{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,13]],"date-time":"2026-02-13T15:38:28Z","timestamp":1770997108804,"version":"3.50.1"},"reference-count":11,"publisher":"Elsevier BV","issue":"2","license":[{"start":{"date-parts":[[1998,9,1]],"date-time":"1998-09-01T00:00:00Z","timestamp":904608000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[1998,9]]},"DOI":"10.1016\/s0377-2217(98)00060-5","type":"journal-article","created":{"date-parts":[[2003,4,5]],"date-time":"2003-04-05T00:21:01Z","timestamp":1049502061000},"page":"321-329","source":"Crossref","is-referenced-by-count":84,"title":["A hybrid three-stage flowshop problem: Efficient heuristics to minimize makespan"],"prefix":"10.1016","volume":"109","author":[{"given":"Fouad","family":"Riane","sequence":"first","affiliation":[]},{"given":"Abdelhakim","family":"Artiba","sequence":"additional","affiliation":[]},{"given":"Salah","family":"E. Elmaghraby","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/S0377-2217(98)00060-5_BIB1","unstructured":"F. Riane, A. Artiba, S.E. Elmaghraby, A two stages hybrid flowship problem to minimise makespan, Research Report No 310-97WR214, FUCaM, Mons, Belgium, 1997"},{"key":"10.1016\/S0377-2217(98)00060-5_BIB2","doi-asserted-by":"crossref","first-page":"B630","DOI":"10.1287\/mnsc.16.10.B630","article-title":"A heuristic algorithm for the n-job M-machine sequencing problem","volume":"16","author":"Campbell","year":"1970","journal-title":"Management Science"},{"issue":"3","key":"10.1016\/S0377-2217(98)00060-5_BIB3","doi-asserted-by":"crossref","first-page":"473","DOI":"10.1287\/opre.15.3.473","article-title":"Flowshop scheduling with the branch and bound method","volume":"15","author":"McMahon","year":"1967","journal-title":"Operations research"},{"issue":"6","key":"10.1016\/S0377-2217(98)00060-5_BIB4","doi-asserted-by":"crossref","first-page":"891","DOI":"10.1287\/opre.44.6.891","article-title":"A new heuristic for three-machine flow shop scheduling","volume":"44","author":"Chen","year":"1996","journal-title":"Operations Research"},{"key":"10.1016\/S0377-2217(98)00060-5_BIB5","unstructured":"F. Riane, A. Artiba, S.E. Elmaghraby, Sequencing on hybrid two stages flowshop to minimize makespan, Proceedings of the International Conference on Operations and Quantitative Management, Jaipur, vol. II, 1996, pp. 572\u2013579"},{"key":"10.1016\/S0377-2217(98)00060-5_BIB6","unstructured":"G.V. Botta, Planification et ordonnancement d'une succession d'ateliers avec contraintes, Vers un atelier de g\u00e9nie d\u00e9cisionnel pour le pilotage des syst\u00e8mes de production, Th\u00e8se de Doctorat, Universit\u00e9 Claude Bernard LYON I, 1996"},{"key":"10.1016\/S0377-2217(98)00060-5_BIB7","doi-asserted-by":"crossref","unstructured":"A. Guinet, Integrated and sequential approaches to schedule hybrid flowshops in make-to-stock environment, WPPC's proceedings Mons, 1996, pp. 299\u2013302","DOI":"10.1080\/00207549608904988"},{"key":"10.1016\/S0377-2217(98)00060-5_BIB8","doi-asserted-by":"crossref","unstructured":"M.C. Portmann, Scheduling methodology: optimisation and compu-search approach, in: A. Artiba, S.E. Elamghraby (Eds.), The planning and scheduling of production systems, methodologies and applications, Chapman & hall, London, 1997","DOI":"10.1007\/978-1-4613-1195-9_9"},{"key":"10.1016\/S0377-2217(98)00060-5_BIB9","first-page":"467","article-title":"A unified framework and a classification scheme to model production system","volume":"II","author":"Artiba","year":"1996","journal-title":"ICOQM's proceedings Jaipur"},{"key":"10.1016\/S0377-2217(98)00060-5_BIB10","doi-asserted-by":"crossref","first-page":"61","DOI":"10.1002\/nav.3800010110","article-title":"Optimal two stage and three stage production schedules with setup times included","volume":"1","author":"Johnson","year":"1954","journal-title":"Naval Research Logistics"},{"key":"10.1016\/S0377-2217(98)00060-5_BIB11","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1016\/0305-0483(83)90088-9","article-title":"A heuristic algorithm for the m-machine, n-job sequencing problem","volume":"11","author":"Nawaz","year":"1983","journal-title":"OMEGA"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221798000605?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221798000605?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,4,27]],"date-time":"2019-04-27T16:56:43Z","timestamp":1556384203000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0377221798000605"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1998,9]]},"references-count":11,"journal-issue":{"issue":"2","published-print":{"date-parts":[[1998,9]]}},"alternative-id":["S0377221798000605"],"URL":"https:\/\/doi.org\/10.1016\/s0377-2217(98)00060-5","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[1998,9]]}}}