{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,6]],"date-time":"2026-03-06T00:41:03Z","timestamp":1772757663553,"version":"3.50.1"},"reference-count":24,"publisher":"Elsevier BV","issue":"1","license":[{"start":{"date-parts":[[2003,6,1]],"date-time":"2003-06-01T00:00:00Z","timestamp":1054425600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Computers &amp; Industrial Engineering"],"published-print":{"date-parts":[[2003,6]]},"DOI":"10.1016\/s0360-8352(03)00043-3","type":"journal-article","created":{"date-parts":[[2003,5,19]],"date-time":"2003-05-19T12:52:26Z","timestamp":1053348746000},"page":"231-254","source":"Crossref","is-referenced-by-count":11,"title":["Group sequencing a PCB assembly system via an expected sequence dependent setup heuristic"],"prefix":"10.1016","volume":"45","author":[{"given":"Manuel D.","family":"Rossetti","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Keith J.A.","family":"Stanford","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/S0360-8352(03)00043-3_BIB1","series-title":"Network flows: Theory, algorithms, and applications","author":"Ahuja","year":"1993"},{"key":"10.1016\/S0360-8352(03)00043-3_BIB2","series-title":"Introduction to sequencing and scheduling","author":"Baker","year":"1974"},{"issue":"1","key":"10.1016\/S0360-8352(03)00043-3_BIB3","first-page":"19","article-title":"Exact and heuristic procedures for the traveling salesman problem with precedence constraints, based on dynamic programming","volume":"32","author":"Bianco","year":"1994","journal-title":"INFOR"},{"key":"10.1016\/S0360-8352(03)00043-3_BIB4","doi-asserted-by":"crossref","first-page":"1365","DOI":"10.1057\/jors.1995.184","article-title":"A savings heuristic algorithm for flowshop scheduling with sequence dependent setup times","volume":"46","author":"Das","year":"1995","journal-title":"Journal of Operational Research Society"},{"key":"10.1016\/S0360-8352(03)00043-3_BIB5","doi-asserted-by":"crossref","first-page":"120","DOI":"10.1111\/j.1540-5915.1989.tb01400.x","article-title":"Joint lot sizing and scheduling of multiple items with sequence dependent setup cost","volume":"20","author":"Dilts","year":"1989","journal-title":"Decision Sciences"},{"issue":"1","key":"10.1016\/S0360-8352(03)00043-3_BIB6","doi-asserted-by":"crossref","first-page":"27","DOI":"10.1016\/0360-8352(94)90025-6","article-title":"Heuristics for scheduling flexible flow lines","volume":"26","author":"Ding","year":"1994","journal-title":"Computers and Industrial Engineering"},{"issue":"2","key":"10.1016\/S0360-8352(03)00043-3_BIB7","doi-asserted-by":"crossref","first-page":"113","DOI":"10.1016\/0736-5845(91)90027-P","article-title":"Production control policies for a flexible assembly system","volume":"8","author":"Doulgeri","year":"1991","journal-title":"Robotics and Computer-Integrated Manufacturing"},{"key":"10.1016\/S0360-8352(03)00043-3_BIB8","first-page":"28","article-title":"Allocation of observations in ranking and selection with unequal variances","volume":"B37","author":"Dudewicz","year":"1975","journal-title":"Sankhya"},{"key":"10.1016\/S0360-8352(03)00043-3_BIB9","series-title":"Cluster analysis","author":"Everitt","year":"1993"},{"key":"10.1016\/S0360-8352(03)00043-3_BIB10","series-title":"Sequencing and scheduling: An introduction to the mathematics of the Job-Shop","author":"French","year":"1982"},{"key":"10.1016\/S0360-8352(03)00043-3_BIB11","series-title":"Group technology at work","article-title":"Cluster analysis applications for group technology manufacturing systems","author":"Gongaware","year":"1984"},{"key":"10.1016\/S0360-8352(03)00043-3_BIB12","unstructured":"Gupta, J (1993). Two-stage reentrant flowshop problem with repeated processing at the first stage. Department of Management, Ball State University."},{"key":"10.1016\/S0360-8352(03)00043-3_BIB13","series-title":"Group technology applications to production management","author":"Ham","year":"1985"},{"issue":"1\u20134","key":"10.1016\/S0360-8352(03)00043-3_BIB14","doi-asserted-by":"crossref","first-page":"453","DOI":"10.1016\/0360-8352(91)90134-R","article-title":"PCB assembly setup reduction using group technology","volume":"21","author":"Hashiba","year":"1991","journal-title":"Computers and Industrial Engineering"},{"key":"10.1016\/S0360-8352(03)00043-3_BIB15","series-title":"Linear programming","author":"Ignizio","year":"1994"},{"key":"10.1016\/S0360-8352(03)00043-3_BIB16","article-title":"The part families problem in flexible manufacturing systems","volume":"Vol. 3","author":"Kusiak","year":"1985"},{"key":"10.1016\/S0360-8352(03)00043-3_BIB17","series-title":"Simulation modeling and analysis","author":"Law","year":"1993"},{"key":"10.1016\/S0360-8352(03)00043-3_BIB18","doi-asserted-by":"crossref","first-page":"895","DOI":"10.1287\/opre.20.4.895","article-title":"A scheduling problem involving sequence dependent changeover times","volume":"20","author":"Lockett","year":"1972","journal-title":"Operations Research"},{"key":"10.1016\/S0360-8352(03)00043-3_BIB19","series-title":"Scheduling: theory, algorithms, and systems","author":"Pinedo","year":"1995"},{"key":"10.1016\/S0360-8352(03)00043-3_BIB20","doi-asserted-by":"crossref","first-page":"34","DOI":"10.1287\/mnsc.21.1.34","article-title":"A production scheduling problem with sequencing considerations","volume":"21","author":"Prabhakar","year":"1974","journal-title":"Management Science"},{"issue":"12","key":"10.1016\/S0360-8352(03)00043-3_BIB21","doi-asserted-by":"crossref","first-page":"1121","DOI":"10.1057\/jors.1986.197","article-title":"A mixed-integer goal programming formulation of the standard flow-shop scheduling problem","volume":"37","author":"Selen","year":"1986","journal-title":"Journal of the Operational Research Society"},{"issue":"4","key":"10.1016\/S0360-8352(03)00043-3_BIB22","doi-asserted-by":"crossref","first-page":"383","DOI":"10.1080\/07408179108963871","article-title":"Job and family scheduling of a flow-line manufacturing cell: A simulation study","volume":"23","author":"Wemmerlov","year":"1991","journal-title":"IIE Transactions"},{"issue":"2","key":"10.1016\/S0360-8352(03)00043-3_BIB23","doi-asserted-by":"crossref","first-page":"191","DOI":"10.1080\/00207547708943117","article-title":"Sequence dependent set-up times and job sequencing","volume":"15","author":"White","year":"1977","journal-title":"International Journal of Production Research"},{"issue":"4","key":"10.1016\/S0360-8352(03)00043-3_BIB24","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1057\/palgrave.jors.0400410","article-title":"Alternative Formulations of a Flow-Shop Scheduling Problem","volume":"40","author":"Wilson","year":"1989","journal-title":"Journal of the Operational Research Society"}],"container-title":["Computers &amp; Industrial Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0360835203000433?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0360835203000433?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,3,21]],"date-time":"2019-03-21T07:51:10Z","timestamp":1553154670000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0360835203000433"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2003,6]]},"references-count":24,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2003,6]]}},"alternative-id":["S0360835203000433"],"URL":"https:\/\/doi.org\/10.1016\/s0360-8352(03)00043-3","relation":{},"ISSN":["0360-8352"],"issn-type":[{"value":"0360-8352","type":"print"}],"subject":[],"published":{"date-parts":[[2003,6]]}}}