{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,26]],"date-time":"2026-03-26T12:41:49Z","timestamp":1774528909119,"version":"3.50.1"},"reference-count":14,"publisher":"Elsevier BV","issue":"2","license":[{"start":{"date-parts":[[2003,8,1]],"date-time":"2003-08-01T00:00:00Z","timestamp":1059696000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Computers &amp; Industrial Engineering"],"published-print":{"date-parts":[[2003,8]]},"DOI":"10.1016\/s0360-8352(03)00034-2","type":"journal-article","created":{"date-parts":[[2003,4,30]],"date-time":"2003-04-30T21:26:08Z","timestamp":1051737968000},"page":"257-268","source":"Crossref","is-referenced-by-count":22,"title":["Single machine scheduling with maximum earliness and number tardy"],"prefix":"10.1016","volume":"45","author":[{"given":"Meral","family":"Azizoglu","sequence":"first","affiliation":[]},{"given":"Suna","family":"Kondakci","sequence":"additional","affiliation":[]},{"given":"Murat","family":"K\u00f6ksalan","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/S0360-8352(03)00034-2_BIB1","doi-asserted-by":"crossref","first-page":"221","DOI":"10.1016\/0377-2217(88)90356-6","article-title":"Single machine scheduling to minimize weighted earliness subject to no tardy jobs","volume":"34","author":"Chand","year":"1988","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0360-8352(03)00034-2_BIB2","doi-asserted-by":"crossref","first-page":"951","DOI":"10.1002\/1520-6750(199312)40:7<951::AID-NAV3220400707>3.0.CO;2-1","article-title":"Simultaneous optimization of efficiency and performance balance measures in single machine scheduling problems","volume":"40","author":"Federgruen","year":"1993","journal-title":"Naval Research Logistics"},{"key":"10.1016\/S0360-8352(03)00034-2_BIB3","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","article-title":"Optimization and approximation in deterministic sequencing and scheduling: A survey","volume":"5","author":"Graham","year":"1979","journal-title":"Annals of Discrete Mathematics"},{"key":"10.1016\/S0360-8352(03)00034-2_BIB4","unstructured":"Hoogeveen, J. A (1992). Single Machine Bicriteria Scheduling. Unpublished PhD Thesis, CWI, Amsterdam."},{"key":"10.1016\/S0360-8352(03)00034-2_BIB5","doi-asserted-by":"crossref","first-page":"777","DOI":"10.1002\/(SICI)1520-6750(199910)46:7<777::AID-NAV2>3.0.CO;2-5","article-title":"A heuristic approach to bicriteria scheduling","volume":"46","author":"K\u00f6ksalan","year":"1999","journal-title":"Naval Research Logistics"},{"key":"10.1016\/S0360-8352(03)00034-2_BIB7","doi-asserted-by":"crossref","first-page":"192","DOI":"10.1080\/07408179808966450","article-title":"Minimizing flow time and maximum earliness on a single machine","volume":"30","author":"K\u00f6ksalan","year":"1998","journal-title":"IIE Transactions"},{"key":"10.1016\/S0360-8352(03)00034-2_BIB6","series-title":"Essays in decision making, a volume in honour of Stanley Zionts","first-page":"331","author":"K\u00f6ksalan","year":"1997"},{"key":"10.1016\/S0360-8352(03)00034-2_BIB8","doi-asserted-by":"crossref","first-page":"929","DOI":"10.1002\/(SICI)1520-6750(199609)43:6<929::AID-NAV9>3.0.CO;2-6","article-title":"Note: Bicriteria scheduling for minimizing flow time and maximum tardiness","volume":"43","author":"Kondakci","year":"1996","journal-title":"Naval Research Logistics"},{"key":"10.1016\/S0360-8352(03)00034-2_BIB9","doi-asserted-by":"crossref","first-page":"769","DOI":"10.1016\/0305-0548(95)00078-X","article-title":"Single machine scheduling to minimize the number of early and tardy jobs","volume":"23","author":"Lann","year":"1996","journal-title":"Computers and Operations Research"},{"key":"10.1016\/S0360-8352(03)00034-2_BIB10","doi-asserted-by":"crossref","first-page":"269","DOI":"10.1142\/9789814354363_0013","article-title":"Complexity of single machine hierarchical scheduling: A survey","volume":"19","author":"Lee","year":"1993","journal-title":"Complexity in Numerical Optimization"},{"key":"10.1016\/S0360-8352(03)00034-2_BIB11","doi-asserted-by":"crossref","first-page":"343","DOI":"10.1016\/S0167-5060(08)70743-X","article-title":"Complexity of machine scheduling problems","volume":"1","author":"Lenstra","year":"1977","journal-title":"Annals of Discrete Mathematics"},{"key":"10.1016\/S0360-8352(03)00034-2_BIB12","doi-asserted-by":"crossref","first-page":"102","DOI":"10.1287\/mnsc.15.1.102","article-title":"An n job one machine sequencing algorithm for minimizing the number of late jobs","volume":"15","author":"Moore","year":"1968","journal-title":"Management Science"},{"key":"10.1016\/S0360-8352(03)00034-2_BIB13","doi-asserted-by":"crossref","first-page":"147","DOI":"10.1016\/S0305-0548(96)00037-8","article-title":"Single machine scheduling to minimize weighted earliness subject to maximum tardiness","volume":"24","author":"Tsiushuang","year":"1997","journal-title":"Computers and Operations Research"},{"key":"10.1016\/S0360-8352(03)00034-2_BIB14","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1016\/0377-2217(80)90038-7","article-title":"Solving a bicriterion scheduling problem","volume":"4","author":"Van Wassenhove","year":"1980","journal-title":"European Journal of Operational Research"}],"container-title":["Computers &amp; Industrial Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0360835203000342?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0360835203000342?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,3,21]],"date-time":"2019-03-21T19:51:25Z","timestamp":1553197885000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0360835203000342"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2003,8]]},"references-count":14,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2003,8]]}},"alternative-id":["S0360835203000342"],"URL":"https:\/\/doi.org\/10.1016\/s0360-8352(03)00034-2","relation":{},"ISSN":["0360-8352"],"issn-type":[{"value":"0360-8352","type":"print"}],"subject":[],"published":{"date-parts":[[2003,8]]}}}