{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,7]],"date-time":"2026-02-07T22:21:05Z","timestamp":1770502865888,"version":"3.49.0"},"reference-count":27,"publisher":"Elsevier BV","issue":"1","license":[{"start":{"date-parts":[[2001,5,1]],"date-time":"2001-05-01T00:00:00Z","timestamp":988675200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[2001,5]]},"DOI":"10.1016\/s0377-2217(00)00061-8","type":"journal-article","created":{"date-parts":[[2002,7,25]],"date-time":"2002-07-25T20:54:50Z","timestamp":1027630490000},"page":"188-207","source":"Crossref","is-referenced-by-count":54,"title":["Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems"],"prefix":"10.1016","volume":"131","author":[{"given":"Tu\u011frul","family":"Korkmazel","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Sedef","family":"Meral","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/S0377-2217(00)00061-8_BIB1","doi-asserted-by":"crossref","first-page":"985","DOI":"10.1145\/115234.115349","article-title":"A parallel shortest augmenting path algorithm for the assignment problem","volume":"38\/4","author":"Balas","year":"1991","journal-title":"Journal of the Association for Computing Machinery"},{"key":"10.1016\/S0377-2217(00)00061-8_BIB2","unstructured":"Bolat, A., Yano, C.A., 1988. Scheduling algorithm to minimize utility work at a single station on a paced assembly line. Technical Report No. 7, Department of Industrial and Operations Engineering, University of Michigan, Ann Arbor, MI"},{"key":"10.1016\/S0377-2217(00)00061-8_BIB3","series-title":"Assignment and Matching Problems: Solution Methods with FORTRAN-Programs","first-page":"6","author":"Burkard","year":"1980"},{"key":"10.1016\/S0377-2217(00)00061-8_BIB4","doi-asserted-by":"crossref","first-page":"919","DOI":"10.1080\/15458830.1996.11770745","article-title":"Modifying mixed-model assembly line sequencing methods to consider weighted variations for just-in-time production systems","volume":"28","author":"Cheng","year":"1996","journal-title":"IIE Transactions"},{"issue":"4","key":"10.1016\/S0377-2217(00)00061-8_BIB5","doi-asserted-by":"crossref","first-page":"313","DOI":"10.1016\/0305-0483(78)90004-X","article-title":"Mixed-model assembly line sequencing problems","volume":"6","author":"Dar-El","year":"1978","journal-title":"Omega"},{"issue":"5","key":"10.1016\/S0377-2217(00)00061-8_BIB6","doi-asserted-by":"crossref","first-page":"463","DOI":"10.1080\/00207547508943016","article-title":"Assembly line sequencing for model mix","volume":"13","author":"Dar-El","year":"1975","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0377-2217(00)00061-8_BIB7","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1016\/0272-6963(93)90032-K","article-title":"An effective mixed-model assembly line sequencing heuristic for just-in-time production systems","volume":"11","author":"Ding","year":"1993","journal-title":"Journal of Operations Management"},{"key":"10.1016\/S0377-2217(00)00061-8_BIB8","doi-asserted-by":"crossref","first-page":"27","DOI":"10.1016\/0167-6377(93)90081-Q","article-title":"A simple sequencing algorithm for mixed-model assembly lines in just-in-time production systems","volume":"13","author":"Ding","year":"1993","journal-title":"Operations Research Letters"},{"key":"10.1016\/S0377-2217(00)00061-8_BIB9","doi-asserted-by":"crossref","first-page":"901","DOI":"10.1287\/mnsc.37.7.901","article-title":"Notes on sequencing JIT mixed-model assembly lines","volume":"37\/7","author":"Inman","year":"1991","journal-title":"Management Science"},{"key":"10.1016\/S0377-2217(00)00061-8_BIB10","unstructured":"Korkmazel, T., 1994. Mixed-model sequencing problems in just-in-time production systems. unpublished M.S. Thesis, Middle East Technical University, Ankara, Turkey"},{"key":"10.1016\/S0377-2217(00)00061-8_BIB11","unstructured":"Korkmazel, T., Meral, S., 1997. Scheduling mixed-model assembly lines. Technical Report No: 95\u201312 (revised in 1997), Middle East Technical University, Ankara, Turkey"},{"key":"10.1016\/S0377-2217(00)00061-8_BIB12","doi-asserted-by":"crossref","first-page":"259","DOI":"10.1016\/0377-2217(93)90215-9","article-title":"Minimizing variation of production rates in just-in-time systems: A survey","volume":"66","author":"Kubiak","year":"1993","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(00)00061-8_BIB13","doi-asserted-by":"crossref","first-page":"121","DOI":"10.1287\/mnsc.37.1.121","article-title":"A note on level schedules for mixed-model assembly lines in just-in-time production systems","volume":"37","author":"Kubiak","year":"1991","journal-title":"Management Science"},{"key":"10.1016\/S0377-2217(00)00061-8_BIB14","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1007\/BF01328809","article-title":"Optimal just-in-time schedules for flexible transfer lines","volume":"6","author":"Kubiak","year":"1994","journal-title":"International Journal of Flexible Manufacturing Systems"},{"issue":"2","key":"10.1016\/S0377-2217(00)00061-8_BIB15","doi-asserted-by":"crossref","first-page":"192","DOI":"10.1287\/mnsc.35.2.192","article-title":"Level schedules for mixed-model assembly lines in just-in-time production systems","volume":"35","author":"Miltenburg","year":"1989","journal-title":"Management Science"},{"key":"10.1016\/S0377-2217(00)00061-8_BIB16","doi-asserted-by":"crossref","first-page":"893","DOI":"10.1002\/nav.3800380608","article-title":"Developing production schedules which balance part usage and smooth production loads for just-in-time production systems","volume":"38","author":"Miltenburg","year":"1991","journal-title":"Naval Research Logistics"},{"issue":"9","key":"10.1016\/S0377-2217(00)00061-8_BIB17","doi-asserted-by":"crossref","first-page":"1487","DOI":"10.1080\/00207548908942636","article-title":"Scheduling mixed-model multi-level just-in-time production systems","volume":"27","author":"Miltenburg","year":"1989","journal-title":"International Journal of Production Research"},{"issue":"3","key":"10.1016\/S0377-2217(00)00061-8_BIB18","doi-asserted-by":"crossref","first-page":"57","DOI":"10.1016\/0895-7177(90)90370-3","article-title":"A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems","volume":"13","author":"Miltenburg","year":"1990","journal-title":"Mathematical and Computer Modelling"},{"key":"10.1016\/S0377-2217(00)00061-8_BIB19","unstructured":"Monden, Y., 1983. Toyota Production System. Institute of Industrial Engineers Press, Atlanta, GA"},{"issue":"3","key":"10.1016\/S0377-2217(00)00061-8_BIB20","doi-asserted-by":"crossref","first-page":"233","DOI":"10.1080\/00207547908919611","article-title":"A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor","volume":"17","author":"Okamura","year":"1979","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0377-2217(00)00061-8_BIB21","doi-asserted-by":"crossref","first-page":"38","DOI":"10.1016\/0377-2217(95)00254-5","article-title":"Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging","volume":"95","author":"Steiner","year":"1996","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(00)00061-8_BIB22","doi-asserted-by":"crossref","first-page":"371","DOI":"10.1016\/0272-6963(90)90161-6","article-title":"Evaluating mixed-model assembly line sequencing heuristics for just-in-time production systems","volume":"9\/3","author":"Sumichrast","year":"1990","journal-title":"Journal of Operations Management"},{"issue":"2","key":"10.1016\/S0377-2217(00)00061-8_BIB23","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1287\/mnsc.14.2.B59","article-title":"Line balancing-sequencing for mixed-model assembly","volume":"14","author":"Thomopoulos","year":"1967","journal-title":"Management Science"},{"key":"10.1016\/S0377-2217(00)00061-8_BIB24","doi-asserted-by":"crossref","first-page":"71","DOI":"10.1016\/0360-8352(94)90240-2","article-title":"A sequencing problem for a mixed-model assembly line in a JIT production system","volume":"27","author":"Xiaobo","year":"1994","journal-title":"Computers and Industrial Engineering"},{"key":"10.1016\/S0377-2217(00)00061-8_BIB25","first-page":"172","article-title":"Survey, development, and application of algorithms for sequencing paced assembly lines","volume":"2","author":"Yano","year":"1989","journal-title":"Journal of Manufacturing Operations Management"},{"key":"10.1016\/S0377-2217(00)00061-8_BIB26","doi-asserted-by":"crossref","first-page":"572","DOI":"10.1287\/mnsc.37.5.572","article-title":"Sequencing to minimize work overload in assembly lines with product options","volume":"37\/5","author":"Yano","year":"1991","journal-title":"Management Science"},{"key":"10.1016\/S0377-2217(00)00061-8_BIB27","doi-asserted-by":"crossref","first-page":"299","DOI":"10.1016\/0167-6377(94)90044-2","article-title":"A comment on a simple sequencing algorithm for mixed-model assembly lines in just-in-time production systems","volume":"16","author":"Yeomans","year":"1994","journal-title":"Operations Research Letters"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221700000618?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221700000618?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,4,20]],"date-time":"2019-04-20T23:56:29Z","timestamp":1555804589000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0377221700000618"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2001,5]]},"references-count":27,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2001,5]]}},"alternative-id":["S0377221700000618"],"URL":"https:\/\/doi.org\/10.1016\/s0377-2217(00)00061-8","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[2001,5]]}}}