{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,21]],"date-time":"2026-02-21T18:07:54Z","timestamp":1771697274406,"version":"3.50.1"},"reference-count":37,"publisher":"Elsevier BV","issue":"3","license":[{"start":{"date-parts":[[2000,12,1]],"date-time":"2000-12-01T00:00:00Z","timestamp":975628800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["European Journal of Operational Research"],"published-print":{"date-parts":[[2000,12]]},"DOI":"10.1016\/s0377-2217(99)00347-1","type":"journal-article","created":{"date-parts":[[2003,4,5]],"date-time":"2003-04-05T00:21:01Z","timestamp":1049502061000},"page":"619-638","source":"Crossref","is-referenced-by-count":81,"title":["Bidirectional planning: improving priority rule-based heuristics for scheduling resource-constrained projects"],"prefix":"10.1016","volume":"127","author":[{"given":"Robert","family":"Klein","sequence":"first","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/S0377-2217(99)00347-1_BIB1","doi-asserted-by":"crossref","unstructured":"Alvarez-Valdez, R., Tamarit, J.M., 1989. Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis. In: Slowinski, R., Weglarz, J. (Eds.), Advances in Project Scheduling. Elsevier, Amsterdam, pp. 113\u2013134","DOI":"10.1016\/B978-0-444-87358-3.50009-2"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB2","series-title":"Industrial Systems: Planning, Analysis, Control","author":"Bedworth","year":"1973"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB3","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/0377-2217(90)90116-S","article-title":"Some efficient multi-heuristic procedures for resource-constrained project scheduling","volume":"49","author":"Boctor","year":"1990","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB4","doi-asserted-by":"crossref","unstructured":"Brand, J.D., Meyer, W.L., Shaffer, L.R., 1964. The resource scheduling method for construction. Civil Engineering Studies Report No. 5, University of Illinois","DOI":"10.1080\/00207167508803018"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB5","unstructured":"Brooks, G.H., White, C.R., 1965. An algorithm for finding optimal or near optimal solutions to the production scheduling problem. Journal of Industrial Engineering, January\u2013February, 34\u201340"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB6","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/S0377-2217(98)00204-5","article-title":"Resource-constrained project scheduling: Notation, classification, models, and methods","volume":"112","author":"Brucker","year":"1999","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB7","doi-asserted-by":"crossref","first-page":"272","DOI":"10.1016\/S0377-2217(97)00335-4","article-title":"A branch and bound algorithm for the resource-constrained project scheduling problem","volume":"107","author":"Brucker","year":"1998","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB8","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1287\/mnsc.22.11.1186","article-title":"Heuristics for scheduling resource-constrained projects: An experimental investigation","volume":"22","author":"Cooper","year":"1976","journal-title":"Management Science"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB9","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1007\/BF02023076","article-title":"Applying tabu search to the job-shop scheduling problem","volume":"41","author":"Dell\u2019Amico","year":"1993","journal-title":"Annals of Operations Research"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB10","doi-asserted-by":"crossref","first-page":"1485","DOI":"10.1287\/mnsc.43.11.1485","article-title":"New benchmark results for the resource-constrained project scheduling problem","volume":"43","author":"Demeulemeester","year":"1997","journal-title":"Management Science"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB11","doi-asserted-by":"crossref","first-page":"1590","DOI":"10.1287\/mnsc.37.12.1590","article-title":"Project scheduling by job assignment","volume":"37","author":"Drexl","year":"1991","journal-title":"Management Science"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB12","doi-asserted-by":"crossref","first-page":"299","DOI":"10.1080\/00207548608919730","article-title":"Heuristics for resource-constrained project scheduling","volume":"24","author":"Elsayed","year":"1986","journal-title":"International Journal of Production Research"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB13","doi-asserted-by":"crossref","first-page":"279","DOI":"10.1016\/S0305-0548(97)00055-5","article-title":"Resource-constrained project scheduling \u2013 A survey of recent developments","volume":"25","author":"Herroelen","year":"1998","journal-title":"Computers and Operations Research"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB14","unstructured":"Kelley, J.E., 1963. The critical path method: Resources planning and scheduling. In: Muth, J.F., Thompson, G.L. (Eds.), Industrial Scheduling. Prentice-Hall, Englewood Cliffs, NJ, pp. 347\u2013365"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB15","doi-asserted-by":"crossref","unstructured":"Klein, R., 1999. Scheduling of Resource-Constrained Projects. Kluwer, Dordrecht","DOI":"10.1007\/978-1-4615-4629-0"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB16","doi-asserted-by":"crossref","first-page":"322","DOI":"10.1016\/S0377-2217(97)00442-6","article-title":"Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling","volume":"112","author":"Klein","year":"1999","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB17","unstructured":"Klein, R., Scholl, A., 1998a. Progress: Optimally solving the generalized resource-constrained project scheduling problem. Working paper, University of Technology, Darmstadt"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB18","unstructured":"Klein, R., Scholl, A., 1998b. Scattered branch and bound: An adaptive search strategy applied to resource-constrained project scheduling, Working paper, University of Technology, Darmstadt"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB19","doi-asserted-by":"crossref","unstructured":"Kolisch, R., 1995. Project Scheduling Under Resource Constraints \u2013 Efficient Heuristics for Several Problem Classes. Physica-Verlag, Heidelberg","DOI":"10.1007\/978-3-642-50296-5"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB20","doi-asserted-by":"crossref","first-page":"179","DOI":"10.1016\/0272-6963(95)00032-1","article-title":"Efficient priority rules for the resource-constrained project scheduling problem","volume":"14","author":"Kolisch","year":"1996","journal-title":"Journal of Operations Management"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB21","doi-asserted-by":"crossref","first-page":"320","DOI":"10.1016\/0377-2217(95)00357-6","article-title":"Serial and parallel resource-constrained project scheduling methods revisited \u2013 Theory and computation","volume":"90","author":"Kolisch","year":"1996","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB22","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1002\/(SICI)1520-6750(199602)43:1<23::AID-NAV2>3.0.CO;2-P","article-title":"Adaptive search for solving hard project scheduling problems","volume":"43","author":"Kolisch","year":"1996","journal-title":"Naval Research Logistics"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB23","doi-asserted-by":"crossref","unstructured":"Kolisch, R., Hartmann, S., 1999. Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis. In: Weglarz, J. (Ed.), Handbook on Recent Advances in Project Scheduling. Kluwer, Dordrecht, pp. 147\u2013178","DOI":"10.1007\/978-1-4615-5533-9_7"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB24","unstructured":"Kolisch, R., Padman, R., 1997. An integrated survey of project scheduling \u2013 Models, algorithms, problems, and applications. Working paper, University of Kiel"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB25","doi-asserted-by":"crossref","first-page":"1693","DOI":"10.1287\/mnsc.41.10.1693","article-title":"Characterization and generation of a general class of resource-constrained project scheduling problems","volume":"41","author":"Kolisch","year":"1995","journal-title":"Management Science"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB26","doi-asserted-by":"crossref","first-page":"370","DOI":"10.1016\/0377-2217(92)90320-9","article-title":"An iterative scheduling technique for resource-constrained project scheduling","volume":"56","author":"Li","year":"1992","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB27","doi-asserted-by":"crossref","unstructured":"Maroto, C., Tormos, P., Lova, A., 1999. The evolution of software quality in project scheduling. In: Weglarz, J. (Ed.), Handbook on Recent Advances in Project Scheduling. Kluwer, Dordrecht, pp. 239\u2013260","DOI":"10.1007\/978-1-4615-5533-9_11"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB28","doi-asserted-by":"crossref","first-page":"714","DOI":"10.1287\/mnsc.44.5.714","article-title":"An exact algorithm for project scheduling with resource constraints based on a new mathematical formulation","volume":"44","author":"Mingozzi","year":"1998","journal-title":"Management Science"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB29","doi-asserted-by":"crossref","first-page":"193","DOI":"10.1016\/0272-6963(95)00015-1","article-title":"An iterative local constraint-based analysis for solving the resource-constrained project scheduling problem","volume":"14","author":"\u00d6zdamar","year":"1996","journal-title":"Journal of Operations Management"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB30","doi-asserted-by":"crossref","first-page":"400","DOI":"10.1016\/0377-2217(94)00272-X","article-title":"A note on an iterative forward\/backward scheduling technique with a reference to a procedure of Li and Willis","volume":"89","author":"\u00d6zdamar","year":"1996","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB31","doi-asserted-by":"crossref","first-page":"854","DOI":"10.1287\/mnsc.30.7.854","article-title":"A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem","volume":"30","author":"Patterson","year":"1984","journal-title":"Management Science"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB32","doi-asserted-by":"crossref","first-page":"319","DOI":"10.1287\/ijoc.9.4.319","article-title":"Salome: A bidirectional approach for assembly line balancing","volume":"9","author":"Scholl","year":"1997","journal-title":"INFORMS Journal on Computing"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB33","doi-asserted-by":"crossref","first-page":"217","DOI":"10.1007\/BF00127358","article-title":"Simple assembly line balancing heuristic approaches","volume":"2","author":"Scholl","year":"1996","journal-title":"Journal of Heuristics"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB34","unstructured":"Sprecher, A., 1997. Solving the RCPSP efficiently at modest memory requirements. Working paper, University of Kiel"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB35","doi-asserted-by":"crossref","first-page":"94","DOI":"10.1016\/0377-2217(93)E0294-8","article-title":"Semiactive, active and nondelay schedules for the resource-constrained project scheduling problem","volume":"80","author":"Sprecher","year":"1995","journal-title":"European Journal of Operational Research"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB36","doi-asserted-by":"crossref","first-page":"34","DOI":"10.1057\/palgrave.jors.2600318","article-title":"An investigation into the relationship of heuristic performance with network-resource characteristics","volume":"48","author":"Thomas","year":"1997","journal-title":"Journal of Operational Research Society"},{"key":"10.1016\/S0377-2217(99)00347-1_BIB37","doi-asserted-by":"crossref","first-page":"1145","DOI":"10.1057\/jors.1989.196","article-title":"Heuristic performance and network\/resource characteristics in resource-constrained project scheduling","volume":"40","author":"Ulusoy","year":"1989","journal-title":"Journal of the Operational Research Society"}],"container-title":["European Journal of Operational Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221799003471?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0377221799003471?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2020,1,13]],"date-time":"2020-01-13T05:41:43Z","timestamp":1578894103000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0377221799003471"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2000,12]]},"references-count":37,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2000,12]]}},"alternative-id":["S0377221799003471"],"URL":"https:\/\/doi.org\/10.1016\/s0377-2217(99)00347-1","relation":{},"ISSN":["0377-2217"],"issn-type":[{"value":"0377-2217","type":"print"}],"subject":[],"published":{"date-parts":[[2000,12]]}}}