{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,9,28]],"date-time":"2025-09-28T13:10:11Z","timestamp":1759065011480,"version":"3.44.0"},"reference-count":21,"publisher":"Elsevier BV","issue":"2","license":[{"start":{"date-parts":[[2002,10,1]],"date-time":"2002-10-01T00:00:00Z","timestamp":1033430400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"},{"start":{"date-parts":[[2002,10,1]],"date-time":"2002-10-01T00:00:00Z","timestamp":1033430400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/legal\/tdmrep-license"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Computers in Industry"],"published-print":{"date-parts":[[2002,10]]},"DOI":"10.1016\/s0166-3615(02)00095-7","type":"journal-article","created":{"date-parts":[[2002,10,16]],"date-time":"2002-10-16T10:33:39Z","timestamp":1034764419000},"page":"141-155","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":7,"title":["Karmarkar\u2019s and interaction\/prediction algorithms for hierarchical production planning for the highest business benefit"],"prefix":"10.1016","volume":"49","author":[{"given":"Hong-Sen","family":"Yan","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xiao-Dong","family":"Zhang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xu-Dong","family":"Ma","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/S0166-3615(02)00095-7_BIB1","doi-asserted-by":"crossref","first-page":"26","DOI":"10.1080\/07408179308964302","article-title":"Production planning and control hierarchy using a generic controller","volume":"25","author":"Davis","year":"1993","journal-title":"IIE Transactions"},{"key":"10.1016\/S0166-3615(02)00095-7_BIB2","doi-asserted-by":"crossref","unstructured":"G.R. Bitran, D. Tirupati, Hierarchical production planning, in: S.C. Graves, A.H.G. Rinnooy Kan, P.H. Zipkin (Eds.), Logistics of Production and Inventory, North-Holland, Amsterdam, 1993, pp. 523\u2013570.","DOI":"10.1016\/S0927-0507(05)80190-2"},{"key":"10.1016\/S0166-3615(02)00095-7_BIB3","unstructured":"H. Tsubone, An analytical model for hierarchical production planning, in: Proceedings of the Collection of Refereed Papers Presented at the 9th International Conference on Production Research, Cincinnati, OH, 1987, Elsevier, Amsterdam, 1988, pp. 216\u2013222."},{"key":"10.1016\/S0166-3615(02)00095-7_BIB4","unstructured":"U.S. Karmarkar, A hierarchical scheduling system for the CIM environment, in: Proceedings of the Collection of Refereed Papers Presented at the 9th International Conference on Production Research, Cincinnati, OH, 1987, Elsevier, Amsterdam, 1988, pp. 271\u2013277."},{"key":"10.1016\/S0166-3615(02)00095-7_BIB5","doi-asserted-by":"crossref","first-page":"407","DOI":"10.1016\/0360-8352(89)90159-9","article-title":"A gradient-based approach for solving hierarchical multi-criteria production planning problems","volume":"16","author":"Malakooti","year":"1989","journal-title":"Computers and Industrial Engineering"},{"key":"10.1016\/S0166-3615(02)00095-7_BIB6","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1016\/0360-8352(93)90226-N","article-title":"Production management of a steel manufacturing system: a hierarchical planning model","volume":"25","author":"Nguyen","year":"1993","journal-title":"Computers and Industrial Engineering"},{"key":"10.1016\/S0166-3615(02)00095-7_BIB7","doi-asserted-by":"crossref","first-page":"3023","DOI":"10.1080\/002075497194273","article-title":"Hierarchical production planning and scheduling in a multi-product, multi-machine environment","volume":"35","author":"Qiu","year":"1997","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0166-3615(02)00095-7_BIB8","doi-asserted-by":"crossref","unstructured":"A. Villa, Hierarchical architectures for production planning and control, in: Operations Research Models in Flexible Manufacturing Systems, Springer, Wien, 1989, pp. 261\u2013288.","DOI":"10.1007\/978-3-7091-2654-7_13"},{"key":"10.1016\/S0166-3615(02)00095-7_BIB9","doi-asserted-by":"crossref","first-page":"989","DOI":"10.1080\/07408170008967456","article-title":"Using aggregate estimation models for order acceptance in a decentralized production control structure for batch chemical manufacturing","volume":"32","author":"Raaymakers","year":"2000","journal-title":"IIE Transactions"},{"key":"10.1016\/S0166-3615(02)00095-7_BIB10","unstructured":"S.B. Gershwin, Manufacturing Systems Engineering, Prentice-Hall, Englewood Cliffs, 1994."},{"key":"10.1016\/S0166-3615(02)00095-7_BIB11","doi-asserted-by":"crossref","first-page":"309","DOI":"10.1016\/S0951-5240(97)00022-0","article-title":"An interaction\/prediction approach to hierarchical production planning and control with delay interaction equations","volume":"10","author":"Yan","year":"1997","journal-title":"Computer Integrated Manufacturing Systems"},{"key":"10.1016\/S0166-3615(02)00095-7_BIB12","doi-asserted-by":"crossref","first-page":"513","DOI":"10.1080\/095119298130543","article-title":"An interaction\/prediction approach to solving problems of hierarchical production planning in flexible automation workshops","volume":"11","author":"Yan","year":"1998","journal-title":"International Journal of Computer Integrated Manufacturing"},{"key":"10.1016\/S0166-3615(02)00095-7_BIB13","doi-asserted-by":"crossref","first-page":"147","DOI":"10.1080\/07408179708966322","article-title":"Modeling, scheduling and control of flexible manufacturing systems by extended high-level evaluation Petri nets","volume":"29","author":"Yan","year":"1997","journal-title":"IIE Transactions"},{"key":"10.1016\/S0166-3615(02)00095-7_BIB14","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1016\/S0736-5845(97)00019-7","article-title":"Modelling, scheduling and simulation of flexible manufacturing systems using extended high-level evaluation Petri nets","volume":"14","author":"Yan","year":"1998","journal-title":"Robotics and Computer Integrated Manufacturing"},{"key":"10.1016\/S0166-3615(02)00095-7_BIB15","doi-asserted-by":"crossref","first-page":"297","DOI":"10.1007\/BF01587095","article-title":"An implementation of Karmarkar\u2019s algorithm for linear programming","volume":"44","author":"Adler","year":"1989","journal-title":"Mathematical Programming"},{"key":"10.1016\/S0166-3615(02)00095-7_BIB16","unstructured":"R.H. Li, F.Q. Shao, Hierarchical and Decentralized Control of Large-Scale Systems, Xian Jiaotong University Press, Xian, 1987 (in Chinese)."},{"key":"10.1016\/S0166-3615(02)00095-7_BIB17","unstructured":"W.P. Yuan, L.M. Zhang, X.Q. Huang, Z.C. Wen, Numerical Analysis, Southeast University Press, Nanjing, Jiangsu, 1992 (in Chinese)."},{"key":"10.1016\/S0166-3615(02)00095-7_BIB18","unstructured":"J.G. Hu, Iterative Solution of Systems of Linear Algebraic Equations, Science Press, Beijing, 1991 (in Chinese)."},{"key":"10.1016\/S0166-3615(02)00095-7_BIB19","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1007\/BF01580724","article-title":"A polynomial-time algorithm, based on Newton\u2019s method, for linear programming","volume":"40","author":"Renegar","year":"1988","journal-title":"Mathematical Programming"},{"key":"10.1016\/S0166-3615(02)00095-7_BIB20","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1007\/BF01584845","article-title":"An interior point method, based on rank-1 updates, for linear programming","volume":"81","author":"Sturm","year":"1998","journal-title":"Mathematical Programming"},{"key":"10.1016\/S0166-3615(02)00095-7_BIB21","doi-asserted-by":"crossref","first-page":"339","DOI":"10.1007\/BF01580074","article-title":"A modified layered-step interior-point algorithm for linear programming","volume":"82","author":"Megiddo","year":"1998","journal-title":"Mathematical Programming"}],"container-title":["Computers in Industry"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0166361502000957?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0166361502000957?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2025,9,28]],"date-time":"2025-09-28T12:39:18Z","timestamp":1759063158000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0166361502000957"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2002,10]]},"references-count":21,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2002,10]]}},"alternative-id":["S0166361502000957"],"URL":"https:\/\/doi.org\/10.1016\/s0166-3615(02)00095-7","relation":{},"ISSN":["0166-3615"],"issn-type":[{"type":"print","value":"0166-3615"}],"subject":[],"published":{"date-parts":[[2002,10]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Karmarkar\u2019s and interaction\/prediction algorithms for hierarchical production planning for the highest business benefit","name":"articletitle","label":"Article Title"},{"value":"Computers in Industry","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/S0166-3615(02)00095-7","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"converted-article","name":"content_type","label":"Content Type"},{"value":"Copyright \u00a9 2002 Elsevier Science B.V. All rights reserved.","name":"copyright","label":"Copyright"}]}}