{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,8]],"date-time":"2026-06-08T21:58:42Z","timestamp":1780955922353,"version":"3.54.1"},"reference-count":38,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2026,11,1]],"date-time":"2026-11-01T00:00:00Z","timestamp":1793491200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2026,11,1]],"date-time":"2026-11-01T00:00:00Z","timestamp":1793491200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/legal\/tdmrep-license"},{"start":{"date-parts":[[2026,11,1]],"date-time":"2026-11-01T00:00:00Z","timestamp":1793491200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-017"},{"start":{"date-parts":[[2026,11,1]],"date-time":"2026-11-01T00:00:00Z","timestamp":1793491200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-037"},{"start":{"date-parts":[[2026,11,1]],"date-time":"2026-11-01T00:00:00Z","timestamp":1793491200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-012"},{"start":{"date-parts":[[2026,11,1]],"date-time":"2026-11-01T00:00:00Z","timestamp":1793491200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-029"},{"start":{"date-parts":[[2026,11,1]],"date-time":"2026-11-01T00:00:00Z","timestamp":1793491200000},"content-version":"stm-asf","delay-in-days":0,"URL":"https:\/\/doi.org\/10.15223\/policy-004"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Reliability Engineering &amp; System Safety"],"published-print":{"date-parts":[[2026,11]]},"DOI":"10.1016\/j.ress.2026.112806","type":"journal-article","created":{"date-parts":[[2026,4,30]],"date-time":"2026-04-30T17:11:01Z","timestamp":1777569061000},"page":"112806","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":0,"special_numbering":"P2","title":["Stochastic reliability modeling of power supply chain for green hydrogen electrolyzers using Bayesian-CTMC"],"prefix":"10.1016","volume":"275","author":[{"ORCID":"https:\/\/orcid.org\/0009-0002-8828-0512","authenticated-orcid":false,"given":"Swati","family":"Swati","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Rakesh","family":"Gupta","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Pradeep","family":"Chaudhary","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"78","reference":[{"issue":"24","key":"10.1016\/j.ress.2026.112806_b1","doi-asserted-by":"crossref","first-page":"6599","DOI":"10.3390\/en13246599","article-title":"Can green hydrogen production be economically viable under current market conditions","volume":"13","author":"Jovan","year":"2020","journal-title":"Energies"},{"key":"10.1016\/j.ress.2026.112806_b2","first-page":"442","article-title":"The future of hydrogen: seizing today\u2019s opportunities","volume":"20","author":"Birol","year":"2019","journal-title":"IEA Rep Prep G"},{"issue":"19","key":"10.1016\/j.ress.2026.112806_b3","doi-asserted-by":"crossref","first-page":"3057","DOI":"10.3390\/math12193057","article-title":"Reliability and sensitivity analysis of wireless sensor network using a continuous-time Markov process","volume":"12","author":"Kumar","year":"2024","journal-title":"Mathematics"},{"key":"10.1016\/j.ress.2026.112806_b4","article-title":"Stochastic modeling and availability optimization of wireless sensor network through particle swarm optimization","author":"Jadhav","year":"2025","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2026.112806_b5","doi-asserted-by":"crossref","DOI":"10.1016\/j.ress.2023.109780","article-title":"Reliability analysis and redundancy optimization of k-out-of-n systems with random variable k using continuous time Markov chain and Monte Carlo simulation","volume":"242","author":"Oszczypa\u0142a","year":"2024","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2026.112806_b6","doi-asserted-by":"crossref","DOI":"10.1016\/j.ress.2025.111221","article-title":"Dynamic reliability and sensitivity analysis of weighted (k, r)-out-of-n cold standby system with multi-performance multi-state components","author":"Singh","year":"2025","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2026.112806_b7","doi-asserted-by":"crossref","first-page":"46","DOI":"10.1016\/j.ress.2018.09.020","article-title":"Reliability and availability analysis of standby systems with working vacations and retrial of failed components","volume":"182","author":"Yang","year":"2019","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2026.112806_b8","doi-asserted-by":"crossref","DOI":"10.1016\/j.ress.2022.108373","article-title":"Analysis of simplification in Markov state-based models for reliability assessment of complex safety systems","volume":"221","author":"Liang","year":"2022","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2026.112806_b9","doi-asserted-by":"crossref","DOI":"10.1016\/j.ress.2023.109706","article-title":"A subset simulation analysis framework for rapid reliability evaluation of series-parallel cold standby systems","volume":"241","author":"Lin","year":"2024","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2026.112806_b10","doi-asserted-by":"crossref","DOI":"10.1016\/j.ress.2019.106516","article-title":"Reliability analysis of semi-Markov systems with restriction on transition times","volume":"190","author":"Wu","year":"2019","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.ress.2026.112806_b11","doi-asserted-by":"crossref","DOI":"10.1016\/j.ress.2020.107130","article-title":"Performance analysis and availability optimization to improve maintenance schedule for the turbo-generator subsystem of a thermal power plant using particle swarm optimization","volume":"204","author":"Jagtap","year":"2020","journal-title":"Reliab Eng Syst Saf"},{"issue":"5","key":"10.1016\/j.ress.2026.112806_b12","doi-asserted-by":"crossref","first-page":"2670","DOI":"10.1002\/qre.3097","article-title":"Stochastic modeling and availability optimization of condenser used in steam turbine power plants using GA and PSO","volume":"38","author":"Saini","year":"2022","journal-title":"Qual Reliab Eng Int"},{"issue":"4","key":"10.1016\/j.ress.2026.112806_b13","doi-asserted-by":"crossref","first-page":"779","DOI":"10.1007\/s42452-020-2520-y","article-title":"Operational availability analysis of generators in steam turbine power plants","volume":"2","author":"Gupta","year":"2020","journal-title":"SN Appl Sci"},{"key":"10.1016\/j.ress.2026.112806_b14","doi-asserted-by":"crossref","DOI":"10.1016\/j.ress.2024.110778","article-title":"Mathematical modeling of solar farm performance degradation in a dynamic environment for condition-based maintenance","volume":"257","author":"Shen","year":"2025","journal-title":"Reliab Eng Syst Saf"},{"issue":"1","key":"10.1016\/j.ress.2026.112806_b15","first-page":"2261","article-title":"Availability evaluation of solar photovoltaic systems using markov modeling and cuckoo search algorithm","volume":"46","author":"Kumar","year":"2024","journal-title":"J Intell Fuzzy Systems"},{"key":"10.1016\/j.ress.2026.112806_b16","article-title":"A holistic approach to assessing reliability in green hydrogen supply chains using mixed methods","volume":"209","author":"Almaraz","year":"2024","journal-title":"Technol Forecast Soc Change"},{"key":"10.1016\/j.ress.2026.112806_b17","doi-asserted-by":"crossref","first-page":"360","DOI":"10.1016\/j.renene.2022.09.057","article-title":"Green hydrogen production: Analysis for different single or combined large-scale photovoltaic and wind renewable systems","volume":"200","author":"Mazzeo","year":"2022","journal-title":"Renew Energy"},{"key":"10.1016\/j.ress.2026.112806_b18","doi-asserted-by":"crossref","DOI":"10.1016\/j.enconman.2024.118907","article-title":"Green hydrogen production plants: A techno-economic review","volume":"319","author":"Abdelsalam","year":"2024","journal-title":"Energy Convers Manage"},{"key":"10.1016\/j.ress.2026.112806_b19","doi-asserted-by":"crossref","first-page":"608","DOI":"10.1016\/j.ijhydene.2024.11.129","article-title":"Technical failures in green hydrogen production and reliability engineering responses: Insights from database analysis and a literature review","volume":"94","author":"Tuhi","year":"2024","journal-title":"Int J Hydrog Energy"},{"issue":"43","key":"10.1016\/j.ress.2026.112806_b20","doi-asserted-by":"crossref","first-page":"24805","DOI":"10.1007\/s11356-025-36931-1","article-title":"Reliability engineering for safety prognostic using bayesian approach: a case study of a green hydrogen prototype","volume":"32","author":"Chafaa","year":"2025","journal-title":"Environ Sci Pollut Res"},{"key":"10.1016\/j.ress.2026.112806_b21","doi-asserted-by":"crossref","DOI":"10.1016\/j.ijhydene.2025.04.234","article-title":"Reliability analysis for hydrogen-integrated composite renewable power systems through AI-augmented Monte Carlo simulations","author":"Urgun","year":"2025","journal-title":"Int J Hydrog Energy"},{"key":"10.1016\/j.ress.2026.112806_b22","doi-asserted-by":"crossref","DOI":"10.1109\/ACCESS.2025.3567464","article-title":"Advances in composite power system reliability assessment: Trends and machine learning role","author":"Yarramsetty","year":"2025","journal-title":"IEEE Access"},{"key":"10.1016\/j.ress.2026.112806_b23","doi-asserted-by":"crossref","DOI":"10.1016\/j.enconman.2024.118485","article-title":"Enhancing the economic viability and reliability of renewables based electricity supply through power-to-gas-to-power with green hydrogen","volume":"310","author":"Park","year":"2024","journal-title":"Energy Convers Manage"},{"issue":"10","key":"10.1016\/j.ress.2026.112806_b24","doi-asserted-by":"crossref","first-page":"518","DOI":"10.1016\/j.ifacol.2025.09.089","article-title":"Reliability-based design optimization for green hydrogen production network","volume":"59","author":"Swift","year":"2025","journal-title":"IFAC-PapersOnLine"},{"key":"10.1016\/j.ress.2026.112806_b25","doi-asserted-by":"crossref","DOI":"10.1016\/j.enconman.2022.115695","article-title":"Techno-economic analysis and Monte Carlo simulation for green hydrogen production using offshore wind power plant","volume":"263","author":"Jang","year":"2022","journal-title":"Energy Convers Manage"},{"key":"10.1016\/j.ress.2026.112806_b26","first-page":"1","article-title":"Classical and Bayesian stochastic analysis of a complex system composed of series and parallel subsystem","author":"Swati","year":"2025","journal-title":"OPSEARCH"},{"issue":"1","key":"10.1016\/j.ress.2026.112806_b27","doi-asserted-by":"crossref","first-page":"41","DOI":"10.1016\/j.cja.2017.08.020","article-title":"A Bayesian approach for integrating multilevel priors and data for aerospace system reliability assessment","volume":"31","author":"Jian","year":"2018","journal-title":"Chin J Aeronaut"},{"key":"10.1016\/j.ress.2026.112806_b28","doi-asserted-by":"crossref","first-page":"247","DOI":"10.1016\/j.matcom.2017.09.001","article-title":"An availability-based system with general repair via Bayesian aspect","volume":"144","author":"Ke","year":"2018","journal-title":"Math Comput Simulation"},{"issue":"3","key":"10.1016\/j.ress.2026.112806_b29","doi-asserted-by":"crossref","first-page":"689","DOI":"10.1109\/TR.2013.2270424","article-title":"A Bayesian approach for system reliability analysis with multilevel pass-fail, lifetime and degradation data sets","volume":"62","author":"Peng","year":"2013","journal-title":"IEEE Trans Reliab"},{"issue":"1","key":"10.1016\/j.ress.2026.112806_b30","doi-asserted-by":"crossref","first-page":"172","DOI":"10.1007\/s13198-021-01188-7","article-title":"Some inferences on reliability measures of two-non-identical units cold standby system waiting for repair","volume":"13","author":"Patawa","year":"2022","journal-title":"Int J Syst Assur Eng Manag"},{"key":"10.1016\/j.ress.2026.112806_b31","first-page":"1","article-title":"Inferential stochastic analysis of three unit bridge configuration system model with lindley repair time distribution","author":"Swati","year":"2025","journal-title":"Life Cycle Reliab Saf Eng"},{"key":"10.1016\/j.ress.2026.112806_b32","doi-asserted-by":"crossref","first-page":"503","DOI":"10.1016\/j.matcom.2022.12.003","article-title":"Inferential study of single unit repairable system","volume":"206","author":"Patawa","year":"2023","journal-title":"Math Comput Simulation"},{"issue":"1","key":"10.1016\/j.ress.2026.112806_b33","doi-asserted-by":"crossref","DOI":"10.1080\/25742558.2018.1467208","article-title":"Stochastic outlook of two non-identical unit parallel system with priority in repair","volume":"5","author":"Pundir","year":"2018","journal-title":"Cogent Math Stat"},{"key":"10.1016\/j.ress.2026.112806_b34","series-title":"Introduction to probability models","author":"Ross","year":"2014"},{"issue":"12","key":"10.1016\/j.ress.2026.112806_b35","doi-asserted-by":"crossref","first-page":"7266","DOI":"10.1016\/j.ijhydene.2019.08.206","article-title":"Process design for green hydrogen production","volume":"45","author":"Mosca","year":"2020","journal-title":"Int J Hydrog Energy"},{"key":"10.1016\/j.ress.2026.112806_b36","series-title":"IEEE power engineering society summer meeting","first-page":"650","article-title":"Overview of 1366-2001 the full use guide on electric power distribution reliability indices","volume":"2","author":"Warren","year":"2002"},{"key":"10.1016\/j.ress.2026.112806_b37","series-title":"Final report of the 2004\u20132007 international enquiry on reliability of high voltage equipment","author":"A3.06","year":"2010"},{"key":"10.1016\/j.ress.2026.112806_b38","series-title":"Proceedings of the 2011 14th European conference on power electronics and applications","first-page":"1","article-title":"Power electronic converters in wind energy systems\u2014Considerations of reliability and strategies for increasing availability","author":"Boettcher","year":"2011"}],"container-title":["Reliability Engineering &amp; System Safety"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0951832026006174?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0951832026006174?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2026,6,8]],"date-time":"2026-06-08T21:12:39Z","timestamp":1780953159000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0951832026006174"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2026,11]]},"references-count":38,"alternative-id":["S0951832026006174"],"URL":"https:\/\/doi.org\/10.1016\/j.ress.2026.112806","relation":{},"ISSN":["0951-8320"],"issn-type":[{"value":"0951-8320","type":"print"}],"subject":[],"published":{"date-parts":[[2026,11]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Stochastic reliability modeling of power supply chain for green hydrogen electrolyzers using Bayesian-CTMC","name":"articletitle","label":"Article Title"},{"value":"Reliability Engineering & System Safety","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.ress.2026.112806","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"\u00a9 2026 Elsevier Ltd. All rights are reserved, including those for text and data mining, AI training, and similar technologies.","name":"copyright","label":"Copyright"}],"article-number":"112806"}}