{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,7]],"date-time":"2026-02-07T21:11:39Z","timestamp":1770498699133,"version":"3.49.0"},"reference-count":16,"publisher":"Elsevier BV","issue":"1-3","license":[{"start":{"date-parts":[[2001,9,1]],"date-time":"2001-09-01T00:00:00Z","timestamp":999302400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2013,7,17]],"date-time":"2013-07-17T00:00:00Z","timestamp":1374019200000},"content-version":"vor","delay-in-days":4337,"URL":"https:\/\/www.elsevier.com\/open-access\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Discrete Applied Mathematics"],"published-print":{"date-parts":[[2001,9]]},"DOI":"10.1016\/s0166-218x(00)00316-4","type":"journal-article","created":{"date-parts":[[2002,7,25]],"date-time":"2002-07-25T17:07:57Z","timestamp":1027616877000},"page":"199-216","source":"Crossref","is-referenced-by-count":74,"title":["Makespan minimization for flow-shop problems with transportation times and a single robot"],"prefix":"10.1016","volume":"112","author":[{"given":"Johann","family":"Hurink","sequence":"first","affiliation":[]},{"given":"Sigrid","family":"Knust","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/S0166-218X(00)00316-4_BIB1","doi-asserted-by":"crossref","first-page":"952","DOI":"10.1287\/opre.45.6.952","article-title":"Cyclic scheduling of identical parts in a robotic cell","volume":"45","author":"Crama","year":"1997","journal-title":"Oper. Res."},{"key":"10.1016\/S0166-218X(00)00316-4_BIB2","unstructured":"Y. Crama, V. Kats, J. van de Klundert, E. Levner, Cyclic scheduling in robotic flowshops, Working paper (1997), Ann. Oper. Res., to appear."},{"key":"10.1016\/S0166-218X(00)00316-4_BIB3","unstructured":"G. Finke, C. Gueguen, N. Brauner, Robotic cells with buffer space, Conference Proceedings of ECCO IX, Dublin, 1996."},{"key":"10.1016\/S0166-218X(00)00316-4_BIB4","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1287\/moor.1.2.117","article-title":"The complexity of flow-shop and job-shop scheduling","volume":"1","author":"Garey","year":"1976","journal-title":"Math. Oper. Res."},{"key":"10.1016\/S0166-218X(00)00316-4_BIB5","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","article-title":"Optimization and approximation in deterministic sequencing and scheduling: a survey","volume":"5","author":"Graham","year":"1979","journal-title":"Ann. Discrete Math."},{"key":"10.1016\/S0166-218X(00)00316-4_BIB6","doi-asserted-by":"crossref","first-page":"421","DOI":"10.1287\/opre.45.3.421","article-title":"Scheduling in robotic cells: Classification, two and three machine cells","volume":"45","author":"Hall","year":"1997","journal-title":"Oper. Res."},{"key":"10.1016\/S0166-218X(00)00316-4_BIB7","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","article-title":"Optimal two- and three-stage production schedules with setup times included","volume":"1","author":"Johnson","year":"1954","journal-title":"Naval Res. Logist. Quart."},{"key":"10.1016\/S0166-218X(00)00316-4_BIB8","first-page":"354","article-title":"On an automated two-machine flowshop scheduling problem with infinite buffer","volume":"34","author":"Kise","year":"1991","journal-title":"J. Oper. Res. Soc. Japan"},{"key":"10.1016\/S0166-218X(00)00316-4_BIB9","doi-asserted-by":"crossref","first-page":"10","DOI":"10.1080\/07408179108963836","article-title":"Automated two-machine flowshop scheduling: a solvable case","volume":"23","author":"Kise","year":"1991","journal-title":"IIE Trans."},{"key":"10.1016\/S0166-218X(00)00316-4_BIB10","doi-asserted-by":"crossref","first-page":"343","DOI":"10.1016\/S0167-5060(08)70743-X","article-title":"Complexity of machine scheduling problems","volume":"1","author":"Lenstra","year":"1977","journal-title":"Ann. Discrete Math."},{"key":"10.1016\/S0166-218X(00)00316-4_BIB11","doi-asserted-by":"crossref","first-page":"217","DOI":"10.1007\/BF02099699","article-title":"Scheduling a two-machine robotic cell: a solvable case","volume":"57","author":"Levner","year":"1995","journal-title":"Ann. Oper. Res."},{"key":"10.1016\/S0166-218X(00)00316-4_BIB12","doi-asserted-by":"crossref","first-page":"293","DOI":"10.1287\/mnsc.5.3.293","article-title":"Sequencing n jobs on two machines with arbitrary time lags","volume":"5","author":"Mitten","year":"1958","journal-title":"Mg. Sci."},{"key":"10.1016\/S0166-218X(00)00316-4_BIB13","doi-asserted-by":"crossref","first-page":"609","DOI":"10.1057\/jors.1991.121","article-title":"Scheduling of a two-machine flowshop with travel time between machines","volume":"42","author":"Panwalkar","year":"1991","journal-title":"J. Opl. Res. Soc."},{"key":"10.1016\/S0166-218X(00)00316-4_BIB14","doi-asserted-by":"crossref","first-page":"331","DOI":"10.1007\/BF01324886","article-title":"Sequencing of parts and robot moves in a robotic cell","volume":"4","author":"Sethi","year":"1992","journal-title":"The Internat. J. Flexible Manuf. Systems"},{"key":"10.1016\/S0166-218X(00)00316-4_BIB15","doi-asserted-by":"crossref","first-page":"625","DOI":"10.1057\/jors.1990.86","article-title":"Scheduling parts in a combined production-transportation work cell","volume":"41","author":"Stern","year":"1990","journal-title":"J. Opl. Res. Soc."},{"key":"10.1016\/S0166-218X(00)00316-4_BIB16","unstructured":"W. Yu, The two-machine flow shop problem with delays and the one-machine total tardiness problem, Ph.D. Thesis, Technische Universiteit Eindhoven, 1996."}],"container-title":["Discrete Applied Mathematics"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0166218X00003164?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0166218X00003164?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,4,20]],"date-time":"2019-04-20T13:58:59Z","timestamp":1555768739000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0166218X00003164"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2001,9]]},"references-count":16,"journal-issue":{"issue":"1-3","published-print":{"date-parts":[[2001,9]]}},"alternative-id":["S0166218X00003164"],"URL":"https:\/\/doi.org\/10.1016\/s0166-218x(00)00316-4","relation":{},"ISSN":["0166-218X"],"issn-type":[{"value":"0166-218X","type":"print"}],"subject":[],"published":{"date-parts":[[2001,9]]}}}