{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,7]],"date-time":"2026-01-07T21:57:25Z","timestamp":1767823045390,"version":"3.49.0"},"reference-count":26,"publisher":"Elsevier BV","issue":"1","license":[{"start":{"date-parts":[[1999,4,1]],"date-time":"1999-04-01T00:00:00Z","timestamp":922924800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[1999,4]]},"DOI":"10.1016\/s0377-2217(98)00029-0","type":"journal-article","created":{"date-parts":[[2002,7,25]],"date-time":"2002-07-25T17:48:22Z","timestamp":1027619302000},"page":"59-71","source":"Crossref","is-referenced-by-count":22,"title":["Exploiting process plan flexibility in production scheduling: A multi-objective approach"],"prefix":"10.1016","volume":"114","author":[{"given":"Paolo","family":"Brandimarte","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/S0377-2217(98)00029-0_BIB1","doi-asserted-by":"crossref","first-page":"1069","DOI":"10.1057\/jors.1990.166","article-title":"OR-library: Distributing test problems by electronic mail","volume":"41","author":"Beasley","year":"1990","journal-title":"Journal of the Operational Research Society"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB2","unstructured":"J. Bla\u017aewicz, W. Cellary, R. Slowi\u0144ski, J. Weglarz, Scheduling under Resource Constraints \u2013 Deterministic Models, Annals of Operations Research 7 (1986)"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB3","doi-asserted-by":"crossref","unstructured":"V.J. Bowman, On the relationship of the tchebycheff norm and the efficient frontier of multiple-criteria problems, in: H. Thiriez, S. Zionts (Eds.), Multiple Criteria Decision Making, Lecture Notes in Economics and Mathematical Systems, vol. 130, 1975, pp. 76\u201386","DOI":"10.1007\/978-3-642-87563-2_5"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB4","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1007\/BF02023073","article-title":"Routing and scheduling in a flexible job shop by tabu search","volume":"41","author":"Brandimarte","year":"1993","journal-title":"Annals of Operations Research"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB5","unstructured":"P. Brandimarte, Machine loading with balancing and cost criteria: The case of small-batch manufacturing, Proceedings of the 10th International Conference on Computer-Aided Production Engineering (CAPE10) University of Palermo, 1994, pp. 571\u2013580"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB6","doi-asserted-by":"crossref","first-page":"161","DOI":"10.1080\/00207549508930142","article-title":"A hierarchical bicriterion approach to integrated process planning and job shop scheduling","volume":"33","author":"Brandimarte","year":"1995","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB7","doi-asserted-by":"crossref","first-page":"260","DOI":"10.1016\/0377-2217(92)90077-M","article-title":"A survey of algorithms for the generalized assignment problem","volume":"60","author":"Cattrysse","year":"1992","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB8","doi-asserted-by":"crossref","first-page":"981","DOI":"10.1002\/1520-6750(199012)37:6<981::AID-NAV3220370617>3.0.CO;2-H","volume":"37","author":"Daniels","year":"1990","journal-title":"Multiobjective flow-shop scheduling, Naval Research Logistics"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB9","unstructured":"L.F. Escudero, A mathematical formulation of a hierarchical approach for production planning in FMS, in: A. Kusiak (Ed.), Modern Production Management Systems, North Holland, 1987, pp. 231\u2013245"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB10","unstructured":"S. French, Sequencing and Scheduling: An Introduction to the Mathematics of Job Shop, Wiley, New York, 1982"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB11","doi-asserted-by":"crossref","first-page":"595","DOI":"10.1016\/0305-0483(89)90063-7","article-title":"A framework for single machine multiple objective sequencing research","volume":"17","author":"Fry","year":"1989","journal-title":"OMEGA International Journal of Management"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB12","doi-asserted-by":"crossref","first-page":"41","DOI":"10.1016\/0895-7177(94)90205-4","article-title":"Unrelated parallel machine scheduling using local search","volume":"20","author":"Glass","year":"1994","journal-title":"Mathematical and Computer Modelling"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB13","unstructured":"D.E. Goldberg, Genetic Algorithms in Search, Optimization and Machine Learning, Addison-Wesley, Reading, MA, 1989"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB14","unstructured":"H. Hoogeveen, Single-Machine Bicriteria Scheduling, CWI, Amsterdam, 1992"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB15","doi-asserted-by":"crossref","first-page":"1053","DOI":"10.1080\/00207549108930119","article-title":"Scheduling approaches for random job shop flexible manufacturing systems","volume":"29","author":"Hutchison","year":"1991","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB16","first-page":"165","article-title":"Integration of process planning and scheduling functions","volume":"1","author":"Khoshnevis","year":"1990","journal-title":"Journal of Intelligent Manufacturing"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB17","doi-asserted-by":"crossref","unstructured":"E.L. Lawler, J.K. Lenstra, A.H.G. Rinnooy Kan, D.B. Shmoys, Sequencing and scheduling: Algorithms and complexity, in: S.C. Graves, A.H.G. Rinnooy Kan, P.H. Zipkin (Eds.), Logistics of Production and Inventory, North-Holland, Amsterdam, 1993, pp. 445\u2013522","DOI":"10.1016\/S0927-0507(05)80189-6"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB18","doi-asserted-by":"crossref","first-page":"1471","DOI":"10.1080\/00207549008942806","article-title":"A mixed-integer programming approach to the machine loading and process planning problem in a process layout environment","volume":"28","author":"Liang","year":"1990","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB19","doi-asserted-by":"crossref","unstructured":"V. Narayanan, Intelligent process routing, Proceedings of the Third IEEE International Conference on CIM, Troy (NY) 1992, pp. 270\u2013277","DOI":"10.1109\/CIM.1992.639113"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB20","doi-asserted-by":"crossref","first-page":"464","DOI":"10.1287\/mnsc.32.4.464","article-title":"Scheduling with multiple performance measures: The one-machine case","volume":"32","author":"Nelson","year":"1986","journal-title":"Management Science"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB21","unstructured":"R.G. Parker, R.L. Rardin, Discrete Optimization, Academic Press, New York, 1988"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB22","doi-asserted-by":"crossref","first-page":"4","DOI":"10.1016\/0377-2217(95)00058-X","article-title":"Hierarchical structures in organizations: A conceptual framework","volume":"86","author":"Schneeweiss","year":"1995","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB23","doi-asserted-by":"crossref","first-page":"200","DOI":"10.1016\/0377-2217(92)90093-O","article-title":"A bicriterion framework for operations assignment and routing flexibility analysis in cellular manufacturing system","volume":"60","author":"Singh","year":"1992","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB24","unstructured":"R.E. Steuer, Multiple Criteria Optimization: Theory, Computation, and Application, Wiley, Chichester, UK, 1985"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB25","unstructured":"S.G. Taylor, S.F. Bolander, The rise of finite capacity scheduling, APICS: The Performance Advantage, 1996, p. 56"},{"key":"10.1016\/S0377-2217(98)00029-0_BIB26","doi-asserted-by":"crossref","first-page":"192","DOI":"10.1287\/ijoc.5.2.192","article-title":"Duality-based algorithms for scheduling unrelated parallel machines","volume":"5","author":"Van de Velde","year":"1992","journal-title":"ORSA Journal on Computing"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221798000290?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221798000290?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,4,24]],"date-time":"2019-04-24T12:59:37Z","timestamp":1556110777000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0377221798000290"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1999,4]]},"references-count":26,"journal-issue":{"issue":"1","published-print":{"date-parts":[[1999,4]]}},"alternative-id":["S0377221798000290"],"URL":"https:\/\/doi.org\/10.1016\/s0377-2217(98)00029-0","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[1999,4]]}}}