{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,28]],"date-time":"2025-10-28T14:33:00Z","timestamp":1761661980239},"reference-count":14,"publisher":"Elsevier BV","issue":"2","license":[{"start":{"date-parts":[[2003,6,1]],"date-time":"2003-06-01T00:00:00Z","timestamp":1054425600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Mathematics and Computers in Simulation"],"published-print":{"date-parts":[[2003,6]]},"DOI":"10.1016\/s0378-4754(03)00050-8","type":"journal-article","created":{"date-parts":[[2003,5,19]],"date-time":"2003-05-19T18:45:52Z","timestamp":1053369952000},"page":"105-117","source":"Crossref","is-referenced-by-count":12,"title":["Resource constrained scheduling simulation model for alternative stochastic network projects"],"prefix":"10.1016","volume":"63","author":[{"given":"Dimitri","family":"Golenko-Ginzburg","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Aharon","family":"Gonik","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Zohar","family":"Laslo","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"78","reference":[{"issue":"4","key":"10.1016\/S0378-4754(03)00050-8_BIB1","doi-asserted-by":"crossref","first-page":"297","DOI":"10.1080\/05695557308974916","article-title":"Project scheduling under resource constraints: historical review and categorization of procedures","volume":"5","author":"Davis","year":"1973","journal-title":"AIIE Trans."},{"key":"10.1016\/S0378-4754(03)00050-8_BIB2","doi-asserted-by":"crossref","first-page":"336","DOI":"10.1016\/0377-2217(88)90196-8","article-title":"Controlled alternative activity networks in project management","volume":"7","author":"Golenko-Ginzburg","year":"1988","journal-title":"Eur. J. Oper. Res."},{"key":"10.1016\/S0378-4754(03)00050-8_BIB3","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1016\/0925-5273(93)90014-C","article-title":"A two-level decision-making model for controlling stochastic projects","volume":"32","author":"Golenko-Ginzburg","year":"1993","journal-title":"Int. J. Prod. Econ."},{"key":"10.1016\/S0378-4754(03)00050-8_BIB4","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1016\/S0925-5273(96)00019-9","article-title":"Stochastic network project scheduling with non-consumable limited resources","volume":"48","author":"Golenko-Ginzburg","year":"1997","journal-title":"Int. J. Prod. Econ."},{"key":"10.1016\/S0378-4754(03)00050-8_BIB5","doi-asserted-by":"crossref","first-page":"391","DOI":"10.1057\/palgrave.jors.2600378","article-title":"A generalized activity network model","volume":"48","author":"Golenko-Ginzburg","year":"1997","journal-title":"J. Oper. Res. Soc."},{"key":"10.1016\/S0378-4754(03)00050-8_BIB6","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1016\/S0925-5273(98)00044-9","article-title":"A heuristic for network project scheduling with random activity durations depending on the resource reallocation","volume":"55","author":"Golenko-Ginzburg","year":"1998","journal-title":"Int. J. Prod. Econ."},{"key":"10.1016\/S0378-4754(03)00050-8_BIB7","unstructured":"A. Gonik, Planning and controlling R&D stochastic projects, a Ph.D. Thesis, Ben-Gurion University of the Negev, Beer-Sheva, Israel, 1995."},{"issue":"2","key":"10.1016\/S0378-4754(03)00050-8_BIB8","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1016\/0305-0483(87)90027-2","article-title":"A comparison between the VERT program and other methods of project duration estimates","volume":"15","author":"Kidd","year":"1987","journal-title":"Omega"},{"key":"10.1016\/S0378-4754(03)00050-8_BIB9","doi-asserted-by":"crossref","unstructured":"R. Kolish, Project Scheduling Under Resource Constraints, Physica-Verlag, 1995.","DOI":"10.1007\/978-3-642-50296-5"},{"issue":"5","key":"10.1016\/S0378-4754(03)00050-8_BIB10","doi-asserted-by":"crossref","first-page":"66","DOI":"10.1287\/inte.11.5.66","article-title":"Why projects are always late: a rationale based on simulation of a PERT\/CPM method","volume":"11","author":"Schonberger","year":"1981","journal-title":"Interfaces"},{"issue":"9","key":"10.1016\/S0378-4754(03)00050-8_BIB11","doi-asserted-by":"crossref","first-page":"811","DOI":"10.1057\/jors.1991.152","article-title":"Scheduling under a non-renewable resource constrained","volume":"42","author":"Toker","year":"1991","journal-title":"J. Oper. Res. Soc."},{"issue":"1","key":"10.1016\/S0378-4754(03)00050-8_BIB12","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1108\/01443579510077241","article-title":"A heuristic scheduling algorithm for improving the duration and net present value of a project","volume":"15","author":"Ulisoy","year":"1995","journal-title":"Int. J. Oper. Prod. Manage."},{"key":"10.1016\/S0378-4754(03)00050-8_BIB13","doi-asserted-by":"crossref","unstructured":"R.E. Walpole, R.H. Myers, Probability and Statistics for Engineers and Scientists, second ed., Collier Macmillan, New York, 1978.","DOI":"10.2307\/2530629"},{"key":"10.1016\/S0378-4754(03)00050-8_BIB14","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1016\/0377-2217(85)90026-8","article-title":"Critical path analysis and resource constrained project scheduling. Theory and practice","volume":"21","author":"Willis","year":"1985","journal-title":"Eur. J. Oper. Res."}],"container-title":["Mathematics and Computers in Simulation"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0378475403000508?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0378475403000508?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2020,3,20]],"date-time":"2020-03-20T02:40:24Z","timestamp":1584672024000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0378475403000508"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2003,6]]},"references-count":14,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2003,6]]}},"alternative-id":["S0378475403000508"],"URL":"https:\/\/doi.org\/10.1016\/s0378-4754(03)00050-8","relation":{},"ISSN":["0378-4754"],"issn-type":[{"value":"0378-4754","type":"print"}],"subject":[],"published":{"date-parts":[[2003,6]]}}}