{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,24]],"date-time":"2026-01-24T19:44:39Z","timestamp":1769283879750,"version":"3.49.0"},"reference-count":18,"publisher":"Elsevier BV","issue":"2","license":[{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[2000,1]]},"DOI":"10.1016\/s0377-2217(98)00376-2","type":"journal-article","created":{"date-parts":[[2003,4,4]],"date-time":"2003-04-04T19:21:01Z","timestamp":1049484061000},"page":"382-392","source":"Crossref","is-referenced-by-count":30,"title":["On-line scheduling in a surface treatment system"],"prefix":"10.1016","volume":"120","author":[{"given":"Fabrice","family":"Chauvet","sequence":"first","affiliation":[]},{"given":"Eugene","family":"Levner","sequence":"additional","affiliation":[]},{"given":"Leonid K.","family":"Meyzin","sequence":"additional","affiliation":[]},{"given":"Jean-Marie","family":"Proth","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/S0377-2217(98)00376-2_BIB1","unstructured":"Baker, K., Introduction of Sequencing and Scheduling, Wiley, New York, 1974"},{"issue":"4","key":"10.1016\/S0377-2217(98)00376-2_BIB2","doi-asserted-by":"crossref","first-page":"323","DOI":"10.1080\/09537289308919454","article-title":"An algorithm for scheduling a chemical processing tank line","volume":"4","author":"Song","year":"1993","journal-title":"Production Planning and Control"},{"key":"10.1016\/S0377-2217(98)00376-2_BIB3","doi-asserted-by":"crossref","unstructured":"W. Song, R.L. Storch, Z.B. Zabinsky, An example for scheduling a chemical processing tank line, Proceedings of the 1995 INRIA\/IEEE Symposium on Emerging Technologies and Factory Automation, Paris, IEEE Computer Society Press, Los Alamitos. 1995, 1, pp. 475\u2013482","DOI":"10.1109\/ETFA.1995.496800"},{"issue":"8","key":"10.1016\/S0377-2217(98)00376-2_BIB4","doi-asserted-by":"crossref","first-page":"807","DOI":"10.1016\/0305-0548(93)90102-O","article-title":"Determining the optimal starting times in a cyclic schedule with a given route","volume":"20","author":"Lei","year":"1993","journal-title":"Computers and Operational Research"},{"issue":"2","key":"10.1016\/S0377-2217(98)00376-2_BIB5","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1080\/07408179408966593","article-title":"Determining optimal cyclic hoist schedules in a single-hoist electroplating line","volume":"26","author":"Lei","year":"1994","journal-title":"IIE Transactions"},{"issue":"1","key":"10.1016\/S0377-2217(98)00376-2_BIB6","doi-asserted-by":"crossref","first-page":"81","DOI":"10.1023\/A:1007930010707","article-title":"Sequencing of parts in robotic cells","volume":"9","author":"Chen","year":"1997","journal-title":"International Journal of Flexible Manufacturing Systems"},{"issue":"1","key":"10.1016\/S0377-2217(98)00376-2_BIB7","doi-asserted-by":"crossref","first-page":"144","DOI":"10.1109\/70.660860","article-title":"Cyclic scheduling of a hoist with time windows constraints","volume":"14","author":"Chen","year":"1998","journal-title":"IEEE Transactions on Robotics and Automation"},{"key":"10.1016\/S0377-2217(98)00376-2_BIB8","doi-asserted-by":"crossref","first-page":"309","DOI":"10.1080\/03155986.1997.11732338","article-title":"Resolution of the cyclic multi-hoist scheduling problem with overlapping partitions","volume":"35","author":"Varnier","year":"1987","journal-title":"INFOR: Information Systems and Operational Research"},{"issue":"3","key":"10.1016\/S0377-2217(98)00376-2_BIB9","doi-asserted-by":"crossref","first-page":"501","DOI":"10.1080\/00207549408956949","article-title":"An algorithm for hoist scheduling problems","volume":"32","author":"Yih","year":"1994","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0377-2217(98)00376-2_BIB10","doi-asserted-by":"crossref","first-page":"47","DOI":"10.1016\/0360-8352(94)90234-8","article-title":"Optimizing robot's service movement in a robot centered F.M.S","volume":"27","author":"Park","year":"1994","journal-title":"Computer and Industrial Engineering"},{"issue":"2","key":"10.1016\/S0377-2217(98)00376-2_BIB11","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1016\/0272-6963(84)90030-5","article-title":"Two heuristics for the deterministic single-operator multiple-machine multiple-run cyclic scheduling problem","volume":"4","author":"Aronson","year":"1984","journal-title":"Journal of Operations Management"},{"key":"10.1016\/S0377-2217(98)00376-2_BIB12","doi-asserted-by":"crossref","first-page":"625","DOI":"10.1057\/jors.1990.86","article-title":"Scheduling parts in a combined production-transportation work cell","volume":"41","author":"Stern","year":"1990","journal-title":"Journal of the Operational Research Society"},{"key":"10.1016\/S0377-2217(98)00376-2_BIB13","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1287\/opre.25.1.45","article-title":"A survey of scheduling rules","volume":"25","author":"Panwalkar","year":"1977","journal-title":"Operations Research"},{"issue":"1","key":"10.1016\/S0377-2217(98)00376-2_BIB14","doi-asserted-by":"crossref","first-page":"2","DOI":"10.1080\/09537289408919468","article-title":"Classification and review of FMS scheduling procedures","volume":"5","author":"Rachamadugu","year":"1994","journal-title":"Production Planning and Control"},{"key":"10.1016\/S0377-2217(98)00376-2_BIB15","unstructured":"T.E. Morton, D.W. Pentico, Heuristic Scheduling Systems in Applications to Production Systems and Project Management, Wiley, New York, 1993"},{"key":"10.1016\/S0377-2217(98)00376-2_BIB16","doi-asserted-by":"crossref","unstructured":"J.W. Herrman, C.-Y. Lee, J.L. Snowdon, \u201cA classification of static scheduling problems\u201d, in: Complexity in Numerical Optimization, P.M. Pardalos (Ed.), World Scientific Publishing Co., Singapore. 1993, pp. 203\u2013253","DOI":"10.1142\/9789814354363_0011"},{"key":"10.1016\/S0377-2217(98)00376-2_BIB17","doi-asserted-by":"crossref","first-page":"80","DOI":"10.1080\/07408179308964280","article-title":"Robot task scheduling in a flexible manufacturing cell","volume":"25","author":"King","year":"1993","journal-title":"IIE Transactions"},{"key":"10.1016\/S0377-2217(98)00376-2_BIB18","doi-asserted-by":"crossref","unstructured":"M. Matsuo, J.S. Shang, R.S. Sullivan, A crane scheduling problem in a computer integrated manufacturing environment, Management Science (5) (1991) pp. 587\u2013606","DOI":"10.1287\/mnsc.37.5.587"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221798003762?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221798003762?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,4,24]],"date-time":"2019-04-24T09:22:01Z","timestamp":1556097721000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0377221798003762"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2000,1]]},"references-count":18,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2000,1]]}},"alternative-id":["S0377221798003762"],"URL":"https:\/\/doi.org\/10.1016\/s0377-2217(98)00376-2","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[2000,1]]}}}