{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,28]],"date-time":"2026-02-28T16:58:49Z","timestamp":1772297929271,"version":"3.50.1"},"reference-count":14,"publisher":"Elsevier BV","issue":"3","license":[{"start":{"date-parts":[[2003,9,1]],"date-time":"2003-09-01T00:00:00Z","timestamp":1062374400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[2003,9]]},"DOI":"10.1016\/s0377-2217(02)00499-x","type":"journal-article","created":{"date-parts":[[2003,1,30]],"date-time":"2003-01-30T20:45:15Z","timestamp":1043959515000},"page":"523-532","source":"Crossref","is-referenced-by-count":43,"title":["Rescheduling of identical parallel machines under machine eligibility constraints"],"prefix":"10.1016","volume":"149","author":[{"given":"O\u011fuzhan","family":"Alag\u00f6z","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Meral","family":"Azizo\u011flu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/S0377-2217(02)00499-X_BIB1","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1016\/S0377-2217(97)00396-2","article-title":"Match-up scheduling under a machine breakdown","volume":"112","author":"Akt\u00fcrk","year":"1999","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(02)00499-X_BIB2","doi-asserted-by":"crossref","first-page":"470","DOI":"10.1287\/opre.39.3.470","article-title":"Match-up scheduling with multiple resources, release dates and disruptions","volume":"39","author":"Bean","year":"1991","journal-title":"Operations Research"},{"key":"10.1016\/S0377-2217(02)00499-X_BIB3","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1080\/09511929208944524","article-title":"Analysis of periodic and event-driven rescheduling policies in dynamic shops","volume":"5","author":"Church","year":"1992","journal-title":"International Journal of Computer Integrated Manufacturing"},{"key":"10.1016\/S0377-2217(02)00499-X_BIB4","doi-asserted-by":"crossref","first-page":"503","DOI":"10.1016\/S0925-5273(98)00155-8","article-title":"Rescheduling and optimization of schedules considering machine failures","volume":"60\u201361","author":"Guo","year":"1999","journal-title":"International Journal of Production Economics"},{"key":"10.1016\/S0377-2217(02)00499-X_BIB5","unstructured":"Kaspi, M., Montreuil, B., 1988. On the scheduling of identical parallel processors with arbirary initial processor available times, Research memorandum no. 88-12, School of Industrial Engineering, Purdue University"},{"key":"10.1016\/S0377-2217(02)00499-X_BIB6","unstructured":"Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G., Shmoys, D.B., 1989. Sequencing and scheduling: Algorithms and complexity, Reports BS-R8909, Centre for Mathematics and Computer Science, Amsterdam"},{"key":"10.1016\/S0377-2217(02)00499-X_BIB7","doi-asserted-by":"crossref","first-page":"211","DOI":"10.1016\/0166-218X(90)90055-H","article-title":"Capacitated two parallel machines scheduling to minimize sum of job completion times","volume":"41","author":"Lee","year":"1993","journal-title":"Discrete Applied Mathematics"},{"key":"10.1016\/S0377-2217(02)00499-X_BIB8","doi-asserted-by":"crossref","first-page":"213","DOI":"10.1016\/0360-8352(96)00114-3","article-title":"Flow-time performance of modified scheduling heuristics in a dynamic rescheduling environment","volume":"31","author":"Lee","year":"1996","journal-title":"Computers and Industrial Engineering"},{"key":"10.1016\/S0377-2217(02)00499-X_BIB9","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1016\/S0360-8352(98)00034-5","article-title":"Simulation modeling of a dynamic job shop rescheduling with machine availability constraints","volume":"35","author":"Lee","year":"1998","journal-title":"Computers and Industrial Engineering"},{"key":"10.1016\/S0377-2217(02)00499-X_BIB10","doi-asserted-by":"crossref","first-page":"53","DOI":"10.1002\/1520-6750(199202)39:1<53::AID-NAV3220390105>3.0.CO;2-C","article-title":"On scheduling with ready-times, due-dates and vacations","volume":"39","author":"Leon","year":"1992","journal-title":"Naval Research Logistics"},{"key":"10.1016\/S0377-2217(02)00499-X_BIB11","series-title":"Combinatorial Optimization: Algorithms and Complexity","author":"Papadimitriou","year":"1982"},{"key":"10.1016\/S0377-2217(02)00499-X_BIB12","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1002\/nav.3800030106","article-title":"Various optimizers for single stage production","volume":"3","author":"Smith","year":"1956","journal-title":"Naval Research Logistics Quarterly"},{"key":"10.1016\/S0377-2217(02)00499-X_BIB13","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1023\/A:1018955111939","article-title":"Rescheduling on a single machine with part-type dependent setup times and deadlines","volume":"70","author":"\u00dcnal","year":"1997","journal-title":"Annals of Operations Research"},{"key":"10.1016\/S0377-2217(02)00499-X_BIB14","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/0305-0548(93)90091-V","article-title":"One-machine rescheduling heuristics with efficiency and stability as criteria","volume":"20","author":"Wu","year":"1993","journal-title":"Computers and Operations Research"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S037722170200499X?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S037722170200499X?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,3,30]],"date-time":"2019-03-30T03:59:06Z","timestamp":1553918346000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S037722170200499X"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2003,9]]},"references-count":14,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2003,9]]}},"alternative-id":["S037722170200499X"],"URL":"https:\/\/doi.org\/10.1016\/s0377-2217(02)00499-x","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[2003,9]]}}}