{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,20]],"date-time":"2026-02-20T04:38:17Z","timestamp":1771562297906,"version":"3.50.1"},"reference-count":13,"publisher":"Elsevier BV","issue":"1","license":[{"start":{"date-parts":[[2001,7,1]],"date-time":"2001-07-01T00:00:00Z","timestamp":993945600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[2001,7]]},"DOI":"10.1016\/s0377-2217(00)00116-8","type":"journal-article","created":{"date-parts":[[2002,7,25]],"date-time":"2002-07-25T16:58:43Z","timestamp":1027616323000},"page":"116-122","source":"Crossref","is-referenced-by-count":57,"title":["Progressive hedging as a meta-heuristic applied to stochastic lot-sizing"],"prefix":"10.1016","volume":"132","author":[{"given":"Kjetil K.","family":"Haugen","sequence":"first","affiliation":[]},{"given":"Arne","family":"L\u00f8kketangen","sequence":"additional","affiliation":[]},{"given":"David L.","family":"Woodruff","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/S0377-2217(00)00116-8_BIB1","first-page":"1","article-title":"A standard input format for multiperiod stochastic linear program","volume":"17","author":"Birge","year":"1987","journal-title":"COAL (Mathematical Programming Society, Communications on Algorithms) Newsletter"},{"key":"10.1016\/S0377-2217(00)00116-8_BIB2","doi-asserted-by":"crossref","first-page":"268","DOI":"10.1287\/mnsc.15.5.268","article-title":"Extensions of the planning horizon theorem in the dynamic economic lot size model","volume":"15","author":"Eppen","year":"1969","journal-title":"Management Science"},{"key":"10.1016\/S0377-2217(00)00116-8_BIB3","series-title":"Stochastic Programming","author":"Kall","year":"1994"},{"key":"10.1016\/S0377-2217(00)00116-8_BIB4","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1007\/BF00247208","article-title":"Progressive hedging and tabu search applied to mixed integer (0,1) multistage stochastic programming","volume":"2","author":"L\u00f8kketangen","year":"1996","journal-title":"Journal of Heuristics"},{"key":"10.1016\/S0377-2217(00)00116-8_BIB5","doi-asserted-by":"crossref","first-page":"119","DOI":"10.1287\/moor.16.1.119","article-title":"Scenarios and policy aggregation in optimization under uncertainty","author":"Rockafellar","year":"1991","journal-title":"Mathematics of Operations Research"},{"key":"10.1016\/S0377-2217(00)00116-8_BIB6","unstructured":"H. Stadtler, Improved rolling schedules for the dynamic single-level lot-sizing problem, Technical report, Technische Universit\u00e4t Darmstadt, Darmstadt, 1998"},{"key":"10.1016\/S0377-2217(00)00116-8_BIB7","unstructured":"S. Takriti, J.R. Birge, E. Long, Intelligent unified control of unit commitment and generation allocation, Technical Report 94-26, Department of Industrial Engineering and Operations Engineering, University of Michigan, Ann Arbor, MI, 1995"},{"issue":"3","key":"10.1016\/S0377-2217(00)00116-8_BIB8","doi-asserted-by":"crossref","first-page":"353","DOI":"10.1287\/mnsc.35.3.353","article-title":"Capacitated lot sizing with setup times","volume":"35","author":"Trigeiro","year":"1989","journal-title":"Management Science"},{"key":"10.1016\/S0377-2217(00)00116-8_BIB9","doi-asserted-by":"crossref","first-page":"263","DOI":"10.1287\/opre.17.2.262","article-title":"Minimum concave-cost solution of leontief substitution models of multi-facility inventory systems","volume":"17","author":"Veinott","year":"1969","journal-title":"Operations Research"},{"key":"10.1016\/S0377-2217(00)00116-8_BIB10","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1287\/mnsc.5.1.89","article-title":"Dynamic version of the economic lot size formula","volume":"5","author":"Wagner","year":"1958","journal-title":"Management Science"},{"key":"10.1016\/S0377-2217(00)00116-8_BIB11","doi-asserted-by":"crossref","first-page":"105","DOI":"10.1287\/mnsc.13.1.105","article-title":"A deterministic multi-period production scheduling model with backlogging","volume":"13","author":"Zangwill","year":"1966","journal-title":"Management Science"},{"key":"10.1016\/S0377-2217(00)00116-8_BIB12","doi-asserted-by":"crossref","first-page":"429","DOI":"10.1287\/mnsc.14.7.429","article-title":"Minimum concave cost flows in certain networks","volume":"14","author":"Zangwill","year":"1968","journal-title":"Management Science"},{"key":"10.1016\/S0377-2217(00)00116-8_BIB13","first-page":"507","article-title":"A backlogging model and a multi-echelon model of a dynamic economic lot size production system \u2013 a network approach","volume":"16","author":"Zangwill","year":"1969","journal-title":"Management Science"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221700001168?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221700001168?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,4,25]],"date-time":"2019-04-25T11:54:07Z","timestamp":1556193247000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0377221700001168"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2001,7]]},"references-count":13,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2001,7]]}},"alternative-id":["S0377221700001168"],"URL":"https:\/\/doi.org\/10.1016\/s0377-2217(00)00116-8","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[2001,7]]}}}