{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,1]],"date-time":"2025-11-01T02:25:48Z","timestamp":1761963948390},"reference-count":14,"publisher":"Elsevier BV","issue":"3-5","license":[{"start":{"date-parts":[[2002,9,1]],"date-time":"2002-09-01T00:00:00Z","timestamp":1030838400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Mathematics and Computers in Simulation"],"published-print":{"date-parts":[[2002,9]]},"DOI":"10.1016\/s0378-4754(02)00020-4","type":"journal-article","created":{"date-parts":[[2002,10,11]],"date-time":"2002-10-11T21:02:06Z","timestamp":1034370126000},"page":"277-291","source":"Crossref","is-referenced-by-count":14,"title":["A study of scheduling problem in agro-food manufacturing systems"],"prefix":"10.1016","volume":"60","author":[{"given":"E.","family":"Gargouri","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"S.","family":"Hammadi","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"P.","family":"Borne","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"key":"10.1016\/S0378-4754(02)00020-4_BIB1","unstructured":"A. Artiba, Contribution \u00e0 la construction d\u2019un syst\u00e8me d\u2019aide \u00e0 la planification et \u00e0 l\u2019ordonnancement des lignes parall\u00e8les multi-produits. Th\u00e8se soutenue le 26 d\u00e9cembre 1990\u00e0 l\u2019universit\u00e9 de Valenciennes et du Hainaut-Cambresis."},{"issue":"6","key":"10.1016\/S0378-4754(02)00020-4_BIB2","doi-asserted-by":"crossref","first-page":"1555","DOI":"10.1080\/00207549608904984","article-title":"A new method for workshop real time scheduling","volume":"34","author":"Billaut","year":"1996","journal-title":"Int. J. Prod. Res."},{"key":"10.1016\/S0378-4754(02)00020-4_BIB3","doi-asserted-by":"crossref","unstructured":"D. Dubois, H. Fargier, H. Prade, Fuzzy Constraints in job-shop scheduling, Journal of Intelligent Manufacturing 6 (1995) 215\u2013234.","DOI":"10.1007\/BF00128646"},{"key":"10.1016\/S0378-4754(02)00020-4_BIB4","unstructured":"P. Esquiriol, P. Lopez, L\u2019Ordonnancement, ISBN 2-7178-3798-1: 1999 Edition Economica."},{"key":"10.1016\/S0378-4754(02)00020-4_BIB5","doi-asserted-by":"crossref","unstructured":"L. Franchini, E. Caillaud, G. Lacoste, Planning and Scheduling Skills: A Case Study on Agro-Food Industry, Proceedings of IEEE-International Conference on System Man and Cybernetic, October 1998, San Diego, USA.","DOI":"10.1109\/ICSMC.1998.725447"},{"key":"10.1016\/S0378-4754(02)00020-4_BIB6","unstructured":"J.C. Hennet, Scheduling problems and techniques for production system, LAAS France report no. 95518, December 1995."},{"key":"10.1016\/S0378-4754(02)00020-4_BIB7","unstructured":"J.C. Hennet, C.A.S. Passos, Lot sizing and scheduling in multistage production system, LAAS France report no. 99252, August 1999."},{"key":"10.1016\/S0378-4754(02)00020-4_BIB8","unstructured":"N. Mebarki, H. Pierreval, S\u00e9lection dynamique de r\u00e8gles de priorit\u00e9s pour les ateliers flexibles, 5\u00e9me congr\u00e8s international du g\u00e9nie industriel, Vol. II, April 1994, pp. 151\u2013160."},{"key":"10.1016\/S0378-4754(02)00020-4_BIB9","unstructured":"F. Roubellat, J.C. Billaut, A decision support system for real time production scheduling, LAAS France report no. 92459, December 1992."},{"key":"10.1016\/S0378-4754(02)00020-4_BIB10","unstructured":"F. Roubellat, A method and software for workshop real time scheduling, LAAS France report no. 96064, February 1996."},{"key":"10.1016\/S0378-4754(02)00020-4_BIB11","unstructured":"M. Tadahiko, M. Gen, H. Ischibuchi, Scheduling Criteria for Interval Flowshop Scheduling Problem, TSI Press, Albuquerque, NM, USA, 1998 (ISSCI-075.1-ISSCI-075.6)."},{"key":"10.1016\/S0378-4754(02)00020-4_BIB12","unstructured":"R. Treillon, C. Lecomte, Gestion Industrielle des entreprises alimentaires, Lavoisier TEC&DOC, Paris, 1996."},{"key":"10.1016\/S0378-4754(02)00020-4_BIB13","unstructured":"V. Thomas, Aide \u00e0 la d\u00e9cision pour l\u2019ordonnancement d\u2019atelier en temps r\u00e9el, Th\u00e8se soutenue l\u2019Universit\u00e9 Paul Sabatier Toulouse le 26 Juin 1980."},{"key":"10.1016\/S0378-4754(02)00020-4_BIB14","unstructured":"S. Viera Conceincao, C. Silvestre, Impl\u00e9mentation d\u2019un syst\u00e8me mixte de gestion de la production, 5\u00e9me congr\u00e8s international du g\u00e9nie industriel Avril 1994, Vol. I, pp. 131\u2013135."}],"container-title":["Mathematics and Computers in Simulation"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0378475402000204?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0378475402000204?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,4,13]],"date-time":"2019-04-13T13:58:14Z","timestamp":1555163894000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0378475402000204"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2002,9]]},"references-count":14,"journal-issue":{"issue":"3-5","published-print":{"date-parts":[[2002,9]]}},"alternative-id":["S0378475402000204"],"URL":"https:\/\/doi.org\/10.1016\/s0378-4754(02)00020-4","relation":{},"ISSN":["0378-4754"],"issn-type":[{"value":"0378-4754","type":"print"}],"subject":[],"published":{"date-parts":[[2002,9]]}}}