{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,7]],"date-time":"2026-02-07T21:35:00Z","timestamp":1770500100468,"version":"3.49.0"},"reference-count":14,"publisher":"Elsevier BV","issue":"1","license":[{"start":{"date-parts":[[1998,8,1]],"date-time":"1998-08-01T00:00:00Z","timestamp":901929600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[1998,8]]},"DOI":"10.1016\/s0377-2217(98)80011-8","type":"journal-article","created":{"date-parts":[[2002,7,25]],"date-time":"2002-07-25T17:48:22Z","timestamp":1027619302000},"page":"170-182","source":"Crossref","is-referenced-by-count":43,"title":["A capacity allocation problem with integer side constraints"],"prefix":"10.1016","volume":"109","author":[{"given":"L.Beril","family":"Toktay","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Reha","family":"Uzsoy","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/S0377-2217(98)80011-8_BIB1","doi-asserted-by":"crossref","first-page":"335","DOI":"10.1016\/0377-2217(91)90265-W","article-title":"A facet generation and relaxation technique applied to an assignment problem with side constraints","volume":"50","author":"Aboudi","year":"1991","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(98)80011-8_BIB2","series-title":"Network Flows: Theory, Algorithms and Applications","author":"Ahuja","year":"1993"},{"key":"10.1016\/S0377-2217(98)80011-8_BIB3","series-title":"Proceedings of the Ninth IEEE International Electronics Manufacturing Technology Symposium","article-title":"Hierarchical real-time scheduling of a semiconductor fabrication facility","author":"Bai","year":"1990"},{"key":"10.1016\/S0377-2217(98)80011-8_BIB4","author":"CPLEX Optimization, Inc","year":"1993","journal-title":"Using the CPLEX Callable Library and CPLEX Mixed Integer Library"},{"key":"10.1016\/S0377-2217(98)80011-8_BIB5","series-title":"Knowledge-Based Production Management Systems","article-title":"A constraint based scheduling system for VLSI wafer fabrication","author":"Elleby","year":"1989"},{"key":"10.1016\/S0377-2217(98)80011-8_BIB6","doi-asserted-by":"crossref","first-page":"36","DOI":"10.1109\/66.4371","article-title":"Closed-loop job release control for VLSI circuit manufacturing","volume":"1","author":"Glassey","year":"1988","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"10.1016\/S0377-2217(98)80011-8_BIB7","doi-asserted-by":"crossref","first-page":"197","DOI":"10.1016\/0272-6963(83)90004-9","article-title":"Scheduling of re-entrant flow shops","volume":"3","author":"Graves","year":"1983","journal-title":"Journal of Operations Management"},{"key":"10.1016\/S0377-2217(98)80011-8_BIB8","series-title":"Intelligent Scheduling Systems","article-title":"Intelligently scheduling semiconductor wafer fabrication","author":"Kempf","year":"1994"},{"key":"10.1016\/S0377-2217(98)80011-8_BIB9","doi-asserted-by":"crossref","first-page":"374","DOI":"10.1109\/66.311341","article-title":"Efficient scheduling policies to reduce mean and variance of cycle time in semiconductor manufacturing plants","volume":"7","author":"Lu","year":"1994","journal-title":"IEEE Transactions on Semiconductor Manufacturing"},{"key":"10.1016\/S0377-2217(98)80011-8_BIB10","doi-asserted-by":"crossref","first-page":"313","DOI":"10.1002\/net.3230190305","article-title":"Network synthesis and optimum network design problems: Models, solution methods and applications","volume":"19","author":"Minoux","year":"1989","journal-title":"Networks"},{"key":"10.1016\/S0377-2217(98)80011-8_BIB11","series-title":"Semiconductor Integrated Circuit Processing Technology","author":"Runyan","year":"1990"},{"key":"10.1016\/S0377-2217(98)80011-8_BIB12","first-page":"47","article-title":"A review of production planning and scheduling models in the semiconductor industry \u2014 Part I: System characteristics, performance evaluation and production planning","volume":"4","author":"Uzsoy","year":"1992","journal-title":"IEE Transactions on Scheduling and Logistics"},{"key":"10.1016\/S0377-2217(98)80011-8_BIB13","first-page":"44","article-title":"A review of production planning and scheduling models in the semiconductor industry \u2014 Part II: Shop-floor control","volume":"26","author":"Uzsoy","year":"1994","journal-title":"IIE Transactions on Scheduling and Logistics"},{"key":"10.1016\/S0377-2217(98)80011-8_BIB14","doi-asserted-by":"crossref","first-page":"115","DOI":"10.1109\/66.4384","article-title":"Scheduling semiconductor wafer fabrication","volume":"1","author":"Wein","year":"1988","journal-title":"IEEE Transactions on Semiconductor Manufacturing"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221798800118?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221798800118?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,4,24]],"date-time":"2019-04-24T12:57:28Z","timestamp":1556110648000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0377221798800118"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1998,8]]},"references-count":14,"journal-issue":{"issue":"1","published-print":{"date-parts":[[1998,8]]}},"alternative-id":["S0377221798800118"],"URL":"https:\/\/doi.org\/10.1016\/s0377-2217(98)80011-8","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[1998,8]]}}}