{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,28]],"date-time":"2026-02-28T16:57:26Z","timestamp":1772297846309,"version":"3.50.1"},"reference-count":12,"publisher":"Elsevier BV","issue":"1","license":[{"start":{"date-parts":[[2003,8,1]],"date-time":"2003-08-01T00:00:00Z","timestamp":1059696000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[2003,8]]},"DOI":"10.1016\/s0377-2217(02)00429-0","type":"journal-article","created":{"date-parts":[[2003,5,12]],"date-time":"2003-05-12T19:55:41Z","timestamp":1052769341000},"page":"131-141","source":"Crossref","is-referenced-by-count":45,"title":["Optimal lot sizing for products sold under free-repair warranty"],"prefix":"10.1016","volume":"149","author":[{"given":"Chih-Hsiung","family":"Wang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Shey-Heui","family":"Sheu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/S0377-2217(02)00429-0_BIB1","doi-asserted-by":"crossref","first-page":"2","DOI":"10.1080\/07408178608975323","article-title":"A comparative study of continuous and periodic inspection policies in deteriorating production systems","volume":"18","author":"Rosenblatt","year":"1986","journal-title":"IIE Transactions"},{"issue":"9","key":"10.1016\/S0377-2217(02)00429-0_BIB2","doi-asserted-by":"crossref","first-page":"1125","DOI":"10.1287\/mnsc.33.9.1125","article-title":"Simultaneous determination of production cycle and inspection schedules in a production system","volume":"33","author":"Lee","year":"1987","journal-title":"Management Science"},{"issue":"4","key":"10.1016\/S0377-2217(02)00429-0_BIB3","doi-asserted-by":"crossref","first-page":"368","DOI":"10.1080\/07408178908966243","article-title":"A production and maintenance planning model with restoration cost dependent on detection delay","volume":"21","author":"Lee","year":"1989","journal-title":"IIE Transactions"},{"key":"10.1016\/S0377-2217(02)00429-0_BIB4","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1002\/(SICI)1520-6750(199803)45:2<165::AID-NAV3>3.0.CO;2-6","article-title":"Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections","volume":"45","author":"Makis","year":"1998","journal-title":"Naval Research Logistics"},{"key":"10.1016\/S0377-2217(02)00429-0_BIB5","doi-asserted-by":"crossref","first-page":"66","DOI":"10.1057\/palgrave.jors.2600484","article-title":"An EMQ model with inspections and random machine failures","volume":"49","author":"Makis","year":"1998","journal-title":"Journal of the Operational Research Society"},{"key":"10.1016\/S0377-2217(02)00429-0_BIB6","doi-asserted-by":"crossref","first-page":"48","DOI":"10.1080\/07408178608975329","article-title":"Economic production cycles with imperfect production process","volume":"18","author":"Rosenblatt","year":"1986","journal-title":"IIE Transactions"},{"key":"10.1016\/S0377-2217(02)00429-0_BIB7","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1287\/opre.34.1.137","article-title":"Optimal lot sizing, process quality improvement and setup cost reduction","volume":"34","author":"Porteus","year":"1986","journal-title":"Operations Research"},{"key":"10.1016\/S0377-2217(02)00429-0_BIB8","doi-asserted-by":"crossref","first-page":"97","DOI":"10.1016\/0925-5273(94)90123-6","article-title":"Quality control through lot sizing for items sold with warranty","volume":"33","author":"Djamaludin","year":"1994","journal-title":"International Journal of Production Economics"},{"key":"10.1016\/S0377-2217(02)00429-0_BIB9","doi-asserted-by":"crossref","first-page":"1093","DOI":"10.1016\/S0305-0548(00)00030-7","article-title":"Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorating production system","volume":"28","author":"Wang","year":"2001","journal-title":"Computers and Operations Research"},{"key":"10.1016\/S0377-2217(02)00429-0_BIB10","doi-asserted-by":"crossref","first-page":"167","DOI":"10.1002\/asm.3150110207","article-title":"A discrete-time model of failure and repair","volume":"11","author":"Shaked","year":"1995","journal-title":"Applied Stochastic Models and Data Analysis"},{"key":"10.1016\/S0377-2217(02)00429-0_BIB11","series-title":"Inventory Management and Production Planning and Scheduling","author":"Silver","year":"1998"},{"issue":"5","key":"10.1016\/S0377-2217(02)00429-0_BIB12","doi-asserted-by":"crossref","first-page":"300","DOI":"10.1109\/TR.1975.5214915","article-title":"The discrete Weibull distribution","volume":"R-24","author":"Nakagawa","year":"1975","journal-title":"IEEE Transactions on Reliability"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221702004290?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221702004290?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,3,30]],"date-time":"2019-03-30T07:29:54Z","timestamp":1553930994000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0377221702004290"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2003,8]]},"references-count":12,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2003,8]]}},"alternative-id":["S0377221702004290"],"URL":"https:\/\/doi.org\/10.1016\/s0377-2217(02)00429-0","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[2003,8]]}}}