{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,31]],"date-time":"2025-10-31T06:56:34Z","timestamp":1761893794488,"version":"3.30.2"},"reference-count":29,"publisher":"Elsevier BV","issue":"3","license":[{"start":{"date-parts":[[2003,12,1]],"date-time":"2003-12-01T00:00:00Z","timestamp":1070236800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[2003,12]]},"DOI":"10.1016\/s0377-2217(02)00605-7","type":"journal-article","created":{"date-parts":[[2003,1,30]],"date-time":"2003-01-30T15:52:50Z","timestamp":1043941970000},"page":"481-502","source":"Crossref","is-referenced-by-count":26,"title":["Augmented neural networks for task scheduling"],"prefix":"10.1016","volume":"151","author":[{"given":"Anurag","family":"Agarwal","sequence":"first","affiliation":[]},{"given":"Hasan","family":"Pirkul","sequence":"additional","affiliation":[]},{"given":"Varghese S.","family":"Jacob","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"issue":"3","key":"10.1016\/S0377-2217(02)00605-7_BIB1","doi-asserted-by":"crossref","first-page":"391","DOI":"10.1287\/mnsc.34.3.391","article-title":"The shifting bottleneck procedures for job shop scheduling","volume":"34","author":"Adams","year":"1988","journal-title":"Management Science"},{"year":"1995","series-title":"Neural Networks for Pattern Recognition","author":"Bishop","key":"10.1016\/S0377-2217(02)00605-7_BIB2"},{"key":"10.1016\/S0377-2217(02)00605-7_BIB3","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1016\/S0377-2217(98)00246-X","article-title":"Single-machine scheduling with learning considerations","volume":"115","author":"Biskup","year":"1999","journal-title":"European Journal of Operations Research"},{"issue":"12","key":"10.1016\/S0377-2217(02)00605-7_BIB4","doi-asserted-by":"crossref","first-page":"3437","DOI":"10.1080\/002075498192148","article-title":"A genetic algorithm based procedure for more realistic job shop scheduling problems","volume":"36","author":"Candido","year":"1998","journal-title":"International Journal of Production Research"},{"issue":"9","key":"10.1016\/S0377-2217(02)00605-7_BIB5","doi-asserted-by":"crossref","first-page":"1987","DOI":"10.1080\/002075499190879","article-title":"Auto-bias selection for developing learning-based scheduling systems","volume":"37","author":"Chen","year":"1999","journal-title":"International Journal of Production Research"},{"year":"1976","series-title":"Computer and Job Shop Scheduling Theory","author":"Coffman","key":"10.1016\/S0377-2217(02)00605-7_BIB6"},{"key":"10.1016\/S0377-2217(02)00605-7_BIB7","doi-asserted-by":"crossref","unstructured":"Foo, Y.P.S., Takefuji, Y., 1988a. Stochastic neural networks for solving job-shop scheduling: Part 1, problem representation. In: Proceedings of Joint International Conference on Neural Networks, vol. 2, pp. 275\u2013282","DOI":"10.1109\/ICNN.1988.23939"},{"key":"10.1016\/S0377-2217(02)00605-7_BIB8","doi-asserted-by":"crossref","unstructured":"Foo, Y.P.S., Takefuji, Y., 1988b. Stochastic neural networks for solving job-shop scheduling: Part 2, architecture and simulations. In: Proceedings of Joint International Conference on Neural Networks, vol. 2, pp. 283\u2013290","DOI":"10.1109\/ICNN.1988.23940"},{"key":"10.1016\/S0377-2217(02)00605-7_BIB9","unstructured":"Foo, Y.P.S., Takefuji, Y., 1988c. Integer linear programming neural networks for job-shop scheduling. In: Proceedings of Joint International Conference on Neural Networks, vol. 2, pp. 341\u2013348"},{"key":"10.1016\/S0377-2217(02)00605-7_BIB10","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","article-title":"Optimization and approximation in deterministic sequencing and scheduling: A survey","volume":"5","author":"Graham","year":"1979","journal-title":"Annals of Discrete Mathematics"},{"issue":"2","key":"10.1016\/S0377-2217(02)00605-7_BIB11","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1109\/17.293383","article-title":"A review of machine learning in scheduling","volume":"41","author":"Haldun","year":"1994","journal-title":"IEEE Transactions on Engineering Management"},{"key":"10.1016\/S0377-2217(02)00605-7_BIB12","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1007\/BF00339943","article-title":"Neural computation of decisions in optimization problems","volume":"52","author":"Hopfield","year":"1985","journal-title":"Biological Cybernetics"},{"key":"10.1016\/S0377-2217(02)00605-7_BIB13","doi-asserted-by":"crossref","first-page":"841","DOI":"10.1287\/opre.9.6.841","article-title":"Parallel sequencing and assembly line problem","volume":"9","author":"Hu","year":"1961","journal-title":"Operations Research"},{"issue":"2","key":"10.1016\/S0377-2217(02)00605-7_BIB14","doi-asserted-by":"crossref","first-page":"104","DOI":"10.1109\/JRA.1985.1087004","article-title":"Parallel processing of robot-arm control computation on a multi-microprocessor system","volume":"RA-1","author":"Kasahara","year":"1985","journal-title":"IEEE Journal of Robotics and Automation"},{"key":"10.1016\/S0377-2217(02)00605-7_BIB15","unstructured":"Lo, C.C., Hsu, C.C., 1993. A parallel distributed processing technique for job-shop scheduling problems. In: Proceedings of International Joint Conference on Neural Networks, pp. 1602\u20131605"},{"issue":"2","key":"10.1016\/S0377-2217(02)00605-7_BIB16","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1016\/0045-7906(93)90039-T","article-title":"Multiple job scheduling with artificial neural networks","volume":"19","author":"Lo","year":"1993","journal-title":"Computers and Electrical Engineering"},{"key":"10.1016\/S0377-2217(02)00605-7_BIB17","doi-asserted-by":"crossref","first-page":"437","DOI":"10.1023\/A:1009684406579","article-title":"A hybrid genetic algorithm for the single machine scheduling problem","volume":"5","author":"Miller","year":"1999","journal-title":"Journal of Heuristics"},{"key":"10.1016\/S0377-2217(02)00605-7_BIB18","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1287\/opre.25.1.45","article-title":"A survey of scheduling rules","volume":"25","author":"Panwalker","year":"1977","journal-title":"Operations Research"},{"key":"10.1016\/S0377-2217(02)00605-7_BIB19","doi-asserted-by":"crossref","first-page":"297","DOI":"10.1016\/S0377-2217(99)00158-7","article-title":"A tabu search method guided by shifting bottleneck for the job-shop scheduling problem","volume":"120","author":"Pezzella","year":"2000","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(02)00605-7_BIB20","doi-asserted-by":"crossref","first-page":"156","DOI":"10.1016\/S0377-2217(98)00023-X","article-title":"A comparative study of dispatching rules in dynamic flowshops and job shops","volume":"116","author":"Rajendran","year":"1999","journal-title":"European Journal of Operational Research"},{"year":"1989","series-title":"Parallel Distributed Processing: Explorations in the Microstructure of Cognition","author":"Rumelhart","key":"10.1016\/S0377-2217(02)00605-7_BIB21"},{"key":"10.1016\/S0377-2217(02)00605-7_BIB22","doi-asserted-by":"crossref","first-page":"288","DOI":"10.1016\/0377-2217(96)00041-0","article-title":"A neural network model for scheduling problems","volume":"93","author":"Sabuncuoglu","year":"1996","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"10.1016\/S0377-2217(02)00605-7_BIB23","doi-asserted-by":"crossref","first-page":"2","DOI":"10.1080\/095372898234460","article-title":"Scheduling with neural networks: A review of the literature and new research directions","volume":"9","author":"Sabuncuoglu","year":"1998","journal-title":"Production Planning and Control"},{"key":"10.1016\/S0377-2217(02)00605-7_BIB24","doi-asserted-by":"crossref","first-page":"393","DOI":"10.1016\/S0377-2217(99)00094-6","article-title":"Fuzzy programming for multi-objective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms","volume":"120","author":"Sakawa","year":"2000","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(02)00605-7_BIB25","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1016\/0925-5273(94)90119-8","article-title":"Neural network approach for minimizing the makespan of the general job-shop","volume":"33","author":"Satake","year":"1994","journal-title":"International Journal of Production Economics"},{"key":"10.1016\/S0377-2217(02)00605-7_BIB26","doi-asserted-by":"crossref","first-page":"524","DOI":"10.1016\/S0377-2217(98)00326-9","article-title":"Two simulated annealing-based heuristics for the job shop scheduling problem","volume":"118","author":"Steinhofel","year":"1999","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(02)00605-7_BIB27","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1023\/A:1009673512884","article-title":"A tabu search approach for the resource constrained project scheduling problem","volume":"4","author":"Thomas","year":"1998","journal-title":"Journal of Heuristics"},{"key":"10.1016\/S0377-2217(02)00605-7_BIB28","doi-asserted-by":"crossref","first-page":"1271","DOI":"10.1080\/002075400188843","article-title":"Performance of decomposition algorithms for job shop scheduling problems with bottleneck machines","volume":"38","author":"Uzsoy","year":"2000","journal-title":"International Journal of Production Research"},{"issue":"3","key":"10.1016\/S0377-2217(02)00605-7_BIB29","doi-asserted-by":"crossref","first-page":"705","DOI":"10.1080\/00207549508930175","article-title":"Application of neural networks in manufacturing: A state of the art survey","volume":"33","author":"Zhang","year":"1995","journal-title":"International Journal of Production Research"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221702006057?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221702006057?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2024,12,11]],"date-time":"2024-12-11T18:53:16Z","timestamp":1733943196000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0377221702006057"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2003,12]]},"references-count":29,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2003,12]]}},"alternative-id":["S0377221702006057"],"URL":"https:\/\/doi.org\/10.1016\/s0377-2217(02)00605-7","relation":{},"ISSN":["0377-2217"],"issn-type":[{"type":"print","value":"0377-2217"}],"subject":[],"published":{"date-parts":[[2003,12]]}}}