{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,13]],"date-time":"2026-02-13T06:15:09Z","timestamp":1770963309007,"version":"3.50.1"},"reference-count":16,"publisher":"Elsevier BV","issue":"1","license":[{"start":{"date-parts":[[2004,4,1]],"date-time":"2004-04-01T00:00:00Z","timestamp":1080777600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[2004,4]]},"DOI":"10.1016\/s0377-2217(02)00795-6","type":"journal-article","created":{"date-parts":[[2003,1,30]],"date-time":"2003-01-30T20:45:15Z","timestamp":1043959515000},"page":"1-19","source":"Crossref","is-referenced-by-count":29,"title":["Loading and scheduling of a flexible assembly system by mixed integer programming"],"prefix":"10.1016","volume":"154","author":[{"given":"Tadeusz","family":"Sawik","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/S0377-2217(02)00795-6_BIB1","series-title":"Scheduling in Computer and Manufacturing Systems","author":"B\u0142a\u017cewicz","year":"1994"},{"key":"10.1016\/S0377-2217(02)00795-6_BIB2","doi-asserted-by":"crossref","first-page":"637","DOI":"10.1080\/00207548908942574","article-title":"A comprehensive literature review and analysis of the design balancing, and scheduling of assembly systems","volume":"27","author":"Ghosh","year":"1989","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0377-2217(02)00795-6_BIB3","doi-asserted-by":"crossref","first-page":"510","DOI":"10.1287\/opre.44.3.510","article-title":"A survey of machine scheduling problems with blocking and no-wait in process","volume":"44","author":"Hall","year":"1996","journal-title":"Operations Research"},{"key":"10.1016\/S0377-2217(02)00795-6_BIB4","series-title":"Factory Physics: Foundations of Manufacturing Management","author":"Hopp","year":"1996"},{"issue":"10","key":"10.1016\/S0377-2217(02)00795-6_BIB5","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1016\/0360-8352(94)90226-7","article-title":"Mathematical programming for the scheduling problem with alternate process plans in FMS","volume":"27","author":"Jiang","year":"1994","journal-title":"Computers and Industrial Engineering"},{"key":"10.1016\/S0377-2217(02)00795-6_BIB6","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1016\/0377-2217(93)90257-N","article-title":"Analytical loading models in flexible manufacturing systems","volume":"71","author":"Kirkavak","year":"1993","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(02)00795-6_BIB7","doi-asserted-by":"crossref","first-page":"925","DOI":"10.1287\/opre.37.6.925","article-title":"Sequencing in an assembly line with blocking to minimize cycle time","volume":"37","author":"McCormick","year":"1989","journal-title":"Operations Research"},{"key":"10.1016\/S0377-2217(02)00795-6_BIB8","series-title":"Integer and Combinatorial Optimization","author":"Nemhauser","year":"1988"},{"key":"10.1016\/S0377-2217(02)00795-6_BIB9","series-title":"Production Planning and Scheduling in Flexible Assembly Systems","author":"Sawik","year":"1999"},{"key":"10.1016\/S0377-2217(02)00795-6_BIB10","doi-asserted-by":"crossref","first-page":"3267","DOI":"10.1080\/002075400418252","article-title":"Simultaneous versus sequential loading and scheduling of flexible assembly systems","volume":"38","author":"Sawik","year":"2000","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0377-2217(02)00795-6_BIB11","doi-asserted-by":"crossref","first-page":"3219","DOI":"10.1080\/00207540110053561","article-title":"Mixed integer programming for scheduling surface mount technology lines","volume":"39","author":"Sawik","year":"2001","journal-title":"International Journal of Production Research"},{"issue":"1","key":"10.1016\/S0377-2217(02)00795-6_BIB12","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1142\/S096031310200028X","article-title":"Scheduling of printed wiring board assembly in surface mount technology lines","volume":"11","author":"Sawik","year":"2002","journal-title":"Journal of Electronics Manufacturing"},{"issue":"9","key":"10.1016\/S0377-2217(02)00795-6_BIB13","doi-asserted-by":"crossref","first-page":"1973","DOI":"10.1080\/00207540110118677","article-title":"Balancing and scheduling of surface mount technology lines","volume":"40","author":"Sawik","year":"2002","journal-title":"International Journal of Production Research"},{"issue":"1","key":"10.1016\/S0377-2217(02)00795-6_BIB14","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1016\/S0377-2217(01)00328-9","article-title":"Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line","volume":"143","author":"Sawik","year":"2002","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(02)00795-6_BIB15","series-title":"Hierarchies in Distributed Decision Making","author":"Schneeweiss","year":"1999"},{"key":"10.1016\/S0377-2217(02)00795-6_BIB16","series-title":"Systems Approach to Computer Integrated Design and Manufacturing","author":"Singh","year":"1995"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221702007956?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221702007956?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,3,30]],"date-time":"2019-03-30T03:58:49Z","timestamp":1553918329000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0377221702007956"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2004,4]]},"references-count":16,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2004,4]]}},"alternative-id":["S0377221702007956"],"URL":"https:\/\/doi.org\/10.1016\/s0377-2217(02)00795-6","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[2004,4]]}}}