{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,26]],"date-time":"2026-01-26T15:40:12Z","timestamp":1769442012822,"version":"3.49.0"},"reference-count":14,"publisher":"Elsevier BV","issue":"12","license":[{"start":{"date-parts":[[2004,10,1]],"date-time":"2004-10-01T00:00:00Z","timestamp":1096588800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Computers &amp; Operations Research"],"published-print":{"date-parts":[[2004,10]]},"DOI":"10.1016\/s0305-0548(03)00165-5","type":"journal-article","created":{"date-parts":[[2003,6,20]],"date-time":"2003-06-20T22:47:16Z","timestamp":1056149236000},"page":"2063-2078","source":"Crossref","is-referenced-by-count":28,"title":["Scheduling for two-stage production system with setup and assembly operations"],"prefix":"10.1016","volume":"31","author":[{"given":"Masao","family":"Yokoyama","sequence":"first","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/S0305-0548(03)00165-5_BIB1","doi-asserted-by":"crossref","first-page":"375","DOI":"10.1080\/00207548408942460","article-title":"A comparative study of priority dispatching rules in a hybrid assembly\/job shop","volume":"22","author":"Huan","year":"1984","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0305-0548(03)00165-5_BIB2","doi-asserted-by":"crossref","first-page":"671","DOI":"10.1080\/00207548908942575","article-title":"The effect of product structure and sequencing rule on assembly shop performance","volume":"27","author":"Fry","year":"1989","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0305-0548(03)00165-5_BIB3","doi-asserted-by":"crossref","first-page":"739","DOI":"10.1080\/00207549108930099","article-title":"A preliminary investigation of multi-attribute based sequencing rules for assembly shops","volume":"29","author":"Philipoon","year":"1991","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0305-0548(03)00165-5_BIB4","doi-asserted-by":"crossref","first-page":"1275","DOI":"10.1080\/00207549308956791","article-title":"Scheduling for machining and assembly in a job-shop environment","volume":"31","author":"Doctor","year":"1993","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0305-0548(03)00165-5_BIB5","doi-asserted-by":"crossref","first-page":"2315","DOI":"10.1080\/002075498192922","article-title":"Minimizing production flow time in a process and assembly job shop","volume":"36","author":"McKoy","year":"1998","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0305-0548(03)00165-5_BIB6","doi-asserted-by":"crossref","first-page":"1369","DOI":"10.1080\/00207549008942799","article-title":"Analysis of material flow in a job shop with assembly operations","volume":"28","author":"Cheng","year":"1990","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0305-0548(03)00165-5_BIB7","doi-asserted-by":"crossref","first-page":"616","DOI":"10.1287\/mnsc.39.5.616","article-title":"Minimizing makespan in the 3-machine assembly-type flowshop scheduling problem","volume":"39","author":"Lee","year":"1993","journal-title":"Management Science"},{"key":"10.1016\/S0305-0548(03)00165-5_BIB8","doi-asserted-by":"crossref","first-page":"346","DOI":"10.1287\/opre.43.2.346","article-title":"The two-stage assembly scheduling problem","volume":"43","author":"Potts","year":"1995","journal-title":"Operations Research"},{"key":"10.1016\/S0305-0548(03)00165-5_BIB9","doi-asserted-by":"crossref","first-page":"547","DOI":"10.1016\/S0377-2217(96)00312-8","article-title":"A branch and bound algorithm for the two-stage assembly scheduling problem","volume":"103","author":"Hariri","year":"1997","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0305-0548(03)00165-5_BIB10","doi-asserted-by":"crossref","first-page":"135","DOI":"10.1080\/07408179908969812","article-title":"Scheduling the fabrication and assembly of components in a two-machine flow shop","volume":"31","author":"Cheng","year":"1999","journal-title":"IIE Transactions"},{"key":"10.1016\/S0305-0548(03)00165-5_BIB11","doi-asserted-by":"crossref","first-page":"103","DOI":"10.1016\/S0925-5273(00)00169-9","article-title":"Hybrid flow-shop scheduling with assembly operations","volume":"73","author":"Yokoyama","year":"2001","journal-title":"International Journal of Production Economics"},{"key":"10.1016\/S0305-0548(03)00165-5_BIB12","doi-asserted-by":"crossref","first-page":"241","DOI":"10.1057\/jors.1992.33","article-title":"Games, critical paths and assignment problems in permutation flow shops and cyclic scheduling","volume":"43","author":"Karabati","year":"1992","journal-title":"Journal of Operational Research Society"},{"key":"10.1016\/S0305-0548(03)00165-5_BIB13","doi-asserted-by":"crossref","first-page":"211","DOI":"10.1002\/(SICI)1520-6750(199603)43:2<211::AID-NAV4>3.0.CO;2-D","article-title":"Cyclic scheduling in flow lines","volume":"43","author":"Karabati","year":"1996","journal-title":"Naval Research Logistics"},{"key":"10.1016\/S0305-0548(03)00165-5_BIB14","doi-asserted-by":"crossref","first-page":"1125","DOI":"10.1080\/002075498193552","article-title":"Sequencing, lot sizing and scheduling of several products in job shops","volume":"36","author":"Ouenniche","year":"1998","journal-title":"International Journal of Production Research"}],"container-title":["Computers &amp; Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0305054803001655?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0305054803001655?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,3,20]],"date-time":"2019-03-20T07:54:02Z","timestamp":1553068442000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0305054803001655"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2004,10]]},"references-count":14,"journal-issue":{"issue":"12","published-print":{"date-parts":[[2004,10]]}},"alternative-id":["S0305054803001655"],"URL":"https:\/\/doi.org\/10.1016\/s0305-0548(03)00165-5","relation":{},"ISSN":["0305-0548"],"issn-type":[{"value":"0305-0548","type":"print"}],"subject":[],"published":{"date-parts":[[2004,10]]}}}