{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,10]],"date-time":"2025-10-10T12:25:35Z","timestamp":1760099135619},"reference-count":16,"publisher":"Elsevier BV","issue":"2","license":[{"start":{"date-parts":[[1999,12,1]],"date-time":"1999-12-01T00:00:00Z","timestamp":944006400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[1999,12]]},"DOI":"10.1016\/s0377-2217(99)00149-6","type":"journal-article","created":{"date-parts":[[2003,4,5]],"date-time":"2003-04-05T00:21:01Z","timestamp":1049502061000},"page":"495-509","source":"Crossref","is-referenced-by-count":8,"title":["Learning to improve reliability during system development"],"prefix":"10.1016","volume":"119","author":[{"given":"Lesley","family":"Walls","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"John","family":"Quigley","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/S0377-2217(99)00149-6_BIB1","doi-asserted-by":"crossref","unstructured":"Ansell, J.I., Phillips, M.J., 1994. Practical Methods for Reliability Data. Oxford Science, Oxford","DOI":"10.1093\/oso\/9780198536642.001.0001"},{"key":"10.1016\/S0377-2217(99)00149-6_BIB2","doi-asserted-by":"crossref","unstructured":"Ansell, J.I., Walls, L.A., Quigley, J.L., 1999. Achieving growth in reliability. Annals of OR, to appear","DOI":"10.1023\/A:1018985303897"},{"key":"10.1016\/S0377-2217(99)00149-6_BIB3","unstructured":"BS5760, Part 1, British Standards Institute, Milton Keynes"},{"key":"10.1016\/S0377-2217(99)00149-6_BIB4","doi-asserted-by":"crossref","first-page":"220","DOI":"10.2307\/2291146","article-title":"Inference and predictions from Poisson point processes incorporating expert judgement","volume":"90","author":"Campodonico","year":"1995","journal-title":"Journal of the American Statistical Association"},{"key":"10.1016\/S0377-2217(99)00149-6_BIB5","doi-asserted-by":"crossref","unstructured":"Cannon, A.G., Bendell, A., 1991. Reliability Data Banks. Elsevier Applied Science, London","DOI":"10.1007\/978-94-011-3858-1"},{"key":"10.1016\/S0377-2217(99)00149-6_BIB6","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1016\/0951-8320(95)00111-5","article-title":"Design of reliability databases, Part 1: Review of standard design concepts","volume":"51","author":"Cooke","year":"1996","journal-title":"Reliability Engineering and System Safety"},{"key":"10.1016\/S0377-2217(99)00149-6_BIB7","doi-asserted-by":"crossref","unstructured":"Crowder, M.J., Kimber, A.C., Smith, R.L., Sweeting, T.J., 1991. Statistical Analysis of Reliability Data. Chapman & Hall, London","DOI":"10.1007\/978-1-4899-2953-2"},{"key":"10.1016\/S0377-2217(99)00149-6_BIB8","doi-asserted-by":"crossref","unstructured":"Duane, J.T., 1964. Learning curve approach to reliability monitoring. IEEE Transactions on Aerospace 2, 563\u2013566","DOI":"10.1109\/TA.1964.4319640"},{"key":"10.1016\/S0377-2217(99)00149-6_BIB9","first-page":"45","article-title":"How to model reliability growth when times of design modifications are known","volume":"R-45","author":"Ebrahimi","year":"1996","journal-title":"IEEE Transactions on Reliability"},{"key":"10.1016\/S0377-2217(99)00149-6_BIB10","doi-asserted-by":"crossref","unstructured":"Kerscher, W.J., Booker, J.M., Bemet, T.R., Meyer, M.A., 1998. Characterizing reliability in a product\/process design-assurance program. In: Proceedings of the Annual Reliability and Maintainability Symposium, pp. 105\u2013112","DOI":"10.1109\/RAMS.1998.653645"},{"key":"10.1016\/S0377-2217(99)00149-6_BIB11","unstructured":"Leitch, R.D., 1995. Reliability Analysis for Engineers. Oxford Science, Oxford"},{"key":"10.1016\/S0377-2217(99)00149-6_BIB12","doi-asserted-by":"crossref","first-page":"168","DOI":"10.2307\/2987608","article-title":"Bayesian analysis of a commonly used model for describing software failures","volume":"32","author":"Meinhold","year":"1983","journal-title":"The Statistician"},{"key":"10.1016\/S0377-2217(99)00149-6_BIB13","unstructured":"O'Connor, P.D.T., 1991. Practical Reliability Engineering. Wiley, Chichester"},{"key":"10.1016\/S0377-2217(99)00149-6_BIB14","unstructured":"O'Connor, P.D.T., 1994. The Practice of Engineering Management. Wiley, Chichester"},{"key":"10.1016\/S0377-2217(99)00149-6_BIB15","unstructured":"Quigley, J.L., 1998. Managing information from a reliability growth development programme. Ph.D Thesis, University of Strathclyde"},{"key":"10.1016\/S0377-2217(99)00149-6_BIB16","unstructured":"Walls, L.A., Quigley, J.L., 1998. Eliciting prior distributions from engineering experts to support Bayesian reliability growth modelling. Department of Management Science Report, University of Strathclyde, Glasgow"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221799001496?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221799001496?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2023,12,31]],"date-time":"2023-12-31T23:21:42Z","timestamp":1704064902000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0377221799001496"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1999,12]]},"references-count":16,"journal-issue":{"issue":"2","published-print":{"date-parts":[[1999,12]]}},"alternative-id":["S0377221799001496"],"URL":"https:\/\/doi.org\/10.1016\/s0377-2217(99)00149-6","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[1999,12]]}}}