{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,21]],"date-time":"2026-01-21T03:42:37Z","timestamp":1768966957890,"version":"3.49.0"},"reference-count":17,"publisher":"Elsevier BV","issue":"11","license":[{"start":{"date-parts":[[2001,9,1]],"date-time":"2001-09-01T00:00:00Z","timestamp":999302400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Computers &amp; Operations Research"],"published-print":{"date-parts":[[2001,9]]},"DOI":"10.1016\/s0305-0548(00)00030-7","type":"journal-article","created":{"date-parts":[[2002,12,10]],"date-time":"2002-12-10T21:10:39Z","timestamp":1039554639000},"page":"1093-1110","source":"Crossref","is-referenced-by-count":43,"title":["Simultaneous determination of the optimal production\u2013inventory and product inspection policies for a deteriorating production system"],"prefix":"10.1016","volume":"28","author":[{"given":"Chih-Hsiung","family":"Wang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Shey-Heui","family":"Sheu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/S0305-0548(00)00030-7_BIB1","doi-asserted-by":"crossref","first-page":"48","DOI":"10.1080\/07408178608975329","article-title":"Economic production cycles with imperfect production process","volume":"18","author":"Rosenblatt","year":"1986","journal-title":"IIE Transactions"},{"key":"10.1016\/S0305-0548(00)00030-7_BIB2","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1287\/opre.34.1.137","article-title":"Optimal lot sizing, process quality improvement and setup cost reduction","volume":"34","author":"Porteus","year":"1986","journal-title":"Operations Researches"},{"key":"10.1016\/S0305-0548(00)00030-7_BIB3","doi-asserted-by":"crossref","first-page":"423","DOI":"10.1002\/(SICI)1520-6750(199806)45:4<423::AID-NAV8>3.0.CO;2-7","article-title":"Note: the economic manufacturing lot-sizing problem with imperfect production process: bounds and optimal solutions","volume":"45","author":"Hariga","year":"1998","journal-title":"Naval Research Logistics"},{"issue":"9","key":"10.1016\/S0305-0548(00)00030-7_BIB4","doi-asserted-by":"crossref","first-page":"1125","DOI":"10.1287\/mnsc.33.9.1125","article-title":"Simultaneous determination of production cycle and inspection schedules in a production system","volume":"33","author":"Lee","year":"1987","journal-title":"Management Science"},{"key":"10.1016\/S0305-0548(00)00030-7_BIB5","doi-asserted-by":"crossref","first-page":"368","DOI":"10.1080\/07408178908966243","article-title":"A production and maintenance planning model with restoration cost dependent on detection delay","volume":"21","author":"Lee","year":"1989","journal-title":"IIE Transactions"},{"issue":"2","key":"10.1016\/S0305-0548(00)00030-7_BIB6","first-page":"73","article-title":"Optimal inspection schedule in the imperfect production system under general shift distribution","volume":"8","author":"Lin","year":"1991","journal-title":"Journal of the Chinese Institute of Industrial Engineers"},{"key":"10.1016\/S0305-0548(00)00030-7_BIB7","doi-asserted-by":"crossref","first-page":"687","DOI":"10.1080\/15458830.1996.11770713","article-title":"Optimal preventive maintenance policy for deteriorating production systems","volume":"28","author":"Tseng","year":"1996","journal-title":"IIE Transactions"},{"issue":"2","key":"10.1016\/S0305-0548(00)00030-7_BIB8","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1080\/07408179408966595","article-title":"The effects of inspection errors to the imperfect EMQ model","volume":"26","author":"Liou","year":"1994","journal-title":"IIE Transactions"},{"key":"10.1016\/S0305-0548(00)00030-7_BIB9","doi-asserted-by":"crossref","first-page":"66","DOI":"10.1057\/palgrave.jors.2600484","article-title":"An EMQ model with inspections and random machine failures","volume":"49","author":"Makis","year":"1998","journal-title":"Journal of Operational Research Society"},{"key":"10.1016\/S0305-0548(00)00030-7_BIB10","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1002\/(SICI)1520-6750(199803)45:2<165::AID-NAV3>3.0.CO;2-6","article-title":"Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections","volume":"45","author":"Makis","year":"1998","journal-title":"Naval Research Logistics"},{"key":"10.1016\/S0305-0548(00)00030-7_BIB11","doi-asserted-by":"crossref","first-page":"319","DOI":"10.1002\/(SICI)1520-6750(199604)43:3<319::AID-NAV1>3.0.CO;2-C","article-title":"Optimal number of minimal repairs before replacement of a system subject to shocks","volume":"43","author":"Sheu","year":"1996","journal-title":"Naval Research Logistics"},{"key":"10.1016\/S0305-0548(00)00030-7_BIB12","doi-asserted-by":"crossref","first-page":"345","DOI":"10.1016\/S0377-2217(97)00051-9","article-title":"A generalized age and block replacement of a system subject to shocks","volume":"108","author":"Sheu","year":"1998","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0305-0548(00)00030-7_BIB13","doi-asserted-by":"crossref","first-page":"503","DOI":"10.1016\/S0377-2217(97)00400-1","article-title":"Extended optimal replacement model for deteriorating systems","volume":"112","author":"Sheu","year":"1999","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0305-0548(00)00030-7_BIB14","doi-asserted-by":"crossref","first-page":"191","DOI":"10.1016\/S0925-5273(98)00059-0","article-title":"Imperfect maintenance for deteriorating production systems","volume":"55","author":"Tseng","year":"1998","journal-title":"International Journal of Production Economics"},{"key":"10.1016\/S0305-0548(00)00030-7_BIB15","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1016\/0925-5273(92)90114-M","article-title":"Optimal production policy for a single-product single-machine problem with intermediate machine inspection allowed","volume":"28","author":"Sung","year":"1992","journal-title":"International Journal of Production Economics"},{"issue":"9","key":"10.1016\/S0305-0548(00)00030-7_BIB16","doi-asserted-by":"crossref","first-page":"775","DOI":"10.1057\/jors.1991.148","article-title":"Joint determination of production cycle and inspection intervals in a deteriorating production system","volume":"42","author":"Lee","year":"1992","journal-title":"Journal of Operational Research Society"},{"issue":"5","key":"10.1016\/S0305-0548(00)00030-7_BIB17","doi-asserted-by":"crossref","first-page":"300","DOI":"10.1109\/TR.1975.5214915","article-title":"The discrete Weibull distribution","volume":"R-24","author":"Nakagawa","year":"1975","journal-title":"IEEE Transactions on Reliability"}],"container-title":["Computers &amp; Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0305054800000307?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0305054800000307?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,4,26]],"date-time":"2019-04-26T00:22:03Z","timestamp":1556238123000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0305054800000307"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2001,9]]},"references-count":17,"journal-issue":{"issue":"11","published-print":{"date-parts":[[2001,9]]}},"alternative-id":["S0305054800000307"],"URL":"https:\/\/doi.org\/10.1016\/s0305-0548(00)00030-7","relation":{},"ISSN":["0305-0548"],"issn-type":[{"value":"0305-0548","type":"print"}],"subject":[],"published":{"date-parts":[[2001,9]]}}}