{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,28]],"date-time":"2026-02-28T16:57:25Z","timestamp":1772297845811,"version":"3.50.1"},"reference-count":25,"publisher":"Elsevier BV","issue":"4","license":[{"start":{"date-parts":[[2003,4,1]],"date-time":"2003-04-01T00:00:00Z","timestamp":1049155200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Computers &amp; Operations Research"],"published-print":{"date-parts":[[2003,4]]},"DOI":"10.1016\/s0305-0548(01)00091-0","type":"journal-article","created":{"date-parts":[[2002,12,2]],"date-time":"2002-12-02T14:05:42Z","timestamp":1038837942000},"page":"483-490","source":"Crossref","is-referenced-by-count":119,"title":["An optimal production run time with imperfect production processes and allowable shortages"],"prefix":"10.1016","volume":"30","author":[{"given":"Kun-Jen","family":"Chung","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Kuo-Lung","family":"Hou","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/S0305-0548(01)00091-0_BIB1","doi-asserted-by":"crossref","first-page":"757","DOI":"10.1057\/jors.1988.131","article-title":"An integrated cost model for joint optimization of process control and maintenance","volume":"39","author":"Tagaras","year":"1988","journal-title":"Journal of the Operational Research Society"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB2","doi-asserted-by":"crossref","first-page":"532","DOI":"10.1287\/opre.36.4.532","article-title":"Optimality of zero-inventory policies for unreliable production facility","volume":"36","author":"Bielecki","year":"1988","journal-title":"Operations Research"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB3","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1080\/07408179208964201","article-title":"The analysis of a production line with unreliable machine and random processing times","volume":"24","author":"Hong","year":"1992","journal-title":"IIE Transactions"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB4","doi-asserted-by":"crossref","first-page":"104","DOI":"10.1287\/mnsc.38.1.104","article-title":"Production lot sizing with machine breakdowns","volume":"38","author":"Groenevelt","year":"1992","journal-title":"Management Science"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB5","doi-asserted-by":"crossref","first-page":"959","DOI":"10.1287\/opre.40.5.959","article-title":"Production batching with machine breakdowns and safety stocks","volume":"40","author":"Groenevelt","year":"1992","journal-title":"Operations Research"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB6","doi-asserted-by":"crossref","first-page":"139","DOI":"10.1016\/S0360-8352(96)00207-0","article-title":"Bounds for production lot sizing with machine breakdowns","volume":"32","author":"Chung","year":"1997","journal-title":"Computers and Industrial Engineering"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB7","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1016\/S0305-0548(98)00040-9","article-title":"Analysis of a production-inventory system with machine breakdowns and shutdowns","volume":"26","author":"Liu","year":"1999","journal-title":"Computers and Operations Research"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB8","doi-asserted-by":"crossref","first-page":"215","DOI":"10.1016\/S0925-5273(97)00013-3","article-title":"A extended EMQ model for a failure prone machine with general lifetime distribution","volume":"49","author":"Kim","year":"1997","journal-title":"International Journal of Production Economics"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB9","doi-asserted-by":"crossref","first-page":"537","DOI":"10.1080\/07408179908969857","article-title":"Optimal preventive maintenance in a production inventory system","volume":"31","author":"Das","year":"1999","journal-title":"IIE Transactions"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB10","doi-asserted-by":"crossref","first-page":"330","DOI":"10.1287\/opre.38.2.330","article-title":"Optimal maintenance policies for single-server queuing system subject to breakdowns","volume":"38","author":"Federgruen","year":"1990","journal-title":"Operations Research"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB11","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1287\/opre.42.1.111","article-title":"Production\u2013inventory systems with unreliable machines","volume":"42","author":"Berg","year":"1994","journal-title":"Operations Research"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB12","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1287\/opre.34.1.137","article-title":"Optimal lot sizing, process quality improvement and setup cost reduction","volume":"34","author":"Porteus","year":"1986","journal-title":"Operations Research"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB13","doi-asserted-by":"crossref","first-page":"48","DOI":"10.1080\/07408178608975329","article-title":"Economic production cycle with imperfect production processes","volume":"18","author":"Rosenblatt","year":"1986","journal-title":"IIE Transactions"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB14","doi-asserted-by":"crossref","first-page":"1125","DOI":"10.1287\/mnsc.33.9.1125","article-title":"Simultaneous determination of production cycle and inspection schedules in a production system","volume":"33","author":"Lee","year":"1987","journal-title":"Management Science"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB15","doi-asserted-by":"crossref","first-page":"775","DOI":"10.1057\/jors.1991.148","article-title":"Joint determination of production cycle and inspection intervals in a deteriorating production system","volume":"42","author":"Lee","year":"1991","journal-title":"Journal of the Operational Research Society"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB16","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1080\/07408179408966595","article-title":"The effects of inspection errors to the imperfect EMQ model","volume":"26","author":"Liou","year":"1994","journal-title":"IIE Transactions"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB17","doi-asserted-by":"crossref","first-page":"687","DOI":"10.1080\/15458830.1996.11770713","article-title":"Optimal preventive maintenance policy for deteriorating production systems","volume":"28","author":"Tseng","year":"1996","journal-title":"IIE Transactions"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB18","doi-asserted-by":"crossref","first-page":"941","DOI":"10.1080\/15458830.1996.11770747","article-title":"Optimal demand rate, lot sizing, and process reliability improvement decisions","volume":"28","author":"Lee","year":"1996","journal-title":"IIE Transactions"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB19","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1002\/(SICI)1520-6750(199803)45:2<165::AID-NAV3>3.0.CO;2-6","article-title":"Optimal lot sizing and inspection policy for EMQ model with imperfect inspections","volume":"45","author":"Makis","year":"1998","journal-title":"Naval Research Logistics Quarterly"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB20","doi-asserted-by":"crossref","first-page":"491","DOI":"10.1080\/07408179908969852","article-title":"Integrated production maintenance and quality model for imperfect processes","volume":"31","author":"Ben-Daya","year":"1999","journal-title":"IIE Transactions"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB21","first-page":"83","article-title":"An optimal production run length in deteriorating production processes","volume":"58","author":"Kim","year":"1999","journal-title":"International Journal of Production Economics"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB22","doi-asserted-by":"crossref","first-page":"713","DOI":"10.1057\/jors.1991.137","article-title":"EPQ with process capability and quality assurance considerations","volume":"42","author":"Cheng","year":"1991","journal-title":"Journal of the Operational Research Society"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB23","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1080\/07408179108963838","article-title":"An economic order quantity model with demand-dependent unit production cost and imperfect production processes","volume":"23","author":"Cheng","year":"1991","journal-title":"IIE Transactions"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB24","doi-asserted-by":"crossref","first-page":"1405","DOI":"10.1057\/jors.1994.217","article-title":"Economic production lot size model with variable production rate and imperfect quality","volume":"45","author":"Khouja","year":"1994","journal-title":"Journal of the Operational Research Society"},{"key":"10.1016\/S0305-0548(01)00091-0_BIB25","series-title":"Calculus with Analytic Geometry","author":"Purcell","year":"1987"}],"container-title":["Computers &amp; Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0305054801000910?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0305054801000910?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,5,3]],"date-time":"2019-05-03T11:55:56Z","timestamp":1556884556000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0305054801000910"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2003,4]]},"references-count":25,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2003,4]]}},"alternative-id":["S0305054801000910"],"URL":"https:\/\/doi.org\/10.1016\/s0305-0548(01)00091-0","relation":{},"ISSN":["0305-0548"],"issn-type":[{"value":"0305-0548","type":"print"}],"subject":[],"published":{"date-parts":[[2003,4]]}}}