{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,3,30]],"date-time":"2022-03-30T17:39:02Z","timestamp":1648661942699},"reference-count":10,"publisher":"Elsevier BV","issue":"2","license":[{"start":{"date-parts":[[2000,4,1]],"date-time":"2000-04-01T00:00:00Z","timestamp":954547200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[2000,4]]},"DOI":"10.1016\/s0377-2217(99)00236-2","type":"journal-article","created":{"date-parts":[[2002,7,25]],"date-time":"2002-07-25T13:48:22Z","timestamp":1027604902000},"page":"329-338","source":"Crossref","is-referenced-by-count":4,"title":["Modelling multi-stage manufacturing systems for efficient scheduling"],"prefix":"10.1016","volume":"122","author":[{"given":"Christoforos","family":"Charalambous","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Turaj","family":"Tahmassebi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Khalil","family":"Hindi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/S0377-2217(99)00236-2_BIB1","doi-asserted-by":"crossref","first-page":"234","DOI":"10.1057\/jors.1995.28","article-title":"Analysis of classes of heuristics for scheduling a two-stage flow-shop with parallel machines at one stage","volume":"46","author":"Chen","year":"1995","journal-title":"Journal of Operations Research Society"},{"key":"10.1016\/S0377-2217(99)00236-2_BIB2","doi-asserted-by":"crossref","first-page":"333","DOI":"10.1016\/0098-1354(94)85030-5","article-title":"Job scheduling in petrochemical production: Two-stage processing with finite intermediate storage","volume":"18\/4","author":"Deal","year":"1994","journal-title":"Computers and Chemical Engineering"},{"key":"10.1016\/S0377-2217(99)00236-2_BIB3","doi-asserted-by":"crossref","first-page":"S395","DOI":"10.1016\/S0098-1354(98)00080-5","article-title":"General approach and tool for scheduling of complex production systems","volume":"S22","author":"Graells","year":"1998","journal-title":"Computers and Chemical Engineering"},{"issue":"2","key":"10.1016\/S0377-2217(99)00236-2_BIB4","doi-asserted-by":"crossref","first-page":"211","DOI":"10.1016\/0098-1354(93)80015-F","article-title":"A general algorithm for short-term scheduling of batch operations \u2013 I. MILP formulation","volume":"17","author":"Kondili","year":"1993","journal-title":"Computers and Chemical Engineering"},{"key":"10.1016\/S0377-2217(99)00236-2_BIB5","doi-asserted-by":"crossref","first-page":"226","DOI":"10.1016\/S0377-2217(97)00260-9","article-title":"The flow shop with parallel machines: A tabu search approach","volume":"106","author":"Nowicki","year":"1998","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(99)00236-2_BIB6","doi-asserted-by":"crossref","first-page":"797","DOI":"10.1016\/0098-1354(93)E0021-Z","article-title":"Optimal scheduling of multistage multiproduct continuous plants","volume":"19","author":"Pinto","year":"1994","journal-title":"Computers and Chemical Engineering"},{"key":"10.1016\/S0377-2217(99)00236-2_BIB7","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1016\/0098-1354(91)87008-W","article-title":"MINLP model for cyclic multiproduct scheduling on continuous parallel lines","volume":"15","author":"Sahinidis","year":"1991","journal-title":"Computers and Chemical Engineering"},{"key":"10.1016\/S0377-2217(99)00236-2_BIB8","doi-asserted-by":"crossref","first-page":"88","DOI":"10.1016\/0377-2217(91)90148-O","article-title":"Branch and bound algorithm for the flow-shop with multiple processors","volume":"51","author":"Shaukat","year":"1991","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(99)00236-2_BIB9","doi-asserted-by":"crossref","first-page":"S403","DOI":"10.1016\/S0098-1354(98)00081-7","article-title":"Improving the efficiency of discrete time scheduling formulation","volume":"S22","author":"Yee","year":"1998","journal-title":"Computers and Chemical Engineering"},{"key":"10.1016\/S0377-2217(99)00236-2_BIB10","unstructured":"M.G. Zentner, G.V. Reklaitis, An interval based mathematical model for the scheduling of the resource-constrained batch chemical processes, in: Proceedings of NATO ASI on Batch Processing Systems Engineering, Antalya, Turkey, 1992"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221799002362?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221799002362?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,4,24]],"date-time":"2019-04-24T09:22:39Z","timestamp":1556097759000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0377221799002362"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2000,4]]},"references-count":10,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2000,4]]}},"alternative-id":["S0377221799002362"],"URL":"https:\/\/doi.org\/10.1016\/s0377-2217(99)00236-2","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[2000,4]]}}}