{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,22]],"date-time":"2026-01-22T18:38:23Z","timestamp":1769107103228,"version":"3.49.0"},"reference-count":23,"publisher":"Elsevier BV","issue":"2","license":[{"start":{"date-parts":[[2003,9,1]],"date-time":"2003-09-01T00:00:00Z","timestamp":1062374400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[2003,9]]},"DOI":"10.1016\/s0377-2217(02)00766-x","type":"journal-article","created":{"date-parts":[[2003,5,19]],"date-time":"2003-05-19T17:32:55Z","timestamp":1053365575000},"page":"390-403","source":"Crossref","is-referenced-by-count":70,"title":["Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop"],"prefix":"10.1016","volume":"149","author":[{"given":"C.","family":"O\u011fuz","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"M.","family":"Fikret Ercan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"T.C.","family":"Edwin Cheng","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Y.F.","family":"Fung","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/S0377-2217(02)00766-X_BIB2","unstructured":"K.R. Baker, Elements of Sequencing and Scheduling, Dartmouth College, Hanover, 1995"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB3","doi-asserted-by":"crossref","first-page":"389","DOI":"10.1109\/TC.1986.1676781","article-title":"Scheduling multiprocessor tasks to minimize schedule length","volume":"C-35\/5","author":"B\u0142a\u017cewicz","year":"1986","journal-title":"IEEE Transactions on Computing"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB4","series-title":"Scheduling Algorithms","author":"Brucker","year":"1995"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB5","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1007\/BF02099688","article-title":"Shop scheduling problems with multiprocessor tasks on dedicated processors","volume":"57","author":"Brucker","year":"1995","journal-title":"Annals of Operations Research"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB6","series-title":"Pyramidal Architectures for Computer Vision","author":"Cantoni","year":"1994"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB7","doi-asserted-by":"crossref","first-page":"234","DOI":"10.1057\/jors.1995.28","article-title":"Analysis of classes of heuristics for scheduling a two-stage flow shop with parallel machines at one stage","volume":"46","author":"Chen","year":"1995","journal-title":"Journal of Operational Research Society"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB8","doi-asserted-by":"crossref","first-page":"215","DOI":"10.1016\/0377-2217(96)00123-3","article-title":"Scheduling multiprocessor tasks\u2013\u2013An overview","volume":"94","author":"Drozdowski","year":"1996","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB9","doi-asserted-by":"crossref","first-page":"473","DOI":"10.1137\/0402042","article-title":"Complexity of scheduling parallel task systems","volume":"2","author":"Du","year":"1989","journal-title":"SIAM Journal on Discrete Mathematics"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB10","first-page":"1303","article-title":"Real-time image interpretation on a multi-layer architecture","volume":"2","author":"Ercan","year":"1999","journal-title":"Proceedings of IEEE TENCON\u201999"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB11","first-page":"253","article-title":"A parallel architecture for computer vision","volume":"1","author":"Ercan","year":"1998","journal-title":"Proceedings of ISSPR\u201998"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB12","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1016\/S0167-5060(08)70356-X","article-title":"Optimization and approximation in deterministic sequencing and scheduling: A survey","volume":"5","author":"Graham","year":"1979","journal-title":"Annals of Discrete Mathematics"},{"issue":"4","key":"10.1016\/S0377-2217(02)00766-X_BIB13","doi-asserted-by":"crossref","first-page":"359","DOI":"10.1057\/jors.1988.63","article-title":"Two stage hybrid flowshop scheduling problem","volume":"39","author":"Gupta","year":"1988","journal-title":"Journal of Operational Research Society"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB14","doi-asserted-by":"crossref","first-page":"171","DOI":"10.1023\/A:1018976827443","article-title":"Scheduling a two-stage hybrid flow shop with parallel machines at the first stage","volume":"69","author":"Gupta","year":"1997","journal-title":"Annals of Operations Research"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB15","doi-asserted-by":"crossref","first-page":"43","DOI":"10.1016\/S0167-6377(97)00004-7","article-title":"Heuristic algorithms for the two-stage hybrid flowshop problems","volume":"21","author":"Haouari","year":"1997","journal-title":"Operations Research Letters"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB16","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","article-title":"Optimal two and three-stage production schedules with setup times included","volume":"1","author":"Johnson","year":"1954","journal-title":"Naval Research Logistics Quarterly"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB17","doi-asserted-by":"crossref","first-page":"66","DOI":"10.1016\/S0377-2217(97)00027-1","article-title":"A new constructive heuristic for the flowshop scheduling problem","volume":"105","author":"Koulamas","year":"1998","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB18","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1023\/A:1018909801944","article-title":"Current trends in deterministic scheduling","volume":"70","author":"Lee","year":"1997","journal-title":"Annals of Operations Research"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB19","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1016\/0167-6377(94)90026-4","article-title":"Minimizing makespan in hybrid flowshops","volume":"16","author":"Lee","year":"1994","journal-title":"Operations Research Letters"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB20","doi-asserted-by":"crossref","first-page":"189","DOI":"10.1287\/opre.29.1.189","article-title":"Concurrent task systems","volume":"29","author":"Lloyd","year":"1981","journal-title":"Operations Research"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB21","doi-asserted-by":"crossref","first-page":"W269","DOI":"10.1016\/S0360-8352(97)00090-9","article-title":"Scheduling multiprocessor tasks in a two-stage flow-shop environment","author":"O\u011fuz","year":"1997","journal-title":"Proceedings of 21st International Conference on Computers and Industrial Engineering"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB22","unstructured":"C. O\u011fuz, X.T. Qi, Y.F. Fung, Scheduling multiprocessor tasks in a hybrid flow-shop using a Genetic Algorithm, Working Paper No. 11\/97-8, Faculty of Business and Information Systems, The Hong Kong Polytechnic University, Hong Kong, 1998"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB23","unstructured":"C. O\u011fuz, Y. Zinder, V.H. Do, A. Janiak, M. Lichtenstein, Hybrid flow-shop scheduling problems with multiprocessor task systems, to appear in European Journal of Operations Research (2002)"},{"key":"10.1016\/S0377-2217(02)00766-X_BIB24","doi-asserted-by":"crossref","first-page":"321","DOI":"10.1016\/S0377-2217(98)00060-5","article-title":"A hybrid three-stage flowshop problem: Efficient heuristics to minimize makespan","volume":"109","author":"Riane","year":"1998","journal-title":"European Journal of Operational Research"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S037722170200766X?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S037722170200766X?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,3,30]],"date-time":"2019-03-30T03:58:53Z","timestamp":1553918333000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S037722170200766X"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2003,9]]},"references-count":23,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2003,9]]}},"alternative-id":["S037722170200766X"],"URL":"https:\/\/doi.org\/10.1016\/s0377-2217(02)00766-x","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[2003,9]]}}}