{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,6]],"date-time":"2026-03-06T22:07:50Z","timestamp":1772834870715,"version":"3.50.1"},"reference-count":12,"publisher":"Elsevier BV","issue":"1","license":[{"start":{"date-parts":[[1998,2,1]],"date-time":"1998-02-01T00:00:00Z","timestamp":886291200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[1998,2]]},"DOI":"10.1016\/s0377-2217(97)00035-0","type":"journal-article","created":{"date-parts":[[2003,4,5]],"date-time":"2003-04-05T00:21:01Z","timestamp":1049502061000},"page":"91-99","source":"Crossref","is-referenced-by-count":23,"title":["Capacity planning by the dynamic multi-resource generalized assignment problem (DMRGAP)"],"prefix":"10.1016","volume":"105","author":[{"given":"Avraham","family":"Shtub","sequence":"first","affiliation":[]},{"given":"Konstantin","family":"Kogan","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/S0377-2217(97)00035-0_BIB1","series-title":"Applied Optimal Control","author":"Bryson","year":"1960"},{"key":"10.1016\/S0377-2217(97)00035-0_BIB2","series-title":"Management of Distributed Data Processing","article-title":"Allocation of databases and processors in a distributed computing systems","author":"Gavish","year":"1982"},{"issue":"7","key":"10.1016\/S0377-2217(97)00035-0_BIB3","doi-asserted-by":"crossref","first-page":"583","DOI":"10.1109\/TC.1986.1676799","article-title":"Computer and database location in distributed computer systems","volume":"35","author":"Gavish","year":"1986","journal-title":"IEEE Transactions Computers"},{"issue":"6","key":"10.1016\/S0377-2217(97)00035-0_BIB4","doi-asserted-by":"crossref","first-page":"695","DOI":"10.1287\/mnsc.37.6.695","article-title":"Algorithms for the multi-resource generalized assignment problem","volume":"36","author":"Gavish","year":"1991","journal-title":"Management Science"},{"issue":"2","key":"10.1016\/S0377-2217(97)00035-0_BIB5","doi-asserted-by":"crossref","first-page":"191","DOI":"10.1137\/1037043","article-title":"A survey of the maximum principles for optimal control problems with state constraints","volume":"37","author":"Hartl","year":"1995","journal-title":"SIAM Review"},{"issue":"4","key":"10.1016\/S0377-2217(97)00035-0_BIB6","doi-asserted-by":"crossref","first-page":"353","DOI":"10.1080\/05695558308974659","article-title":"An algorithm for the computer control of a flexible manufacturing system","volume":"15","author":"Kimemia","year":"1983","journal-title":"IEEE Transactions"},{"key":"10.1016\/S0377-2217(97)00035-0_BIB7","doi-asserted-by":"crossref","first-page":"343","DOI":"10.1007\/BF01439152","article-title":"A maximum principle based combined method for scheduling in a flexible manufacturing system","volume":"5","author":"Khmelmitsky","year":"1995","journal-title":"Discrete Events Dynamic Systems"},{"issue":"3","key":"10.1016\/S0377-2217(97)00035-0_BIB8","doi-asserted-by":"crossref","first-page":"715","DOI":"10.1080\/00207549608904930","article-title":"An optimal control model for continuous time production and setup scheduling","volume":"34","author":"Kogan","year":"1996","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0377-2217(97)00035-0_BIB9","series-title":"Working Paper, 103","article-title":"A private fleet model with multi-stop backhaul","author":"Murphy","year":"1986"},{"key":"10.1016\/S0377-2217(97)00035-0_BIB10","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1007\/BF01580430","article-title":"A branch and bound algorithm for the generalized assignment problem","volume":"8","author":"Ross","year":"1975","journal-title":"Mathematical Programming"},{"key":"10.1016\/S0377-2217(97)00035-0_BIB11","doi-asserted-by":"crossref","first-page":"345","DOI":"10.1287\/mnsc.24.3.345","article-title":"Modelling facility location problems as generalized assignment problems","volume":"24","author":"Ross","year":"1977","journal-title":"Management Science"},{"key":"10.1016\/S0377-2217(97)00035-0_BIB12","series-title":"Proceedings of the Third International Conference on Computer Integrated Manufacturing","first-page":"278","article-title":"A hierarchical framework for the optimal flow control in manufacturing systems","author":"Sousa","year":"1992"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221797000350?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221797000350?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,4,22]],"date-time":"2019-04-22T23:29:52Z","timestamp":1555975792000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0377221797000350"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1998,2]]},"references-count":12,"journal-issue":{"issue":"1","published-print":{"date-parts":[[1998,2]]}},"alternative-id":["S0377221797000350"],"URL":"https:\/\/doi.org\/10.1016\/s0377-2217(97)00035-0","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[1998,2]]}}}