{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,26]],"date-time":"2025-10-26T13:48:33Z","timestamp":1761486513015},"reference-count":18,"publisher":"Elsevier BV","issue":"2","license":[{"start":{"date-parts":[[2002,7,1]],"date-time":"2002-07-01T00:00:00Z","timestamp":1025481600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[2002,7]]},"DOI":"10.1016\/s0377-2217(02)00077-2","type":"journal-article","created":{"date-parts":[[2002,10,14]],"date-time":"2002-10-14T15:56:01Z","timestamp":1034610961000},"page":"384-398","source":"Crossref","is-referenced-by-count":19,"title":["An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns"],"prefix":"10.1016","volume":"140","author":[{"given":"D.","family":"Alcaide","sequence":"first","affiliation":[]},{"given":"A.","family":"Rodriguez-Gonzalez","sequence":"additional","affiliation":[]},{"given":"J.","family":"Sicilia","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/S0377-2217(02)00077-2_BIB1","series-title":"Local Search in Combinatorial Optimization","first-page":"361","article-title":"Machine scheduling","author":"Anderson","year":"1997"},{"key":"10.1016\/S0377-2217(02)00077-2_BIB2","first-page":"184","article-title":"N-job, 2 machine sequencing problem with stochastic service times","volume":"7","author":"Bagga","year":"1970","journal-title":"Operations Research"},{"key":"10.1016\/S0377-2217(02)00077-2_BIB3","series-title":"Introduction to Sequencing and Scheduling","author":"Baker","year":"1974"},{"issue":"3","key":"10.1016\/S0377-2217(02)00077-2_BIB4","doi-asserted-by":"crossref","first-page":"422","DOI":"10.1287\/opre.47.3.422","article-title":"Stochastic scheduling on parallel machines subject to random breakdowns to minimize expected costs for earliness and tardy jobs","volume":"47","author":"Cai","year":"1999","journal-title":"Operations Research"},{"key":"10.1016\/S0377-2217(02)00077-2_BIB5","series-title":"Industrial Operations Research","author":"Fabrycky","year":"1972"},{"key":"10.1016\/S0377-2217(02)00077-2_BIB6","series-title":"Sequencing and Scheduling: An Introduction to the Mathematics of the Job Shop","author":"French","year":"1982"},{"key":"10.1016\/S0377-2217(02)00077-2_BIB7","series-title":"Statistical Quality Control","author":"Grant","year":"1996"},{"key":"10.1016\/S0377-2217(02)00077-2_BIB8","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","article-title":"Optimal two and three stage production schedules with setup includes","volume":"1","author":"Johnson","year":"1954","journal-title":"Naval Research Logistic Quarterly"},{"key":"10.1016\/S0377-2217(02)00077-2_BIB9","article-title":"Sequencing and scheduling: Algorithms and complexity","volume":"vol. 4","author":"Lawler","year":"1993"},{"key":"10.1016\/S0377-2217(02)00077-2_BIB10","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1016\/0167-6377(95)00033-2","article-title":"Stochastic scheduling on a single machine subject to multiple breakdowns according to different probabilities","volume":"18","author":"Li","year":"1995","journal-title":"Operations Research Letters"},{"key":"10.1016\/S0377-2217(02)00077-2_BIB11","doi-asserted-by":"crossref","first-page":"693","DOI":"10.1002\/nav.3800280417","article-title":"A note on the two-machine job shop with exponential processing time","volume":"28","author":"Pinedo","year":"1981","journal-title":"Naval Research Logistic Quarterly"},{"key":"10.1016\/S0377-2217(02)00077-2_BIB12","series-title":"Scheduling: Theory, Algorithms and Systems","author":"Pinedo","year":"1995"},{"key":"10.1016\/S0377-2217(02)00077-2_BIB13","doi-asserted-by":"crossref","first-page":"41","DOI":"10.1017\/S0269964800000619","article-title":"A note on stochastic scheduling on a single machine subject to breakdowns and repair","volume":"2","author":"Pinedo","year":"1988","journal-title":"Probability in the Engineering and Informational Sciences"},{"key":"10.1016\/S0377-2217(02)00077-2_BIB14","doi-asserted-by":"crossref","first-page":"898","DOI":"10.2307\/1427030","article-title":"Minimizing expected makespan in stochastic open shops","volume":"14","author":"Pinedo","year":"1982","journal-title":"Advances in Applied Probability"},{"key":"10.1016\/S0377-2217(02)00077-2_BIB15","series-title":"Deterministic and Stochastic Scheduling","first-page":"181","article-title":"Stochastic shop scheduling: A survey","author":"Pinedo","year":"1982"},{"key":"10.1016\/S0377-2217(02)00077-2_BIB16","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/asm.3150020106","article-title":"Inequalities for stochastic flow shops and job shops","volume":"2","author":"Pinedo","year":"1986","journal-title":"Applied Stochastic Models and Data Analysis"},{"key":"10.1016\/S0377-2217(02)00077-2_BIB17","series-title":"Deterministic and Stochastic Scheduling","first-page":"157","article-title":"Multiserver stochastic scheduling","author":"Weiss","year":"1982"},{"key":"10.1016\/S0377-2217(02)00077-2_BIB18","series-title":"Scheduling Theory and Its Applications","article-title":"A tutorial in stochastic scheduling","author":"Weiss","year":"1995"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221702000772?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221702000772?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,5,4]],"date-time":"2019-05-04T00:21:32Z","timestamp":1556929292000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0377221702000772"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2002,7]]},"references-count":18,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2002,7]]}},"alternative-id":["S0377221702000772"],"URL":"https:\/\/doi.org\/10.1016\/s0377-2217(02)00077-2","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[2002,7]]}}}