{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,4,4]],"date-time":"2022-04-04T22:55:10Z","timestamp":1649112910196},"reference-count":12,"publisher":"Elsevier BV","issue":"9","license":[{"start":{"date-parts":[[2002,8,1]],"date-time":"2002-08-01T00:00:00Z","timestamp":1028160000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Computers &amp; Operations Research"],"published-print":{"date-parts":[[2002,8]]},"DOI":"10.1016\/s0305-0548(01)00024-7","type":"journal-article","created":{"date-parts":[[2002,7,25]],"date-time":"2002-07-25T06:37:07Z","timestamp":1027579027000},"page":"1195-1206","source":"Crossref","is-referenced-by-count":6,"title":["Scheduling one-part-type serial manufacturing system under periodic demand: a solvable case"],"prefix":"10.1016","volume":"29","author":[{"given":"Konstantin","family":"Kogan","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Sheldon X.C.","family":"Lou","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"issue":"4","key":"10.1016\/S0305-0548(01)00024-7_BIB1","doi-asserted-by":"crossref","first-page":"353","DOI":"10.1080\/05695558308974659","article-title":"An algorithm for the computer control of a flexible manufacturing system","volume":"15","author":"Kimemia","year":"1983","journal-title":"IIE Transactions"},{"key":"10.1016\/S0305-0548(01)00024-7_BIB2","doi-asserted-by":"crossref","first-page":"343","DOI":"10.1007\/BF01439152","article-title":"A maximum principle based method for scheduling in flexible manufacturing system","volume":"5","author":"Khmelnitsky","year":"1995","journal-title":"Discrete Event Dynamic Systems"},{"key":"10.1016\/S0305-0548(01)00024-7_BIB3","doi-asserted-by":"crossref","first-page":"227","DOI":"10.1023\/A:1018933012422","article-title":"DGAP \u2014 the dynamic generalized assignment problem","volume":"69","author":"Kogan","year":"1997","journal-title":"Annals of Operations Research"},{"key":"10.1016\/S0305-0548(01)00024-7_BIB4","unstructured":"Caramanis M, Sharifnia A, Hu J, Gershwin S. Development of a science base for planning and scheduling manufacturing systems. Proceedings of the 1991 NSF Design and Manufacturing Systems Conference. Austin, Texas, 1991. p. 27\u201340."},{"key":"10.1016\/S0305-0548(01)00024-7_BIB5","series-title":"Discrete Event Systems. IMA Volumes in Mathematics and its Applications Series","doi-asserted-by":"crossref","first-page":"p73","DOI":"10.1007\/978-1-4613-9347-4_4","article-title":"Dynamic setup scheduling of flexible manufacturing systems: design and stability of near optimal general round robin policies","author":"Hu","year":"1995"},{"issue":"11","key":"10.1016\/S0305-0548(01)00024-7_BIB6","doi-asserted-by":"crossref","first-page":"1584","DOI":"10.1109\/9.728874","article-title":"One-machine n-part-type optimal set-up scheduling: analytical characterization of switching surfaces","volume":"43","author":"Khmelnitsky","year":"1998","journal-title":"IEEE Transactions on Automatic Control"},{"issue":"2","key":"10.1016\/S0305-0548(01)00024-7_BIB7","doi-asserted-by":"crossref","first-page":"183","DOI":"10.1007\/BF00121663","article-title":"Optimal production control of a dynamic two-product manufacturing system with setup costs and setup times","volume":"9","author":"Elhafsi","year":"1996","journal-title":"Journal of Global Optimization"},{"key":"10.1016\/S0305-0548(01)00024-7_BIB8","doi-asserted-by":"crossref","first-page":"70","DOI":"10.1109\/9.186313","article-title":"Periodicity and chaos from switched flow systems: contrasting examples of discretely controlled continuous systems","volume":"38","author":"Chase","year":"1993","journal-title":"IEEE Transactions on Automatic Control"},{"key":"10.1016\/S0305-0548(01)00024-7_BIB9","series-title":"Operations management","author":"Russell","year":"2000"},{"key":"10.1016\/S0305-0548(01)00024-7_BIB10","series-title":"Scheduling: theory, algorithms and systems","author":"Pinedo","year":"1995"},{"issue":"1","key":"10.1016\/S0305-0548(01)00024-7_BIB11","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1287\/opre.38.1.22","article-title":"Sequencing with earliness and tardiness penalties: a review","volume":"38","author":"Baker","year":"1990","journal-title":"Operations Research"},{"key":"10.1016\/S0305-0548(01)00024-7_BIB12","series-title":"Optimal flow control in manufacturing systems: production planning and scheduling","author":"Maimon","year":"1998"}],"container-title":["Computers &amp; Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0305054801000247?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0305054801000247?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,5,2]],"date-time":"2019-05-02T15:51:24Z","timestamp":1556812284000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0305054801000247"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2002,8]]},"references-count":12,"journal-issue":{"issue":"9","published-print":{"date-parts":[[2002,8]]}},"alternative-id":["S0305054801000247"],"URL":"https:\/\/doi.org\/10.1016\/s0305-0548(01)00024-7","relation":{},"ISSN":["0305-0548"],"issn-type":[{"value":"0305-0548","type":"print"}],"subject":[],"published":{"date-parts":[[2002,8]]}}}