{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,7]],"date-time":"2026-02-07T20:41:10Z","timestamp":1770496870772,"version":"3.49.0"},"reference-count":12,"publisher":"Elsevier BV","issue":"2","license":[{"start":{"date-parts":[[1999,1,1]],"date-time":"1999-01-01T00:00:00Z","timestamp":915148800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[1999,1]]},"DOI":"10.1016\/s0377-2217(97)00424-4","type":"journal-article","created":{"date-parts":[[2003,4,5]],"date-time":"2003-04-05T00:21:01Z","timestamp":1049502061000},"page":"304-309","source":"Crossref","is-referenced-by-count":27,"title":["Stochastically minimizing the makespan in two-machine flow shops without blocking"],"prefix":"10.1016","volume":"112","author":[{"given":"Jerzy","family":"Kamburowski","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/S0377-2217(97)00424-4_BIB1","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","article-title":"Optimal two- and three-stage production schedules with setup times included","volume":"1","author":"Johnson","year":"1954","journal-title":"Naval Res. Logist. Quart."},{"key":"10.1016\/S0377-2217(97)00424-4_BIB2","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1287\/moor.1.2.117","article-title":"The complexity of flowshop and jobshop scheduling","volume":"1","author":"Garey","year":"1976","journal-title":"Math. Opns. Res."},{"key":"10.1016\/S0377-2217(97)00424-4_BIB3","first-page":"93","article-title":"A note on sequencing problems with uncertain job times","volume":"9","author":"Talwar","year":"1967","journal-title":"J. Opns. Res. Soc. Jpn."},{"key":"10.1016\/S0377-2217(97)00424-4_BIB4","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1002\/nav.3800200107","article-title":"Scheduling jobs with exponentially distributed processing times on two machines of a flow shop","volume":"16","author":"Cunnigham","year":"1973","journal-title":"Naval Res. Logist. Quart."},{"key":"10.1016\/S0377-2217(97)00424-4_BIB5","doi-asserted-by":"crossref","first-page":"130","DOI":"10.1287\/opre.34.1.130","article-title":"On Johnson's two machine flow shop with random processing times","volume":"34","author":"Ku","year":"1986","journal-title":"Opns. Res."},{"key":"10.1016\/S0377-2217(97)00424-4_BIB6","unstructured":"M. Pinedo, Scheduling: Theory, Algorithms, and Systems, Prentice-Hall, Englewood Cliffs, NJ, 1995"},{"key":"10.1016\/S0377-2217(97)00424-4_BIB7","unstructured":"M. Shaked, J.G. Shanthikumar, Stochastic Orders and their Applications, Academic Press, Boston, 1994"},{"key":"10.1016\/S0377-2217(97)00424-4_BIB8","doi-asserted-by":"crossref","first-page":"152","DOI":"10.1287\/mnsc.25.2.152","article-title":"The reversibility property of production lines","volume":"25","author":"Muth","year":"1979","journal-title":"Mgmt. Sci."},{"key":"10.1016\/S0377-2217(97)00424-4_BIB9","doi-asserted-by":"crossref","first-page":"291","DOI":"10.2307\/3212024","article-title":"A generalized bivariate exponential distribution","volume":"4","author":"Marschal","year":"1967","journal-title":"J. Appl. Prob."},{"key":"10.1016\/S0377-2217(97)00424-4_BIB10","doi-asserted-by":"crossref","first-page":"658","DOI":"10.1287\/moor.18.3.658","article-title":"Rearrangement: Majorization and stochastic scheduling","volume":"18","author":"Chang","year":"1993","journal-title":"Math. of Opns. Res."},{"key":"10.1016\/S0377-2217(97)00424-4_BIB11","doi-asserted-by":"crossref","first-page":"148","DOI":"10.1287\/opre.30.1.148","article-title":"Minimizing the expected makespan in stochastic flow shops","volume":"30","author":"Pinedo","year":"1982","journal-title":"Opns. Res."},{"key":"10.1016\/S0377-2217(97)00424-4_BIB12","doi-asserted-by":"crossref","first-page":"2067","DOI":"10.1080\/00207549408957059","article-title":"The stochastic flowshop makespan Part II. Some general results for the unbuffered case","volume":"32","author":"Middleton","year":"1994","journal-title":"Int. J. Prod. Res."}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221797004244?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221797004244?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,4,22]],"date-time":"2019-04-22T23:50:56Z","timestamp":1555977056000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0377221797004244"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1999,1]]},"references-count":12,"journal-issue":{"issue":"2","published-print":{"date-parts":[[1999,1]]}},"alternative-id":["S0377221797004244"],"URL":"https:\/\/doi.org\/10.1016\/s0377-2217(97)00424-4","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[1999,1]]}}}