress.2026.112251_bib0033","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1007\/s13198-024-02617-z","article-title":"Maintenance optimization based on modified FMECA: a case study applied to a spinning factory","volume":"16","author":"ElKasrawy","year":"2025","journal-title":"Int J Syst Assur Eng Manag"},{"key":"10.1016\/j.ress.2026.112251_bib0034","doi-asserted-by":"crossref","first-page":"93","DOI":"10.14445\/22315381\/IJETT-V72I1P110","article-title":"Criticality Analysis of Electromechanical Equipment Maintenance. A Case Study in Sasol Synfuels Catalyst Preparation Unit","volume":"72","author":"Maphosa","year":"2024","journal-title":"Int J Eng Trends Technol"},{"key":"10.1016\/j.ress.2026.112251_bib0035","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1504\/IJRS.2025.143779","article-title":"Joint sequential decision of maintenance and spare parts inventory for multi-unit repairable systems","volume":"19","author":"Zhang","year":"2025","journal-title":"Int J Reliab Saf"},{"key":"10.1016\/j.ress.2026.112251_bib0036","doi-asserted-by":"crossref","first-page":"820","DOI":"10.37394\/23207.2024.21.69","article-title":"Evaluating the Impact of Transitioning Maintenance Strategy from Reactive to Proactive in Power Generation Companies: An Empirical Analysis","volume":"21","author":"Shehadeh","year":"2024","journal-title":"WSEAS Trans Bus Econ"},{"key":"10.1016\/j.ress.2026.112251_bib0037","first-page":"10","article-title":"Maintenance costs and advanced maintenance techniques in manufacturing machinery: Survey and analysis","volume":"12","author":"Thomas","year":"2021","journal-title":"Int J Progn Health Manag"}],"container-title":["Reliability Engineering &amp; System Safety"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0951832026000670?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0951832026000670?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2026,3,12]],"date-time":"2026-03-12T21:46:27Z","timestamp":1773351987000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0951832026000670"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2026,7]]},"references-count":37,"alternative-id":["S0951832026000670"],"URL":"https:\/\/doi.org\/10.1016\/j.ress.2026.112251","relation":{},"ISSN":["0951-8320"],"issn-type":[{"value":"0951-8320","type":"print"}],"subject":[],"published":{"date-parts":[[2026,7]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Simulating the impact of varying maintenance interventions on asset performance and spare part provisioning in a multi-echelon replenishment system","name":"articletitle","label":"Article Title"},{"value":"Reliability Engineering & System Safety","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.ress.2026.112251","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"\u00a9 2026 The Authors. Published by Elsevier Ltd.","name":"copyright","label":"Copyright"}],"article-number":"112251"}}