{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,12,5]],"date-time":"2024-12-05T17:10:07Z","timestamp":1733418607994,"version":"3.30.1"},"reference-count":16,"publisher":"Elsevier BV","issue":"4","license":[{"start":{"date-parts":[[2001,7,1]],"date-time":"2001-07-01T00:00:00Z","timestamp":993945600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Computers &amp; Electrical Engineering"],"published-print":{"date-parts":[[2001,7]]},"DOI":"10.1016\/s0045-7906(00)00023-9","type":"journal-article","created":{"date-parts":[[2002,7,25]],"date-time":"2002-07-25T22:04:50Z","timestamp":1027634690000},"page":"323-332","source":"Crossref","is-referenced-by-count":0,"title":["Economic implications of non-utility generation on composite generation and transmission system"],"prefix":"10.1016","volume":"27","author":[{"given":"R.","family":"Gupta","sequence":"first","affiliation":[]},{"given":"L.","family":"Goel","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/S0045-7906(00)00023-9_BIB1","unstructured":"Smith DJ, Reynolds M. Utility adapt to growth of independent power. Power Engng 1988:22\u201328"},{"key":"10.1016\/S0045-7906(00)00023-9_BIB2","unstructured":"Smith DJ, Reynolds M. Independent power producers dominate new plant construction. Power Engng 1987:26\u201332"},{"key":"10.1016\/S0045-7906(00)00023-9_BIB3","unstructured":"Burns RE, Pollard W, Pryor T, Pike LM. The appropriateness and feasibility of various methods of calculating avoided costs. A Report, National Regulatory Research Institute, Ohio, 1982"},{"key":"10.1016\/S0045-7906(00)00023-9_BIB4","first-page":"251","article-title":"Significant issues facing the interconnection of independent power producers and the utility","volume":"52","author":"Koller","year":"1990","journal-title":"Proc Am Power Conf"},{"issue":"7","key":"10.1016\/S0045-7906(00)00023-9_BIB5","first-page":"19","article-title":"Strategies for an evolving generation industry","volume":"126","author":"Kee","year":"1990","journal-title":"Public Utility Fortnightly"},{"issue":"6","key":"10.1016\/S0045-7906(00)00023-9_BIB6","first-page":"17","article-title":"The birth of independent power","volume":"129","author":"Greenberger","year":"1992","journal-title":"Public Utility Fortnightly"},{"key":"10.1016\/S0045-7906(00)00023-9_BIB7","unstructured":"Ahner DJ, Kona C. Independent power production. how much and what mix. Proc Am Power Conf 1989:891\u20136"},{"issue":"6","key":"10.1016\/S0045-7906(00)00023-9_BIB8","doi-asserted-by":"crossref","first-page":"2784","DOI":"10.1109\/TPAS.1981.316392","article-title":"PURPA: new horizens for electric utilities and industry","volume":"100","author":"Harkins","year":"1981","journal-title":"IEEE Trans Power Appar Sys"},{"key":"10.1016\/S0045-7906(00)00023-9_BIB9","first-page":"259","article-title":"Transmission connection requirements for non-utility generators","volume":"52","author":"Donalek","year":"1990","journal-title":"Proc Am Power Conf"},{"issue":"1","key":"10.1016\/S0045-7906(00)00023-9_BIB10","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1109\/59.32472","article-title":"Avoided costs: ontario hydro's experience","volume":"4","author":"Shalaby","year":"1989","journal-title":"IEEE Trans Power Sys"},{"issue":"4","key":"10.1016\/S0045-7906(00)00023-9_BIB11","doi-asserted-by":"crossref","first-page":"993","DOI":"10.1109\/TPWRS.1987.4335291","article-title":"Avoided cost adjustments for nongenerating utilities","volume":"2","author":"Foreman","year":"1987","journal-title":"IEEE Trans Power Sys"},{"key":"10.1016\/S0045-7906(00)00023-9_BIB12","doi-asserted-by":"crossref","unstructured":"Billinton R, Adzanu S. Composite system reliability concepts in the evaluation of non-utility generation. IEEE-WESCANEX Conference Proceedings. 1995. p. 157\u2013162","DOI":"10.1109\/WESCAN.1995.493963"},{"issue":"4","key":"10.1016\/S0045-7906(00)00023-9_BIB13","doi-asserted-by":"crossref","first-page":"1754","DOI":"10.1109\/59.192992","article-title":"Integrating non-utility generation into the NEPOOL resource planning process","volume":"3","author":"Bentley","year":"1988","journal-title":"IEEE Trans Power Sys"},{"year":"1968","series-title":"Computer methods in power system analysis","author":"Stagg","key":"10.1016\/S0045-7906(00)00023-9_BIB14"},{"year":"1979","series-title":"Optimal economic operation of electric power system","author":"El-Hawary","key":"10.1016\/S0045-7906(00)00023-9_BIB15"},{"key":"10.1016\/S0045-7906(00)00023-9_BIB16","doi-asserted-by":"crossref","first-page":"1238","DOI":"10.1109\/59.32623","article-title":"A reliability test system for educational purposes-basic data","volume":"PWRS-4","author":"Billinton","year":"1989","journal-title":"IEEE Trans Power Sys"}],"container-title":["Computers &amp; Electrical Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0045790600000239?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0045790600000239?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2024,12,5]],"date-time":"2024-12-05T16:31:47Z","timestamp":1733416307000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0045790600000239"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2001,7]]},"references-count":16,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2001,7]]}},"alternative-id":["S0045790600000239"],"URL":"https:\/\/doi.org\/10.1016\/s0045-7906(00)00023-9","relation":{},"ISSN":["0045-7906"],"issn-type":[{"type":"print","value":"0045-7906"}],"subject":[],"published":{"date-parts":[[2001,7]]}}}