{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,2]],"date-time":"2026-06-02T09:43:05Z","timestamp":1780393385114,"version":"3.54.1"},"reference-count":38,"publisher":"Elsevier BV","issue":"4","license":[{"start":{"date-parts":[[1997,4,1]],"date-time":"1997-04-01T00:00:00Z","timestamp":859852800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Computers &amp; Operations Research"],"published-print":{"date-parts":[[1997,4]]},"DOI":"10.1016\/s0305-0548(96)00061-5","type":"journal-article","created":{"date-parts":[[2003,4,23]],"date-time":"2003-04-23T20:16:34Z","timestamp":1051128994000},"page":"335-351","source":"Crossref","is-referenced-by-count":172,"title":["A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles"],"prefix":"10.1016","volume":"24","author":[{"given":"G\u00fcnd\u00fcz","family":"Ulusoy","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Funda","family":"Sivrikaya-\u015eerifo\u01e7lu","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"\u00dcmit","family":"Bilge","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"78","reference":[{"key":"10.1016\/S0305-0548(96)00061-5_BIB1","series-title":"Proc. of the Second ORSA\/TIMS Conf. on Flexible Manufacturing Systems","first-page":"455","article-title":"Simultaneous scheduling of machines and material handling devices in automated manufacturing","author":"Raman","year":"1986"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB2","series-title":"Implementing Flexible Manufacturing Systems","author":"Greenwood","year":"1988"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB3","series-title":"Advanced Information Technologies for Industrial Material Flow Systems","first-page":"417","article-title":"Guided vehicle systems: information\/control system implication of alternative design and operation strategies","author":"Bozer","year":"1989"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB4","doi-asserted-by":"crossref","first-page":"184","DOI":"10.1080\/07408178908966222","article-title":"Control of material handling transporter in automated manufacturing","volume":"21","author":"Han","year":"1989","journal-title":"IIE Trans."},{"key":"10.1016\/S0305-0548(96)00061-5_BIB5","doi-asserted-by":"crossref","first-page":"75","DOI":"10.1007\/BF01474748","article-title":"Design and planning problems in flexible manufacturing systems: a critical review","volume":"3","author":"Kouvelis","year":"1992","journal-title":"J. Intelligent Manufacturing"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB6","series-title":"Material Flow Systems in Manufacturing","first-page":"54","article-title":"Design justification of material handling systems","author":"Noble","year":"1994"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB7","doi-asserted-by":"crossref","first-page":"114","DOI":"10.1080\/05695558208974590","article-title":"Design of automated guided vehicles","volume":"14","author":"Maxwell","year":"1982","journal-title":"IIE Trans."},{"key":"10.1016\/S0305-0548(96)00061-5_BIB8","first-page":"157","article-title":"An expert system for design of automated material handling systems (INSIMAS)","volume":"2","author":"Grosseschallau","year":"1985","journal-title":"Mater. Flow"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB9","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1080\/00207548608919707","article-title":"Using SLAM to design the material handling system of an FMS","volume":"24","author":"Chang","year":"1986","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/S0305-0548(96)00061-5_BIB10","doi-asserted-by":"crossref","first-page":"1611","DOI":"10.1080\/00207549008942819","article-title":"Design of an automated guided vehicle design-based material handling system for an FMS","volume":"28","author":"Mahadevan","year":"1990","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/S0305-0548(96)00061-5_BIB11","doi-asserted-by":"crossref","first-page":"1741","DOI":"10.1080\/00207549008942830","article-title":"A model for the design of zone control automated guided vehicle systems","volume":"28","author":"Malmborg","year":"1990","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/S0305-0548(96)00061-5_BIB12","doi-asserted-by":"crossref","first-page":"623","DOI":"10.1016\/0360-8352(91)90163-Z","article-title":"A simulation model for estimating vehicle requirements in automated guided vehicle systems","volume":"21","author":"Gobal","year":"1991","journal-title":"Computers Industrial Engg"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB13","series-title":"Material Flow Systems in Manufacturing","first-page":"3","article-title":"An integrated framework for the design of material flow systems","author":"Rembold","year":"1994"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB14","doi-asserted-by":"crossref","first-page":"1603","DOI":"10.1080\/00207548908942642","article-title":"An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing","volume":"27","author":"Wu","year":"1989","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/S0305-0548(96)00061-5_BIB15","doi-asserted-by":"crossref","first-page":"47","DOI":"10.1080\/00207549008942683","article-title":"Multi-criteria operational control rules in flexible manufacturing systems","volume":"28","author":"Ro","year":"1990","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/S0305-0548(96)00061-5_BIB16","doi-asserted-by":"crossref","first-page":"1059","DOI":"10.1080\/00207549208942943","article-title":"Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system","volume":"30","author":"Sabuncuo\u01e7lu","year":"1992","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/S0305-0548(96)00061-5_BIB17","first-page":"541","article-title":"Scheduling of machines and vehicles in an FMS: single-level versus multi-level approach","volume":"64","author":"Sawik","year":"1993","journal-title":"Automatyka"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB18","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1080\/00207548808947852","article-title":"A LISP based controller for free-ranging automated guided vehicle systems","volume":"26","author":"Taghaboni","year":"1988","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/S0305-0548(96)00061-5_BIB19","series-title":"Material Flow Systems in Manufacturing","first-page":"300","article-title":"Real-time control strategies for multiple-load AGVs","author":"Tanchoco","year":"1994"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB20","series-title":"Proc. Second Industrial Engg Res. Conf.","first-page":"308","article-title":"A beam search based algorithm for scheduling machines and AGVs in an FMS","author":"Karab\u00fck","year":"1993"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB21","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1007\/BF01325094","article-title":"Scheduling tasks and vehicles in a flexible manufacturing system","volume":"4","author":"Blazewicz","year":"1991","journal-title":"Int. J. Flexible Manufacturing Sys."},{"key":"10.1016\/S0305-0548(96)00061-5_BIB22","series-title":"Job shop scheduling with explicit material handling considerations","author":"Pandit","year":"1993"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB23","doi-asserted-by":"crossref","first-page":"1058","DOI":"10.1287\/opre.43.6.1058","article-title":"A time window approach to simultaneous scheduling of machines and material handling system in an FMS","volume":"43","author":"Bilge","year":"1995","journal-title":"Opns Res."},{"key":"10.1016\/S0305-0548(96)00061-5_BIB24","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1007\/BF02023765","article-title":"Design, planning, scheduling, and control problems of flexible manufacturing systems","volume":"3","author":"Stecke","year":"1985","journal-title":"Annals of Opns Res."},{"key":"10.1016\/S0305-0548(96)00061-5_BIB25","article-title":"Mathematical programming models for FMSs","author":"Kiran","year":"1986"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB26","series-title":"Adaptation in Natural and Artificial Systems","author":"Holland","year":"1975"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB27","series-title":"Handbook of Genetic Algorithms","first-page":"332","article-title":"Schedule optimization using genetic algorithms","author":"Syswerda","year":"1991"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB28","doi-asserted-by":"crossref","first-page":"953","DOI":"10.1109\/21.247881","article-title":"A genetics based hybrid scheduler for generating static schedules in flexible manufacturing contexts","volume":"SMC-23","author":"Holsapple","year":"1993","journal-title":"IEEE Trans. Systems Man and Cybernetics"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB29","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1109\/64.236477","article-title":"Managing genetic search in job shop scheduling","author":"Uckun","year":"1993","journal-title":"IEEE Expert"},{"issue":"4","key":"10.1016\/S0305-0548(96)00061-5_BIB30","first-page":"332","article-title":"PROGENITOR: A GA for production scheduling","volume":"33","author":"Kanet","year":"1991","journal-title":"Wirtschaftsinformatik"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB31","series-title":"Proc. 5th Int. Conf. on Genetic Algorithms","first-page":"352","article-title":"Direct chromosome representation and advanced genetic operators for production scheduling","author":"Bruns","year":"1993"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB32","series-title":"Proc. 5th Int. Conf. on Genetic Algorithms","first-page":"375","article-title":"A promising GA approach to job-shop scheduling, rescheduling and open-shop scheduling problems","author":"Fang","year":"1993"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB33","series-title":"Proc. 5th Int. Conf. on Genetic Algorithms","first-page":"383","article-title":"Joint lot sizing and sequencing with GAs for scheduling: Evolving the chromosome structure","author":"Lee","year":"1993"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB34","doi-asserted-by":"crossref","first-page":"122","DOI":"10.1109\/TSMC.1986.289288","article-title":"Optimization of control parameters for genetic algorithms","volume":"SMC-16","author":"Grefenstette","year":"1986","journal-title":"IEEE Trans. Systems Man and Cybernetics"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB35","series-title":"Proc. 3rd Int. Conf. on Genetic Algorithms","first-page":"70","article-title":"Sizing populations for serial and parallel genetic algorithms","author":"Goldberg","year":"1989"},{"key":"10.1016\/S0305-0548(96)00061-5_BIB36","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1287\/opre.38.1.22","article-title":"Sequencing with earliness and tardiness penalties: A review","volume":"38","author":"Baker","year":"1990","journal-title":"Opns Res."},{"key":"10.1016\/S0305-0548(96)00061-5_BIB37","doi-asserted-by":"crossref","first-page":"1949","DOI":"10.1080\/00207548908942666","article-title":"A bottleneck based beam search for job scheduling in a flexible manufacturing system","volume":"27","author":"Chang","year":"1989","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/S0305-0548(96)00061-5_BIB38","series-title":"Proc. of the Winter Simulation Conf.","first-page":"653","article-title":"Performance of dispatch rules under perfect sequence flexibility","author":"Rachamadugu","year":"1990"}],"container-title":["Computers &amp; Operations Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0305054896000615?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0305054896000615?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,4,14]],"date-time":"2019-04-14T01:21:01Z","timestamp":1555204861000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0305054896000615"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1997,4]]},"references-count":38,"journal-issue":{"issue":"4","published-print":{"date-parts":[[1997,4]]}},"alternative-id":["S0305054896000615"],"URL":"https:\/\/doi.org\/10.1016\/s0305-0548(96)00061-5","relation":{},"ISSN":["0305-0548"],"issn-type":[{"value":"0305-0548","type":"print"}],"subject":[],"published":{"date-parts":[[1997,4]]}}}