{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,1]],"date-time":"2026-04-01T09:01:56Z","timestamp":1775034116148,"version":"3.50.1"},"reference-count":17,"publisher":"Elsevier BV","issue":"3","license":[{"start":{"date-parts":[[2004,9,1]],"date-time":"2004-09-01T00:00:00Z","timestamp":1093996800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[2004,9]]},"DOI":"10.1016\/s0377-2217(03)00232-7","type":"journal-article","created":{"date-parts":[[2003,8,8]],"date-time":"2003-08-08T01:06:34Z","timestamp":1060304794000},"page":"784-790","source":"Crossref","is-referenced-by-count":38,"title":["Scheduling with tool changes to minimize total completion time: Basic results and SPT performance"],"prefix":"10.1016","volume":"157","author":[{"given":"M.Selim","family":"Akturk","sequence":"first","affiliation":[]},{"given":"Jay B.","family":"Ghosh","sequence":"additional","affiliation":[]},{"given":"Evrim D.","family":"Gunes","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/S0377-2217(03)00232-7_BIB1","doi-asserted-by":"crossref","first-page":"679","DOI":"10.1007\/BF00288977","article-title":"Single machine flow-time scheduling with a single breakdown","volume":"26","author":"Adiri","year":"1989","journal-title":"Acta Informatica"},{"key":"10.1016\/S0377-2217(03)00232-7_BIB2","doi-asserted-by":"crossref","first-page":"335","DOI":"10.1016\/0377-2217(95)00171-9","article-title":"Tool allocation and machining conditions optimization for CNC machines","volume":"94","author":"Akturk","year":"1996","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(03)00232-7_BIB3","unstructured":"M.S. Akturk, J.B. Ghosh, E.D. Gunes, Scheduling with tool changes to minimize total completion time, Technical Report, Dept. of Industrial Engr., Bilkent University, Ankara, Turkey, 1999"},{"key":"10.1016\/S0377-2217(03)00232-7_BIB4","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1002\/nav.10045","article-title":"Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance","volume":"50","author":"Akturk","year":"2003","journal-title":"Naval Research Logistics"},{"key":"10.1016\/S0377-2217(03)00232-7_BIB5","first-page":"269","article-title":"Scheduling with unexpected machine breakdowns","volume":"110","author":"Albers","year":"1999","journal-title":"Discrete Applied Mathematics"},{"key":"10.1016\/S0377-2217(03)00232-7_BIB6","doi-asserted-by":"crossref","first-page":"287","DOI":"10.1287\/opre.42.2.287","article-title":"Worst-case analysis of heuristics for the bin-packing problem with general cost structures","volume":"42","author":"Anily","year":"1994","journal-title":"Operations Research"},{"key":"10.1016\/S0377-2217(03)00232-7_BIB7","doi-asserted-by":"crossref","first-page":"136","DOI":"10.1016\/S0377-2217(96)00388-8","article-title":"Combinatorial optimization models for production scheduling in automated manufacturing systems","volume":"99","author":"Crama","year":"1997","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(03)00232-7_BIB8","doi-asserted-by":"crossref","first-page":"845","DOI":"10.1002\/(SICI)1520-6750(199910)46:7<845::AID-NAV6>3.0.CO;2-#","article-title":"Scheduling maintenance and semiresumable jobs on a single machine","volume":"46","author":"Graves","year":"1999","journal-title":"Naval Research Logistics"},{"key":"10.1016\/S0377-2217(03)00232-7_BIB9","doi-asserted-by":"crossref","first-page":"549","DOI":"10.1287\/mnsc.39.5.549","article-title":"A synthesis of decision models for tool management in automated manufacturing","volume":"39","author":"Gray","year":"1993","journal-title":"Management Science"},{"key":"10.1016\/S0377-2217(03)00232-7_BIB10","doi-asserted-by":"crossref","first-page":"201","DOI":"10.1016\/0377-2217(91)90224-J","article-title":"An optimal tool selection procedure for the initial design phase of a flexible manufacturing system","volume":"55","author":"Kouvelis","year":"1991","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(03)00232-7_BIB11","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1287\/mnsc.16.1.77","article-title":"A functional equation and its application to resource allocation and sequencing problems","volume":"16","author":"Lawler","year":"1969","journal-title":"Management Science"},{"key":"10.1016\/S0377-2217(03)00232-7_BIB12","doi-asserted-by":"crossref","first-page":"395","DOI":"10.1007\/BF00121681","article-title":"Machine scheduling with an availability constraint","volume":"9","author":"Lee","year":"1996","journal-title":"Journal of Global Optimization"},{"key":"10.1016\/S0377-2217(03)00232-7_BIB13","doi-asserted-by":"crossref","first-page":"375","DOI":"10.1007\/BF01178778","article-title":"Single machine flow-time scheduling with scheduled maintenance","volume":"29","author":"Lee","year":"1992","journal-title":"Acta Informatica"},{"key":"10.1016\/S0377-2217(03)00232-7_BIB14","doi-asserted-by":"crossref","first-page":"1071","DOI":"10.1057\/palgrave.jors.2600791","article-title":"Scheduling the maintenance on a single machine","volume":"50","author":"Qi","year":"1999","journal-title":"Journal of the Operational Research Society"},{"key":"10.1016\/S0377-2217(03)00232-7_BIB15","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/S0377-2217(98)00367-1","article-title":"Scheduling with limited machine availability","volume":"121","author":"Schmidt","year":"2000","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(03)00232-7_BIB16","doi-asserted-by":"crossref","first-page":"767","DOI":"10.1287\/opre.36.5.767","article-title":"Models arising from a flexible manufacturing machine, Part I: Minimization of the number of tool switches","volume":"36","author":"Tang","year":"1988","journal-title":"Operations Research"},{"key":"10.1016\/S0377-2217(03)00232-7_BIB17","first-page":"102","article-title":"Tooling strategies related to FMS management","volume":"5","author":"Tomek","year":"1986","journal-title":"The FMS Magazine"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221703002327?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221703002327?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,3,15]],"date-time":"2019-03-15T05:53:25Z","timestamp":1552629205000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0377221703002327"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2004,9]]},"references-count":17,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2004,9]]}},"alternative-id":["S0377221703002327"],"URL":"https:\/\/doi.org\/10.1016\/s0377-2217(03)00232-7","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[2004,9]]}}}